Loading...
HomeMy WebLinkAbout2023-4141CONTRACT #2023-4141 CHITECTS DATE: March 21, 2023 TO: Kevin Hansen, Public Works Director City of Columbia Heights 637 38th Avenue NE Columbia Heights, MN 55421 RE: PROPOSAL FOR PUBLIC WORKS PRE -DESIGN DOCUMENT Kevin, This is a brief proposal for providing a state form Pre -Design Document to be used by the City as a submittal seeking State bond funding. Our understanding is to provide information assuming a new facility on the site of the existing public works building, which would be demolished. The program will follow that completed in the previous study with updates as necessary for staffing and equipment changes in the last two years. Site and floor plans will be revised/developed to incorporate a new street access along the east side of the existing site to connect 37th Avenue and 381h Place, allowing Madison Street to dead-end at the new facility. SCOPE OF WORK Working from the previous study material, we will update the staffing and equipment lists with any recent changes to incorporate in the space needs portion the document. Concurrently, we will revise the site and floor plans with the new street access concept. In revising the plans, up to two in -person review meetings will be held with additional remote meetings as necessary to produce site and floor plans approved by the City. We will also assist the City with the sections listed below to create a full story of project need and justification. Work for the various pre -design document sections will break down as thus: Section 1: Summary Statement: Consultant team, with input from City Section 2: Basis for Need: City, with input from consultant team Section 3: Agency/Organization Planning: City with input from consultant team Section 4: A/E program Consultant team Section 5: Site analysis Consultant team with input from City Section 6: Capital Expenditures Consultant team with operational cost info input from City Section 7: Schedule Consultant team SCHEDULE The team will work towards a final product within eight weeks of proposal approval. &N CHITECTS Not included in the scope are the following: Survey — we will assist in locating borings to be contracted and performed by others Additional Site Analysis (assume existing Public Works site only to be considered) Additional meetings beyond those noted PROPOSED FEE Our proposed fee includes architectural, mechanical and electrical consulting services. We propose a fee of $13,500 to complete the above work. CLOSING Thank you again and we look forward to continuing to work with you and the public works department. Sincerely, Debra Brandwick This proposal approved by: —Deh, L,� Debra Brandwick Principal Kelli J. Bourgeois�j City Manager Oertel Architects City of Columbia Heights