HomeMy WebLinkAbout2022-4072CONTRACT #2022-4072 M BOLTON & MENK Real People. Real Solutions. April 14, 2022 Kathy Young, Assistant City Engineer City of Columbia Heights 637 381h Avenue NE Columbia Heights, MN 55421 RE: Proposal for Construction Surveying and Staking Services Project 2202: (SAP 113-050-017) — Zones 6 and 7 Dear Ms. Young: 7533 Sunwood Drive NW Suite 206 Ramsey, MN 55303-5119 Ph: (763) 433-2851 Fax: (763) 427-0833 Bolton-Menk.com We appreciate the opportunity to assist the City of Columbia Heights with the construction survey for the above referenced project. We have reviewed the April 8, 2022 RFP and the March 31, 2022 plans for the project and developed our scope and fee based on those documents. SCOPE OF WORK Bolton & Menk will complete the following survey related tasks associated with the project: • Attend preconstruction meeting, • Establish horizontal and vertical control (including bench loop), ■ Create Stakeout Files, • Provide offset staking for public utilities (watermain and storm sewer) to include hydrants, manholes, catch -basins, etc., • Stake blue tops for subgrade and gravel grade, and • Stake concrete curb and gutter, pedestrian curb ramps and sidewalk. ASSUMPTIONS We have made the following assumptions in preparing this proposal: • In addition to the point data referenced in the RFP, all AutoCAD design data will be provided to us electronically. • No allowance is included for staking construction limits, • No allowance is included for staking removals, clearing, erosion control, or right-of-way. • No allowance is included for taking as -built measurements. • Replacing damaged or removed stakes is not included in our base fee. • We have allowed for 17 trips total, with an estimated time on -site equal to 128 hours. ■ Curb & gutter will be staked at 50 ft intervals in tangent sections of roadway and at 25 ft intervals in curved sections of roadway. • No additional fees for stakes, mileage, equipment, etc. will be invoiced to the City, but are included in our hourly rates. C\Users\kevinki\Desktop\CH 2O22 Staking\Culumhiu Heights 2022 Projects Staking Proposal 04122022 docx Bolton & Menk is an equal opporlundy 4mptoyur Kathy Young, Assistant City Engineer April 14, 2022 Page 2 of 2 • Additional services, if required, will be performed at the rates presented in the Proposed Fees section of this proposal. ■ Our typical response time is usually within 24 hours of the request, with a guaranteed response time of 48 hours. PROPOSED FEES Bolton & Menk proposes to perform the staking based on the hours and rates presented in the following table: Personnel Hours Rate/Hour Total Licensed Surveyor (Office Time) 10.0 $175.00 $ 1,750.00 Project Surveyor (Office Time) 12.0 $145.00 $ 1,740.00 Survey Crew (On -site Time) 128.0 $165.00 $21,120.00 Totals 150.0 - $24,610.00 If there are any questions, please call me at (651) 968-7760. Sincerely, BOLTON & MENK, INC. � � .0\ Kevin P. Kielb, P.E. Principal Engineer CITY OF COLUMBIA HEIGHTS, MN (Approved by City Council on 4 / 25 / 2022) zq 22 Ama Marquez Simula, Mayor Date 1�,��-7 14 -aA • zr Kelli Bourge City Manager Date CAUserxUcevinki\Desktop\CH 2O22 StakingWolumhia Heights 2022 Projects Staking Proposal 04122022.docx Bolton & Menk is an equal opparluni