Loading...
HomeMy WebLinkAbout2021-4029Contract # 2021- 4029 QBOLTON & MENK Real People. Real Solutions. May 4, 2021 Kathy Young, Assistant City Engineer City of Columbia Heights 637 381h Ave NE Columbia Heights, MN 55421 RE: Proposal for Construction Surveying and Staking Services (City Project 2103) Dear Ms. Young: 7533 Sunwood Drive NW Suite 206 Ramsey, MN 55303-5119 Ph: (7631 433-2851 Fax: 17631427-0833 Bolton-Menk.com We appreciate the opportunity to assist the City of Columbia Heights with the construction survey for the above referenced project. We have reviewed the April 7, 2021 RFP and the plans for the project and developed our scope and fee based on those documents. SCOPE OF WORK Bolton & Menk will complete the following survey related tasks associated with the project: • Establish Horizontal and Vertical Control (including bench loop), as needed; • Create Stakeout Files, ■ Stake Water Main, • Stake Miscellaneous Public Utility Repairs (as required) • Stake Blue Tops, and ■ Stake Concrete Curb and Gutter. ASSUMPTIONS We have made the following assumptions in preparing this proposal: • In addition to the point data referenced in the RFP, all AutoCAD design data will be provided to us electronically. • No allowance is included for staking construction limits, removals, clearing, erosion control, or right-of-way. ■ No allowance is included for taking as -built measurements. • Replacing damaged or removed stakes is not included in our base fee. If stakes are required to be replaced, we will track time separately and invoice the City separately for the work. • We will attend the preconstruction meeting, but not weekly construction meetings. • Our time estimates are based on previous experience working with the City of Columbia Heights. • We have allowed for 5 trips total, or approximately 3 hours for travel time. Actual field time performing survey related tasks would then be 61 hours. • Our usual response time is 24 hours, with a guaranteed response time of 48 hours. gnilon & Menk 15 an equ4i opporlunily employer. Kathy Young, Assistant City Engineer May 4, 2021 Page 2 of 2 • Curb & gutter will be staked on sections longer than 50 fL, while sidewalk will be staked on sections longer than 25 ft. ■ No additional fees for stakes, mileage, equipment, etc. will be invoiced to the City, but are included in our hourly rates. Additional services, if requested by the City, will be performed at the rates presented in the Proposed Fees section of this proposal. PROPOSED FEES Bolton & Menk proposes to perform the staking based on the hours and rates presented in the following table: Personnel Hours Rate/Hour Total_ Licensed Surveyor (Office Time) 4.0 $145.00 $ 580.00 Project Surveyor (Office Time) 4.0 $135.00 $ 540.00 Survey Crew (On -site Time) 64.0 $160.00 $10,240.00 Totals 72.0 - If there are any questions, please call me at (651) 968-7760. Sincerely, BOLTON & MENK, INC. Kevin P. Kielb, P.E. Principal Engineer ACCEPTED BY: Inw, DATF S•,0� Kelli Bourger�sCity Manager $11,360.00 aollon & Monk L4 an cyugl oppununrly 4mp lolr•