Loading...
HomeMy WebLinkAbout2020-3016Account No. XX-0013126328-X Job No. 11741983 Job Address 4121 Stinson Blvd Columbia Heights, MN 55421-3351 June 1, 2020 Dear City of Columbia Heights, (! Xcel Energy" Northern States Power Company -Minnesota 401 NICOLLET MALL -CSC MINNEAPOLIS, MN 55401 Thank you for choosing Xcel Energy to be your energy provider. We appreciate your business, and our goal is to deliver you reliable service at an affordable price. This letter contains important information about your requested service. Please read all details below as well as any accompanying information and respond accordingly to ensure your project is completed accurately and timely. This letter relates to your request for: � Extension of Gas and/or Electric Facilities Your portion of the cost of this project is $18,702.37. A hard copy invoice will be sent to you via U.S. Mail Postal Service in the coming days. Please see the attached payment options document for more instructions. Upon receipt of payment and other required documentation as noted below, your project will be scheduled and you will be notified of the scheduled date. If paying by check, please note the account number identified at the top of this letter on your check to ensure accurate and timely payment processing. Below is a list of additional documentation that you will need to review, sign, and return to the Xcel Energy Designer by email or U.S. Postal Service to their address listed at the bottom of the letter. Please retain a copy of all documentation for your records. � Documents to be returned to Xcel Energy: o Statement of Work Request 17-7012 � Additional enclosures: o Payment Options If you have any questions about the enclosures or about your specific job, please contact Tori Thompson at 612- 630-4405 and reference your account number and/or job number above. We look forward to being your energy provider. Sincerely, Tori Thompson CONTRACTOR*ST AFF AUGMENTATION 401 NICOLLET MALL -CSC MINNEAPOLIS, MN 55401 Xcel Energy Tori.K.Thompson@xcelenergy.com Contract # 2020-3016 (I Xcel Energy ® Customer Payment Options Xcel Energy offers seven payment options to pay for your construction project. Please select the payment options that work best for you. Payment options listed in order of quickest processing I MyAccountleBil/T" Register at xcelenergy.com to make a payment from your checking account. You can also enroll in eBill and an email will let you know your bill is ready to view at the MyAccount site in place of recei ving a mailed paper bill statement. MyAccount also provides a convenient list of your bill statement and payment history and retains your banking information for future use. Each additional account number will have to be added to your list of managed accounts within MyAccount. I Pay by Phone Make payment from your checking or savings account at no charge by using our automated phone system. Please call us at 800.895.4999. Credit/Debit Card Payment (Not available in TX) To pay by phone, call our payment processing partner, BillMatrix, at 888.747.1523. To pay online, visit xcelenergy.com and click on the link to BillMatrix. Please note the current fees along with payment information: •Personal credit card= There is a $2.90 per transaction charge. Payments accepted for up to $1,000 in one transaction for personal credit card. •Commercial credit card= There is a $29.95 per transaction charge. Payments accepted for up to $75,000 -with the corresponding fees in $3,000 increments. (i.e. 25 $3,000 payments@ $29.95 = $748. 75 fee) All credit card types allow a maximum 25 credit/debit card payments in a 30 consecutive day period, per Xcel Energy account, per credit/debit card. I Overnight Payment Delivery Options Send your payment and remittance stub including account number (written on the memo line of your check) via FedEx, UPS or USPS overnight delivery to: Xcel Energy Attn: Remittance Processing 414 Nicollet Mall, 3rd Floor Minneapolis, MN 55401-1993 Overnight delivery contact phone number: 612.330.5593. The following alternate zip-codes are also valid; Minneapolis, MN 55401-1927 Minneapolis, MN 55401-4993 I In-Person Pay Stations Pay in-person at a location near you by visiting xcelenergy.com for pay station locations. Please include the account number on the memo line of your check. Please note: A $1.50 transaction fee applies. I Pay by U.S Postal Service When sending payment by U.S. mail, please include the account number on the memo line of your check. Do not combine this payment with any other Xcel Energy bill payments. Mail check payments to: Xcel Energy P.O. Box 9477 Minneapolis, MN 55484-9477 Electronic Funds Transfer (EFT) (Only available to business) The Electronic Funds Transfer (EFT) payment process allows business customers to pay via Corporate Trade Exchange (CTX) formatted Automated Clearing House (ACH) (also referred to as EDl-820), the ability to electronically remit payment. The payments to Xcel Energy's bank accounts are initiated by the customer through a series of steps linked to the billing system. The CTX addenda records included with the funds transfer allow the posting of the payments to occur electronically to the account numbers provided by the customer. To obtain Xcel Energy's EFT bank account numbers and to provide transfer confirmation, please email CustReceive@xcelenerqy.com. Helpful hints to ensure accurate and timely processing of your payment: •For all payment options, please have your account number available and note on any payment documentation. •The hard copy invoice will be sent to you via U.S mail in the coming days. If you would like an electronic copy of our invoice prior to receiving the hard copy, please contact your Designer who is identified in the attached letter. •In order to apply payment to the correct account and avoid unnecessary delays, please make separate payments for each individual project or invoice. •Please note that depending on payment selection, it may take up to a few days to process your payment. ·'{},, Xcel Energy· UNDERGROUND SERVICE FORM In consideration of Northern States Power Company, a Minnesota corporation ("Xcel Energy") hereinafter called "Xcel Energy", extending its facilities to make 480/277 volt, 3 phase, 3 wire underground service available to (Customer) City of Columbia Heights at (Service Address) 4121 Stinson Blvd (City) Columbia Heights, MN the sum of 01gh1een thousand seven hundred 1wo donars and 311100 Dollars($ 18,702.37 ) will be paid to Xcel Energy by (if other than above) City of Columbia Heights Address (if other than above) 590 40 th Ave NE City/State/Zip Columbia Heig)its, MN 55421 In accordance with the following terms: Xcel Energy will install and terminal pole and 75 kVA transformer to provide service to lift station.The work will be completed after payment and this contract have been returned to Xcel. Receipt of the above amount hereby acknowledged on behalf of Xcel Energy by Tori Thompson 1. The Customer hereby grants Xcel Energy the right, privilege and easement to install, operate and maintain its underground facilities on the property as described above and/or the approximate location as shown on the attached "Exhibit A". 2. The Customer also agrees that, prior to Xcel Energy starting work, Customer shall ensure that (a) the route of Xcel Energy's underground installation shall be accessible to Xcel Energy's equipment; (b) all obstructions shall be removed from such route at no cost or expense to Xcel Energy; (c) all privately-owned underground facilities such as sewer, water, sprinkler systems, invisible fences, or gas, electric or communication lines are marked or exposed; (d) ground elevation along the route shall not be above or more than four (4) inches below the finished grade; and (e) the area under the transformer pad shall be compacted to at least 2000 lbs,/sq. ft . 3 City of Columbia Heights agrees to pay all additional costs incurred by Xcel Energy because of (a) surface or subsurface conditions that impair the installation of underground facilities, such as rock formations, etc., and (b) sidewalks, curbing, black top, paving, sod or other landscaping and obstructions along the cable route. Xcel Energy will backfill trench with existing soil. Restoration of construction area on Customer property is the responsibility of the Customer. 4. Xcel Energy is not responsible for any Customer-owned underground facilities not marked or exposed at the time service is installed. 5. The underground installation may be subject to a winter construction charge if construction occurs between October 1 and April 15. City of Columbia Heighls agrees to pay this charge if Xcel Energy determines winter conditions, as defined in the General Rules and Regulations of Xcel Energy's Electric Rate Book as they exist at the time the underground facilities are installed, Xcel Energy will waive the winter construction charge if prior to October 1st the Customer is ready to accept electrical service, has executed this form and has notified Xcel Energy in writing that the requirements of Paragraph 2 hereof have been fulfilled. 6. The underground facilities installed by Xcel Energy, shall be the property of Xcel Energy and any payments made by the Customer, or their Customer's contractor, shall not entitle the Customer to any ownership interest or rights therein. 7. The Customer agrees to pay the cost of installing or relocating any portion of said underground facilities from the Company's designated location, if relocation is made to accommodate the customer's needs, or necessary because of Customer alterations to the grade, additions to structures, installation of patios, decks or gardens or any other surface or subsurface condition that makes maintenance of Xcel Energy's facilities impractical. 8. Customer must provide, at minimum, the following clearance around the transformer: front, 10 feet; sides and back, 2 feet. EXCEPTION: side facing building must have 30" clearance. These clearances must be at the same grade as the transformers. If screening is to be used, the area in front of the transformer must be left open or a hinged door, easily operable by one person, must be provided. The area must be accessible 24 hours a day, (l Xcel Energy· $ $ $ $ $ 18,702.37 Excess U.G. Distribution Lateral $ ___ o_._oo_Winter Construction Charge (Primary Cable) (See Paragraph 5) ___ o_.o_o Excess U.G. Service Lateral $ o.oo Specific Service Location or Route ___ o._oo_U.G. Service Lateral $ o.oo Replace Overhead Line with Underground(Secondary Service From Utility Pole) ___ o._o_o U.R .D. Install Including UG Service Lateral $ ___ o_._oo_Temporary Service KVA ___ o._o_o U.G. Distribution Lateral $ o.oo Other (Explain) (Primary Cable) Trench Ft. $ 18,702.37 TOTAL **Customer agrees to pay monthly Residential Service Underground rate of the type of installation indicated by a double asterisk. 0Applicable Dated this Customer day of ___ iNot Applicable Jun�. 1o2 Qoated this ____ day of ..,,t"-l�_.,,.'.l=}_,l....,.h...,,�U4't'b4:-=>-a.,,,,,,,._,\\�'u...,.����---Contractor ____________ _Prf�ull Name Sf;kture Print Full Name Signature Customer Rep � b� Contractor Rep Print Full Nam��re Print Full Name Signature Xcel Energy Rep ________________ Xcel Energy Work Order# Print Full Name Signature Construction$ _1_8�,7_0_2_.3_7 _____ Removal$ Form 17-2759 _________ .-Total $_1_8.a..,7_0_2_.3 _7 ___ _ 5/26/2020 Planner 10 1242690 Description Planner Name I Tori Thompson JMPL/TKT/4121 STINSON BLVD/PADMTJINSTL Customer Name Phone# 612-630-4405 Install TP and 75kVA 277/480V transformer and 200A service for lift station. -�·,. "" . SAP Non-Ref New Business D Pre-Cap Material D Con sir Allowance SAP Ref D Pre-Cap Material D Constr Allowance SAP Comp I Company Funded @ Pre-Cap Material Add Pre-Cap (SAP) Internal Comments: � ; . ,, ::;pec,al Fa cmt1es I C ompany Funded 1x EUTFP75J3T ($4,565.00ea) I I I Job Cost Total Manual Pre-Cap Total SAP Tota Company Funded Tota Billable Tota Total Man-Hours Install TP and 75kVA 277/480V transformer and 200A service for lift station Comments to Customen State MINNES0rA Svc S(ate MN Bill State MN . .. $18,702.37 D $0.00 $0.00 0 $0.00 $0.00 0 $0 ,00 $0,00 D $0.00 $0 .00 0 $0.00 $0.00 0 $0,00 $0.00 0 $0.00 $0,00 D $0,00 $0 .00 D $0.00 $0 .00 0 $0 00 $0.00 0 $0.00 $0.00 D $0.00 $0.00 0 $0.00 $0 .00 D $0 ,00 $0.00 D $0 ,00 $0.00 D $0 00 $0 00 D $0,00 $0 00 D $0,00 $0.00 D $0.00 $0.00 0 $0.00 $0.00 D $0 00 $0.00 D $0 00 $0.0Q D $0.00 $0.00 D $0.00 $0 .00 0 $0.00 $0.00 D $0.00 $0.00 D $0 00 $0 00 0 $0.00 $0 00 D $0 .00 $0.00 D $0 .00 $0.00 D $0.00 $0 00 0 $0.00 $773.53 $4.565.00 $0,00 $0.00 $0 00 $0 00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tax Gross-Up $24 040.90 Excise Tax I $0,00 Sales Tax I $24,040 90 $5.338,53 Total Revenue $18,702.37 so.ool 102,0 INSTALL TP AND 75KVA 277/480V TRANSFORMER AND 200A SERVICE FOR LIFT STATION. PRICE ON INVOICE VALID FOR 90 DAYS OF STATEMENT DATE. !Extension Info CIAC Version 093 Customer# CRSAcct# PBC# CRS BIii Date Meter Count Agree. Type Date/Time Created 6/1/2020 9:43AM Service Notification Number I 11741983 Total Contribution $18,702.37 In Ci limits Yes 45.043179° -93.228965" .. CRS Code $18 702 37 8399 (NREFJ $0.00 SO.DO ' so o_o $0.00 sor oo so.co ; $0 00 !$0.00 , so.co so.co SO,OO ' SO.OD $0,00 I $0,00 � $0.00 $0,00 : $0.00 : $0 00 $0 00 $0.00 $0.00 $0.00 $0.00 ' $0 00 ' $0 00 � $0.00 � $0.00 � $0 .00 . $0.00 � $0.00 -$0 00 $0 00 - ' $0 00 1 $0.oot CIAC Total S18 702.371 Tax Exempt Customer No Reviewed by: CITY OF COLUMBIA HEIGHTS AGREEMENT FOR CONSTRUCTION ON PRIVATE PROPERTY Columbia Heights "'¼" Number, 2000 Datef: l.'1, 3 '.At, ,7..D 7�C:- Property Owner(si\ c.o � A�o C) C' /\ 1.'.\:L Su-n Phone: { (flt) -d L\ t -'-Lor'-r ,:;::.H� (' c-_ Address or Legal Description: 685 491h Avenue NE�\... '<) ...,.-l.(\i.__,.__ "00 Y) T'f':'I om It M y Concern: !, \ \; J � 1 �S I\ the undersigned property owner(s), request and authorize the City of Columbia Heights sing its employee labor forces or by use of its current contracts, to perform, upon such part of my property as may be deemed necessary, the following work: ENGINEER'S ESTIMATE BASED ON ESTIMATED QUANTITIES ONLY Construct 4" Concrete Cart Pad Construct 6" Concrete Cart Pad Dimensions, Ft. by Ft. 2 pads at 3' by 3.5' 2 pads at 3' by 3.5' Amount $ 150.0 $ 225.00 For and in consideration of the construction by the City of Columbia Heights, under the direction of the City Engineer, of such additional work, made desirable by the construction of the above mentioned project, I do hereby agree to pay the Engineer's Estimate in full prior to the start of construction, If the actual construction cost is less than the Engineer's Estimate the difference will be refunded. If the actual construction cost is more than the Engineer's Estimate, I do hereby pledge to pay for actual construction quantities at the agreed bid prices in full, to the City, within thirty (30) days after billing. And further, as undersigned, release the City of Columbia Heights and its employees from any claim or causes of action in connection with the construction authorized above. Warranty he contract the City has with the Contractor includes a one-year warranty from the time of completion. The City's sole responsibility with regard to the warranty i to be sure that the contract specifications are met. The City does not warrant the work of the Contractor. If the work done meets the specification requirements in the judgement of the City Engineer, but you are not satisfied, you will have to contract the Contractor directly. ROPERTY OWNER(S)\-S Gwo b: � A t;jO c-(, • Q PY ��.,:;'.C) THE CITY OF COLUMBIA HEIGHTS (Owner) Remit signed form with payment to: City of Columbia Heights Mail or drop off at Municipal Service Center 637 -381h Avenue NE, Columbia Heights, MN 55421 To be filled in after construction, only if there is a change in quantity of work done: Dimensions, Ft. by Ft. Construct 4" Concrete Cart Pad ?-. -3 \ ;>_6 .3, S Construct 6" Concrete Cart Pad Page 1 of 1 (5/2020) copy: Public Works Amounts 150.oo $ ____ _ copy: Property Owner(s)