HomeMy WebLinkAbout05-04-2020 City Council Work Session PacketMayor
Donna Schmitt
Councilmembers
Robert A. Williams
John Murzyn, Jr.
Connie Buesgens
Nick Novitsky
City Manager
Kelli Bourgeois
City of Columbia Heights
590 40th Avenue NE, Columbia Heights, MN 55421-3878 (763) 706-3600
Visit our website at: www.columbiaheightsmn.gov
NOTICE OF
WORK SESSION
Auxiliary aids or other accommodations for disabled persons are available upon request when the request is made at least 48 hours in advance.
Please contact Administration at 763-706-3610 to make arrangements.
Meeting of: Columbia Heights City Council
Date of Meeting: May 4, 2020
Time of Meeting: 7 pm
Location of Meeting: City Hall- Council Chambers
Purpose of Meeting: Work Session
1.Reuter Walton Site Concept- Pg. 3
2.Utility Billing Correction 1070 Grandview Court- Pg. 6
3.General Discussion of Pandemic Effects on 2020 Budget Results
4.Parks Use and Programming and Other City Programs for the Season- Pg. 7
5.Fairview Ramp Discussion- Pg. 9
6.City Hall Schematic Design, Floorplan, and Building Elevations- Pg. 97
7.Board & Commission Interviews- Pg. 173
1
AGENDA SECTION WORK SESSION
ITEM NO. 1
MEETING DATE MAY 4, 2020
CITY OF COLUMBIA HEIGHTS - COUNCIL LETTER
ITEM: Discuss Development Concept for Public Safety Remnant Parcel
DEPARTMENT: Community Development CITY MANAGER’S APPROVAL:
BY/DATE: Aaron Chirpich – 4-30-2020 BY/DATE: 5/1/20
CITY STRATEGY: #2: Economic Strength
Additional Strategy? #6: Excellent Housing/Neighborhoods
SHORT TERM GOAL (IF APPLICABLE): N/A
Additional Goal? N/A
BACKGROUND:
At the December 2019 work session, the Council met with representatives from Reuter Walton Development
regarding their interest in constructing an apartment on the vacant lot located behind the public safety
building. The property is approximately 1.6 acres in size, and has the potential to support a variety of
residential development types. The preliminary concept presented by Reuter Walton included 63 units of
income restricted affordable housing targeted at families with household incomes at or below 60% of the area
median income.
At the same work session, the Council discussed the future expansion needs for the SACA food shelf and thrift
store. SACA has outgrown their current building and they are looking to build a new facility in Columbia
Heights that will allow their business operations to grow. Given SACA’s expansion needs and the desire to
keep SACA in the community, the public safety site emerged as a viable option.
Given the interest in the same site from two potential users, staff and the Council directed Reuter Walton to
work with SACA to develop a concept plan that would incorporate space for a new SACA facility and the
affordable housing project on the same site. Since the December 2019 work session, Reuter Walton, SACA
staff, and City staff have collaborated to create a framework for a potential mixed-use development/
partnership for the site. To accommodate the space needs of the new 12,000 square foot SACA facility, Reuter
Walton has decreased the number of units and reconfigured the apartment building layout. Under the revised
plan, the apartment complex and SACA facility would share surface parking that could alternate between
SACA use during the day and apartment use after business hours. The revised concept plans are attached to
this report.
For this work session, Reuter Walton will be in attendance to discuss the revised plans and to share their vison
for how to move the project forward. At this time, SACA is not in a position to fully commit to the partnership.
However, Reuter Walton is ready to bring the apartment project to fruition. Staff believes that it is possible to
move the apartment project forward while saving space for a future SACA relocation on the same site. To this
end, Reuter Walton will be seeking feedback from the Council and gauging the Council’s interest in the revised
concept. If the Council is interested in moving forward, Reuter Walton would like to apply for low income
housing tax credits (LIHTC) to support the project. The applications for LIHTC projects are due in mid-July.
2
City of Columbia Heights - Council Letter Page 2
ATTACHMENTS:
•Concept Plans
•Sample Rendering
3
Rentable Area Legend
1BR
2BR
3BR
AMENITY
CIRCULATION
COMMERCIAL
COMMON AREA
ELECTRICAL
MECH
PARKING
TRASH
42ND AVE NE
JA
C
K
S
O
N
S
T
.
N
E
4730 SF
COMMON
AREA
FOOD SHELF
12,040 SFTOT LOT AND
RECREATION
1280 SF
3BR
1010 SF
2BR1395 SF
3BR
705 SF
1BR
1010 SF
2BR
705 SF
1BR
980 SF
2BR
705 SF
1BR
1255 SF
3BR
1265 SF
3BR
1265 SF
3BR
1285 SF
3BR
1280 SF
3BR
230 SF
CIRCULATION
230 SF
CIRCULATION
FOOD SHELF ENTRYAPT. ENTRY
TRUCK DOCKS
ALLEY ACCESSFOOD SHELF SPACES
DURING BUSINESS HOURS
ADA
ADA
AD
A
AD
A
RAMP TO GARAGE
20035 SF
PARKING
165 SF
CIRCULATION
205 SF
CIRCULATION
165 SF
CIRCULATION
235 SF
TRASH
370 SF
MECH
245 SF
MECH
185 SF
ELECTRICAL
ADA
ADA
1340 SF
3BR
1390 SF
3BR
1280 SF
3BR
1010 SF
2BR1395 SF
3BR
705 SF
1BR
1010 SF
2BR
705 SF
1BR
980 SF
2BR
705 SF
1BR
1255 SF
3BR
1265 SF
3BR
1265 SF
3BR
1285 SF
3BR
1280 SF
3BR
230 SF
CIRCULATION
235 SF
CIRCULATION
2000 SF
COMMON
AREA
UNIT BREAKDOWN
UNIT TYPE COUNT
1 BR 12
TOTAL 58
2 BR
3 BR
12
34
PARKING BREAKDOWN
TYPE COUNT
GARAGE 54
2 ADA
TOTAL 111
SURFACE 51
4 ADA
%
58
21
21
Copyright 2020 DJR Architecture, Inc.
PLANS AND MATRIX
COLUMBIA HEIGHTS, MN
RWD
19-094
04/06/20
1" = 60'-0"
FLOOR PLAN -LEVEL 1
AREA SCHEDULE (GROSS)
Name Level Area
1BR Not Placed 0 SF
2BR Not Placed 0 SF
3BR Not Placed 0 SF
CIRCULATION Not Placed 0 SF
COMMON AREA Not Placed 0 SF
Not Placed 0 SF
CIRCULATION LEVEL P1 542 SF
ELECTRICAL LEVEL P1 187 SF
MECH LEVEL P1 619 SF
PARKING LEVEL P120,036 SF
TRASH LEVEL P1 236 SF
LEVEL P1 21,621 SF
1BR LEVEL 1 2,118 SF
2BR LEVEL 1 3,008 SF
3BR LEVEL 1 9,045 SF
CIRCULATION LEVEL 1 470 SF
COMMON AREA LEVEL 1 4,735 SF
LEVEL 1 19,375 SF
1BR LEVEL 2 2,118 SF
2BR LEVEL 2 3,008 SF
3BR LEVEL 2 11,776 SF
CIRCULATION LEVEL 2 473 SF
COMMON AREA LEVEL 2 2,004 SF
LEVEL 2 19,379 SF
1BR LEVEL 3 2,118 SF
2BR LEVEL 3 3,008 SF
3BR LEVEL 3 11,776 SF
CIRCULATION LEVEL 3 473 SF
COMMON AREA LEVEL 3 2,004 SF
LEVEL 3 19,379 SF
1BR LEVEL 4 2,118 SF
2BR LEVEL 4 3,008 SF
3BR LEVEL 4 11,776 SF
CIRCULATION LEVEL 4 473 SF
COMMON AREA LEVEL 4 2,004 SF
LEVEL 4 19,379 SF
Grand total 99,133 SF
1" = 60'-0"
LEVEL P1
1" = 60'-0"
FLOOR PLAN -LEVEL 2-4 TYP3" = 1'-0"
Henn Co Property Map
4
5
AGENDA SECTION WORK SESSION
ITEM NO. 2
MEETING DATE MAY 4, 2020
CITY OF COLUMBIA HEIGHTS - COUNCIL LETTER
CouncilLetter_WorkSession_050420.docx
ITEM: CORRECTION OF UTILITY BILLING FOR 1070 GRANDVIEW COURT
DEPARTMENT: Finance CITY MANAGER’S APPROVAL:
BY/DATE: Joseph Kloiber/April 30, 2020 BY/DATE: 5/1/20
CITY STRATEGY: #3: Affordability
Additional Strategy? #2: Economic Strength
SHORT TERM GOAL (IF APPLICABLE): N/A
Additional Goal? N/A
BACKGROUND: There has been a significant long-running billing error on the utility account for Grand Central Lofts, the
67 unit condominium development built by Nedegaard at 1070 Grandview Court in 2005-2006. Since its inception, this
customer has been set up with a nonresidential billing structure instead of the appropriate residential billing structure.
The primary difference being that a correct residential bill would include a quarterly flat fee for water and sewer for
each of the 67 dwelling units, in addition to volume charges; whereas a nonresidential bill includes only one quarterly
flat fee for water and sewer in addition to volume charges. Although a nonresidential flat fee for a customer with a
large water meter is much higher than a residential flat fee, it is nowhere near the amount of 67 residential flat fees. A
correct quarterly bill for this customer is approximately $2,000 higher than they have been billed. This equals about a
$10 increase in monthly homeowner association fees for each of the 67 condo owners.
Staff speculates that this billing error may have been originally intended as just a temporary method to bill this customer
while they were under development, until they reached their originally-planned completion of some 150-200 units. As
some may recall, only the first of the three planned phases were completed on this development before the national
housing bubble burst and the development went into default in 2007, under a publicized cloud of fraud committed
simultaneously by the same developer at a much larger development in Ramsey. After the Grand Central Lofts
development defaulted, both the billing clerk position and the community development director position turned over,
leaving no organizational “trigger” to revise this presumably temporary billing treatment.
One indication this was only intended as a temporary billing treatment, is that this customer is still being billed today for
7.0 acres for storm water purposes, when they have long since retained only 1.7 acres following the default. Effectively,
the nonresidential billing structure from the Kmart that previously occupied the 7.0 acre site was initially applied to the
bare 7.0 acre redevelopment site, and then the new water meter for Phase 1 was simply added to the developer’s bill
when it was installed. Staff further speculates that the City may have been unable to bill for 67 flat fees at that time,
since a number of these completed Phase 1 units were never initially sold or occupied during much of the ensuing Great
Recession.
The resulting over-billed storm water fees are offset against the under-billed water and sewer fees, in calculating the
$2,000 quarterly correction above. This offset is quite small however, as storm water fees are only small portion of the
customer’s bill.
A key issue in this matter is how to address prior quarterly bills at this point. The statute of limitations for correcting
past billing errors is six years. The general precedent used when correcting other customer accounts has been to bill for
substantially the entire under-billed amount, with no interest or penalty, with payment spread over multiple years. Staff
isn’t aware however, of any other past customer billing errors on this large of a scale.
6
AGENDA SECTION WORK SESSION
ITEM NO. 4
MEETING DATE MAY 4, 2020
CITY OF COLUMBIA HEIGHTS - COUNCIL LETTER
ITEM: Parks Use and Programming and Other City Programs for the Season
DEPARTMENT: Recreation CITY MANAGER’S APPROVAL:
BY/DATE: Keith Windschitl, Recreation Director BY/DATE: 5/1/20
CITY STRATEGY: #1; Safe Community
Additional Strategy? #4: Opportunities for Play and Learning
SHORT TERM GOAL (IF APPLICABLE): N/A
Additional Goal? Chhhhh hh hhhhh
BACKGROUND:
An email was sent to the Park and Recreation Commission indicating that the City Council will be having a
work session to discuss the city park facilities and recreation programs. Staff asked for input, thoughts, or
opinions on the following topics:
Parks, Playgrounds, Splash Pad, Wading Pools, and Summer Recreation Park Programs
We also noted that the City currently has not closed or blocked off any parks or playground equipment. Staff
has posted signs reminding the public of social distancing practices and that we strongly discourage the use of
the playground equipment due to the difficulty of maintaining the proper distance and lack of sanitization. The
playground equipment is not sanitized. The Commission was informed that Minneapolis has closed many of
these types of facilities which may result in an increased number of people at our parks, splash pad, and
wading pools. The City of St. Anthony is also not opening their splash pad for 2020.
The current plan for the Summer Recreation programs is to offer programming as usual while trying to keep
social distancing practices in mind. Staff is also trying to be creative with alternative plans using social media
avenues if the Governor enacts further restrictions.
Below are the comments received from the Park & Recreation Commission:
•I would say that the splash pad and pools should remain closed this summer. The pool closures would
also alleviate some labor requirements for the parks this summer.
•Pools and water park close, Basketball hoop blocked, Playground closed, Tennis courts open, Ball fields
not sure on this one.
•I see that Anoka County Parks are open, but the playground equipment “yellow taped” to keep the kids
off. We may have some parks where CH can do the same. Would like to have places to go without
having them have to go far from home. For sure pools and splash pad should remain off limits.
7
City of Columbia Heights - Council Letter Page 2
• For the closing of parks I for one hate to see it happen for the residents and the children of Heights, but
I understand that we need to all keep safe. I would like to follow our Governor as to his suggestions for
our community for what we do from here on out.
RECOMMENDED MOTION(S): Based on the recommendation of the Park and Recreation Commission; for the
program year of 2020, close our water facilities including 2 wading pools and the splash pad.
8
AGENDA SECTION WORK SESSION
ITEM NO. 5
MEETING DATE MAY 4, 2020
CITY OF COLUMBIA HEIGHTS - COUNCIL LETTER
ITEM: Discuss Van Buren Parking Ramp Operations and Maintenance Contract
DEPARTMENT: Community Development CITY MANAGER’S APPROVAL:
BY/DATE: Aaron Chirpich – 4-30-2020 BY/DATE: 5/1/20
CITY STRATEGY: #7: Strong Infastructure/Public Services
Additional Strategy? #1; Safe Community
SHORT TERM GOAL (IF APPLICABLE): N/A
Additional Goal? N/A
BACKGROUND:
For several years, the City has shared the costs for operating and maintaining the municipal parking ramp
located at 4025 Van Buren Street NE. The various cost sharing agreements have been between the City, and
the owner and tenants of the adjacent office building located at 4000 Central Avenue. The most recent
operations and maintenance agreement for the ramp expired on January 1, 2020. This agreement was
between the City, Columbia Park Properties, and Fairview Health Services. Fairview Health Services had been
operating as the tenant of the office building until the summer of 2019 when Fairview purchased the building
from Columbia Park Properties.
Before the expiration of the most current agreement, staff reached out in August, 2019 to representatives of
Fairview Health Services to discuss renewal of the agreement. At that time, staff conveyed a desire to continue
under the same basic parameters and renew the agreement for another five year term. The Fairview
representatives indicated that this proposal was likely acceptable pending board review. In October of 2019
staff reached out again to Fairview to see if they were ready to renew the agreement. At this time, they
indicated that they would like to renegotiate the terms of the agreement rather than renew.
Under the most recent agreement that has expired, Fairview was responsible for the physical maintenance
and operations of the ramp and the City would reimburse Fairview for 40% of the annual costs. Fairview has
indicated that they are no longer interested in being responsible for the operations and maintenance of a City
owned asset. As such Fairview has proposed to lease individual parking stalls from the City to contribute to the
annual cost of maintaining the ramp with the City as operator. To this end, Fairview has proposed to lease 130
stalls per year at a rate of $20 per stall per month. This equates to $31,200 annually.
In general, staff finds the Fairview proposal acceptable. To begin, staff understands Fairview’s desire to
eliminate their management responsibility, as the City owned ramp is used by the general public and not just
Fairview employees and customers. Secondly, the amount of parking spaces (130) Fairview proposes to lease
is reasonable to staff. A recent study commissioned by the City revealed that Fairview visitors and staff
accounted for 60% of the daily vehicle traffic using the ramp. This does not mean that Fairview utilizes 60% or
186 of the total spaces at any given time, as vehicles come and go throughout the day. Therefore, staff
considers that 130 spaces will reasonably accommodate the daily needs of Fairview traffic during peak times.
Finally, when looking at the City’s cost sharing proportion over the past five years, the average annual City
contribution (40% of costs) has been $14,400. This means that the average annual total maintenance costs
9
City of Columbia Heights - Council Letter Page 2
paid by Fairview have been around $36,000. Therefore, Fairview is willing to contribute an amount that nearly
covers the overall annual operations and maintenance costs for the ramp on their own.
ADDITIONAL CONSIDERATIONS:
1. Capital Improvements:
In addition to considering the annual operations and maintenance costs, the City must consider the
cost of capital improvements for the ramp. To this end, in 2018 the City contracted with the
engineering firm Kimley Horn to complete an assessment of the parking ramp and compile a five year
phased capital improvement plan. This five year plan suggests that $625,500 worth of improvements
are required at this time. When the report was completed in 2018, it was assumed that Fairview Health
Services would pay for 60% or $375,300 of the required capital improvements over a five year span.
However, the City never executed a formal agreement with Fairview to secure this commitment. As
part of Fairview’s current lease proposal, they have agreed to contribute a one-time payment of
$91,500 toward capital improvements.
2. Additional Revenue:
The City currently uses lease revenue from the T-Mobile rooftop lease at the Parkview Villa building to
pay for its share of the operations and maintenance of the ramp. The majority of this annual revenue
of approximately $25,000 could be utilized to save for capital improvements, as the new lease revenue
from Fairview will come close to covering the overall annual operations and maintenance costs of the
ramp. The City will continue to receive T-Mobile lease revenue through 2027. Therefore, the City can
expect an additional $170,000 to apply to costs associated with the ramp.
In addition to renting parking spaces to Fairview, the City can consider renting spaces to other users
located in the Central Business District. Staff has not completed any modeling of this potential.
However, it is clear that the ramp is currently underutilized and there is excess capacity for additional
renters.
ATTACHMENTS:
• Draft Lease
• Kimley Horn Condition Assessment
10
PARKING STALL LEASE
THIS PARKING STALL LEASE (“Lease”) is entered into this ___ day of _______ 2020, by and between City of
Columbia Heights with the address of 590 40th Avenue NE, Columbia Heights, MN 55421, hereinafter referred to
as “Lessor” and Fairview Health Services, a Minnesota nonprofit corporation with an address of 2450 Riverside
Avenue south, Minneapolis, MN 55454, hereinafter referred to as “Lessee” for stalls in the parking ramp located
at 4011 Van Buren Street adjacent to the building at 4000 Central Ave NE, Columbia Heights, MN (the “Parking
Ramp.”) The Lessor and the Lessee shall also be referred to herein each as a "Party", and collectively as the
"Parties".
RECITALS
WHEREAS, Lessor owns the Parking Ramp located at 4011 Van Buren Street, Columbia Heights,
Minnesota, which contains 310 parking stalls; and
WHEREAS, Lessor and Lessee were previously parties to an agreement under which Lessee operated the
Parking Ramp for Lessor, which was open to free use by the public, which agreement terminated December 31,
2019; and
WHEREAS, Lessee owns a building adjacent to the Parking Ramp and needs parking stalls for its
employees, agents, consultants, affiliates, guests, and invitees; and
WHEREAS, Lessor has agreed to lease to Lessee and Lessee has agreed to lease from Lessor, parking
stalls in the Parking Ramp, on the terms and conditions herein contained.
NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is hereby
acknowledged, the Parties hereby covenant and agree as follows:
1. Leased Stalls. Based on the terms and information stated in the recitals above, which is an integral
part of this Lease and is incorporated herein, Lessor hereby leases to Lessee 130 parking stalls in the
Parking Ramp and access thereto (“Leased Stalls”). On May 1 of each year of the term, the Parties
may adjust the number of stalls needed if Lessee’s utilization changes by more than 10%.
2. Term. The Lease shall be for an initial five (5) year term commencing on May 1, 2020 (the "Effective
Date") and terminating on April 30, 2025, (the "Term").
3. Gross Rent. During the Term, the Lessee shall make monthly gross rent payments to the Lessor in the
amount of $2,600 ($20 per stall) per month on or before the first day of each month (“Rent”),
beginning on the Effective Date. The Lessee shall make each Rent payment to the Lessor at the
Lessor's address set forth above, or at such other place or to such other persons or entities as the
Lessor from time to time may designate to the Lessee in writing.
11
4. Service Provided; Repairs, Maintenance and Alterations. The Lessor shall have the full and sole
responsibility for the condition, operation, repair, replacement and maintenance of the Parking Ramp
during the Term. The Lessor shall maintain the Parking Ramp in substantially good condition of
repair and appearance during the Term, ordinary wear and tear and casualty excepted. The Lessor
shall keep the Parking Ramp clear of snow and debris, shall keep the green space and perimeter
sidewalks clear of snow and debris and shall maintain grass. If the Lessor needs to make alterations,
additions or improvements (herein referred to as “Improvements”) to the Parking Ramp, it shall
provide the Lessee with written notice prior to the Improvements, and if necessary, adequate nearby
parking during this Improvement period. By May 31, 2020, the Lessee agrees to pay the Lessor a one-
time payment of $91,500 for deferred maintenance.
5. Lessee’s Use. The Lessee's sole use of the Leased Stalls shall be for parking for its employees, agents,
consultants, affiliates, guests, and invitees.
6. Indemnity; Insurance. Lessee shall indemnify Lessor (and its officers, directors and employees)
against, and save Lessor (and its officers, directors and employees) harmless from, any and all losses,
damages, claims, liabilities, judgments, costs and expenses (including the reasonable cost and
expense of defending any claim) (collectively, "Losses"), arising directly or indirectly during the term
of this Lease out of any act, omission or negligence of Lessee, its agents, employees, consultants,
affiliates, guests, invitees and third party assignees, and designees. Lessee will carry general liability
insurance reasonably sufficient to cover its indemnification obligations hereunder and shall, upon
request, provide Lessor a Certificate(s) of Insurance naming Lessor as additional insured under such
insurance.
7. Default. In the event that the Lessee shall fail to pay Rent or any part thereof when due or shall
violate or fail to perform any of the covenants hereof on the part of the Lessee to be performed (each
such event, a "Default"), after providing written notice of such Default, and if the Default is not
cured within twenty (20) days of such notice, the Lessor may:
a. Re-enter the Leased Stalls by summary proceedings or otherwise and re-let the Leased Stalls to a
third party or parties, making commercially reasonable efforts therefor, and upon receiving rent
therefrom, applying the same first to the payment of Rent and other fees and expenses accruing
hereunder, and the balance, if any, to be retained by Lessor; provided, however, that the Lessee
shall remain liable for the equivalent of the amount of all Rent and other payments due, as the
case may be, throughout the remaining term of this Lease to the extent such amounts are not
mitigated by such third party lessee or lessees; or
b. Terminate this Lease and resume possession of the Leased Stalls wholly discharged from this
Lease. If the Lessor terminates this Lease as set forth in this Section 7, then immediately upon
such termination, all rights and obligations whatsoever of the Lessee and of its successors and
assigns under this Lease, so far as the same may relate to the unexpired portion of the term
hereof, shall cease.
12
8. Option to Renew. The Lessee will have the option to renew for 2 consecutive 5-year periods by
notifying the Lessor 90 days prior to the expiration of the Lease. The Rent will be at market rate and
will not be more than $22 per parking stall for the first option period and not more than $24 per stall
for the second option period.
9. Early Termination. Notwithstanding any other term of this Lease to the contrary, (and in addition to
the Parties' other rights herein to terminate this Lease), during the Term the Lessee shall have the
right to terminate this Lease by providing not less than one (1) year written notice to the Lessor. Upon
any such termination, this Lease shall terminate and expire on the date specified in such notice as if
this Lease had expired by lapse of time.
10. Successors and Assigns. Except as otherwise set forth in this Lease, the agreements and conditions in
this Lease shall be binding upon each Party and its successors and assigns and shall inure to the
benefit of each Party and its successors and assigns.
11. Quiet Enjoyment. Upon the Lessee's payment of the Rents and other required payments herein
provided, and upon the Lessee's observance and performance of all the covenants, terms and
conditions to be observed and performed pursuant to this Lease, the Lessee shall peaceably and
quietly hold and enjoy the Leased Stalls for the term hereby demised without hindrance or
interruption by the Lessor or any other person or persons lawfully or equitably claiming by, through
or under the Lessor..
12. Force Majeure. The time within which either party shall be required to perform any covenant or
obligation in this Lease shall be extended, without liability to the other party, if the performance or
non-performance of the covenant or obligation is delayed, caused or prevented by an act of Force
Majeure, provided, however, that such party claiming Force Majeure gives reasonable notice to the
other party of the Force Majeure occurrence causing such delay or non-performance. For purposes of
this Lease, "Force Majeure" shall mean any circumstance beyond a Party’s control, including but not
limited to, an act of God; fire; earthquake; flood; explosion; actions or the elements of war; invasion;
insurrection; riot; mob violence; sabotage; terrorist act; epidemic or pandemic; inability to procure
equipment, facilities, materials or supplies in the open market; failure of power; failure of
transportation; strikes; lockouts; actions of labor unions; condemnation; requisition; laws; or orders of
governments or civil or military authorities. The non-performing Party shall be diligent in attempting
to remove any such cause and shall promptly notify the other Party of the extent and probable
duration of such cause.
13. Notices. All notices sent or required to be sent hereunder shall be sent in writing by personal delivery,
nationally recognized courier service, or registered or certified mail, return receipt requested, postage
prepaid, and in each case to the addresses set forth in the caption to this Lease above or to either Party
at such other address as such Party may designate by notice to the other Party.
14. Waiver; Invalidity of Particular Provision. The failure of a Party to exercise or enforce any of its
rights under this Lease shall not be a waiver of those rights and shall not affect any other right of that
Party under this Lease. In the event that any provision of this Lease shall be found to be void or
13
unenforceable, such findings shall not be construed to render any other provision of this Lease either
void or unenforceable and all other provisions shall remain in full force and effect unless the
provisions which are invalid or unenforceable shall substantially affect the rights or obligations
granted to or undertaken by either Party.
15. Construction; Section Headings. Each term and each provision of this Lease to be performed by the
Parties shall be construed to be both a covenant and a condition. The paragraph headings throughout
this Lease are used for convenience only, and shall not be held to explain, modify, amplify or
otherwise aid in the interpretation, construction or meaning of this Lease.
16. No Merger of Title. There shall be no merger of this Lease nor of the leasehold estate created by this
Lease with the fee estate in or ownership of any of the Parking Ramp by reason of the fact that the
same person or entity may acquire, hold or own, directly or indirectly, (a) the leasehold estate created
by this Lease or any part thereof or interest therein or any interest of the Lessee in this Lease, and (b)
the fee estate or ownership of any of the Parking Ramp or any interest in such fee estate or ownership;
and no such merger shall occur unless and until all persons or entities having any interest in (i) this
Lease as the Lessee or the leasehold estate created by this Lease, and (ii) this Lease as the Lessor or
the fee estate in or ownership of the Parking Ramp or any part thereof sought to be merged shall join
in a written instrument effecting such merger and shall duly record the same.
17. Surrender. The Lessee shall (a) on the last day of the term hereof, (b) upon any earlier termination
permitted under this Lease, and (c) upon any permitted entry or re-entry by the Lessor upon the
Leased Stalls, peaceably leave and surrender the Leased Stalls into the possession and use of the
Lessor without fraud or delay in good order, condition and repair without violations, reasonable wear
and tear and casualty excepted.
18. Subordination of Lease. This Lease and the term and estate granted herein are and shall be subject
and subordinate to the lien of all institutional mortgages which may now or at any time hereafter
affect all or any portion of the Lessor's interest in the Leased Stalls, and to all renewals,
modifications, consolidations, replacements and extensions thereof.
19. Effective Law. This Lease shall be governed by, construed and enforced in accordance with the laws
of the State of Minnesota. Lessor and Lessee waive their right to trial by jury in any action,
proceeding or counterclaim brought by either of the parties against the other, or with respect to any
issue or defense raised therein, on any matters whatsoever arising out of or in any way connected with
this Lease.
20. Entire Agreement. This Lease contains the entire agreement between the parties. No representative,
agent or employee of Lessor has been authorized to make any representations, warranties or promises
with respect to the letting, or to vary, alter or modify the provisions of this Lease. No additions,
changes, modifications, renewals or extensions of this Lease, shall be binding unless reduced to
writing and signed by both parties.
14
21. Counterparts. This Lease may be executed in one or more counterparts, each of which shall be an
original, and all of which constitutes one and the same Lease. [electronic signature as well]
22. Miscellaneous. Lessor and Lessee agree that all documentation and knowledge of this transaction
shall remain confidential. Both parties agree that information of this transaction will not be released
to any individual or entity without the prior written consent of the other party, except to a party's
affiliates, attorneys, accountants, or advisors that reasonably ensure the confidentiality thereof, or as
necessary to comply with any law, regulation, valid court order or requirement/audit of or by a
governmental authority, or to enforce the rights of either party under this Lease. Neither party shall
unreasonably withhold its consent.
Except as is hereinabove set forth, all terms, provisions and covenants of the Lease shall remain
unchanged and in full force and effect.
IN WITNESS WHEREOF, the parties hereto have duly executed this Parking Stall Lease Agreement as
of the day and year first above written.
LESSOR:
CITY OF COLUMBIA HEIGHTS
By:________________________________
Its:________________________________
Date: _________________
LESSEE:
FAIRVIEW HEALTH SERVICES
By: _______________________________
Its: _______________________________
Date: ________________
15
PARKING STRUCTURE CONDITION
ASSESSMENT REVIEW
CITY OF COLUMBIA HEIGHTS
PREPARED FOR:
KEVIN HANSEN, P.E.
COLUMBIA HEIGHTS, MINNESOTA 55421
PREPARED BY:
KIMLEY-HORN AND ASSOCIATES, INC.
2550 UNIVERSITY AVE W.
SUITE 238N
SAINT PAUL, MINNESOTA 55114
September 13, 2018
16
September 13, 2018
Kevin Hansen, P.E.
Public Works Director / City Engineer
City of Columbia Heights
637 38th Avenue NE
Columbia Heights, MN 55421
Re: Columbia Heights
Parking Ramp Condition Assessments
Project No. 160558004
Dear Mr. Hansen,
Kimley-Horn would like to thank you for the opportunity to provide a parking ramp condition assessment
report for the two City-owned parking ramps, Gould Avenue and Fairview Ramps. At your request, we
conducted a condition assessment of each parking ramp to review the general conditions, understand the
extent of the current deterioration, and determine the repair work necessary to bring the two parking ramps
from their existing conditions to good condition. The following report discusses the findings of our
investigation.
If you have any questions, please call Jerry Pertzsch at (651) 643-0411 or Eric Tadt (651) 643-0461.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
Jerry D. Pertzsch, P.E. Eric Tadt, P.E., S.E.
Vice President
I hereby certify that this plan, specification, or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
_________________________________________
Jerry D. Pertzsch, P.E.
Date: September 13, 2018 Reg. No. 17383
17
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 2
CONTENTS
Introduction ................................................................................................................................. 3
Ramp Information ............................................................................................................................. 3
Maintenance background ................................................................................................................. 4
Observations – Gould Avenue Ramp .......................................................................................... 4
Slab Cracking ................................................................................................................................... 4
Efflorescence ................................................................................................................................... 4
Exposed Reinforcing ........................................................................................................................ 5
Concrete Spalling ............................................................................................................................. 5
Traffic Membrane ............................................................................................................................. 5
Expansion Joints .............................................................................................................................. 5
Skyway ............................................................................................................................................. 5
Chloride Ion Testing ......................................................................................................................... 5
Drainage System .............................................................................................................................. 6
Electrical ........................................................................................................................................... 6
Miscellaneous .................................................................................................................................. 6
Observations – Fairview Ramp ................................................................................................... 6
Slab Cracking ................................................................................................................................... 7
Efflorescence ................................................................................................................................... 7
Exposed Reinforcing ........................................................................................................................ 7
Concrete Spalling ............................................................................................................................. 7
Traffic Membrane ............................................................................................................................. 8
Caulk Joints ...................................................................................................................................... 8
Stair Towers ..................................................................................................................................... 8
Chloride Ion Testing ......................................................................................................................... 8
Drainage System .............................................................................................................................. 8
Electrical ........................................................................................................................................... 8
Miscellaneous .................................................................................................................................. 9
Recommendations ...................................................................................................................... 9
Gould Avenue Ramp ........................................................................................................................ 9
Fairview Ramp ............................................................................................................................... 10
Maintenance Program ............................................................................................................... 11
Engineer’s Opinion .................................................................................................................... 14
Appendix A ............................................................................................................................... 15
Cain Thomas Associates, Inc. Electrical Systems Assessment Memorandum ............................. 15
Appendix B ............................................................................................................................... 18
Site Photographs – Gould Avenue Ramp ...................................................................................... 18
Appendix C ............................................................................................................................... 23
Inspection Notes – Gould Avenue Ramp ....................................................................................... 23
Appendix D ............................................................................................................................... 47
Site Photographs – Fairview Ramp ............................................................................................... 47
Appendix E ............................................................................................................................... 52
Inspection Notes – Fairview Ramp ................................................................................................ 52
Appendix F ................................................................................................................................ 76
Chloride Ion Test Reports .............................................................................................................. 76
18
3 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
INTRODUCTION
Kimley-Horn was retained by the City of Columbia Heights (City) to perform a condition assessment on two
parking ramps in Columbia Heights, MN. The City owns and has maintenance agreements with adjacent
businesses for two multi-level, cast-in-place concrete parking ramps built in the early 1980’s, Gould Avenue
Ramp and Fairview Ramp. The two parking ramps are similar in layout and construction. The City requires
a review and analysis of the ramps to understand the current condition and the cost to bring the two parking
ramps from their existing conditions to good or excellent condition. Specifically, the Gould Avenue Ramp,
which is under-utilized today and adjacent to a potential redevelopment parcel. The evaluation and analysis
presented in this report is imperative for the City and local partners to understand the conditions of both
parking ramps.
Kimley-Horn performed a condition assessment of the two parking ramps, which included a visual review
of the current conditions, to understand the general condition of each ramp level. The review of the general
condition of the parking ramps included, but was not limited to: areas of deteriorated concrete, condition of
waterproofing membrane systems, condition of expansion joints and joint sealants, the exterior conditions
of the ramps, and electrical systems. In addition to visual observations, chloride ion samples were collected
and tested from three locations in each structure by American Engineering Testing. Kimley-Horn identified
and documented well-preforming and deficient items, including typical structural systems, structural
deficiencies, and the condition of existing lighting systems.
Kimley-Horn analyzed the field data relative to short-term repair needs, including any immediate repair
efforts, and more long-term repair and maintenance needs. Using this information, Kimley-Horn developed
a report summarizing the evaluation of each ramp including repair recommendations, complete with a five-
year maintenance program for repair and maintenance efforts in each year for 2019 thru 2023 with opinions
of probable costs.
As a sub-consultant to Kimley-Horn, Cain Thomas Associates performed the visual assessment of the
electrical systems of the two parking ramps. Cain Thomas reviewed the basic electrical distribution systems
and equipment connections, and developed a report summarizing their findings located in Appendix A.
RAMP INFORMATION
The Gould Avenue Ramp is located between 40th Avenue NE and Gould Avenue NE adjacent to Central
Avenue NE. The ramp is rectangular with two U shaped plates sloping away from the center of the ramp
with dimensions of the entire ramp of 116-feet by 263-feet. The ramp consists of three supported levels
and one cast-in-place concrete slab on grade level with a floor area of approximately 30,000 square feet
per level. The supported levels are cast-in-place post-tensioned concrete one-way beams and slabs
supported by cast-in-place concrete columns. A maintenance garage is located below a portion of the
lowest level of the west bay. There are three stair towers within the ramp, each located on the west side
with one in the north and south corners and a third in the center. The stair tower located on the center of
the west side has an elevator to access each floor. There is a skyway connection between the third level
of the parking ramp to a plaza for the adjacent, vacant Northeast Bank building. The three stair towers and
skyway are currently closed to pedestrian access. Kimley-Horn was not able to access the towers nor the
skyway to perform a condition assessment. Additionally, the top two levels of this ramp are closed to vehicle
access. See copies of the plans obtained from the City in Appendix C for layout and dimensions.
The Fairview Ramp is located along Van Buren Street NE between 41st Avenue NE and 40th Avenue NE.
The ramp is rectangular with two opposite sloping bays from ground level to Level 3, and consists of three
supported levels and one cast-in-place concrete slab on grade level with a floor area of approximately
30,000 square feet per level. There are two stair towers within the ramp, each located on the east side with
one in the north and south corners. The stair tower located on the southeast corner has an elevator to
access each floor. The primary users of this ramp are Fairview Columbia Park clinic patrons and customers
of the businesses along Central Avenue to the east of this ramp. Based on observations and comments
from City staff, the design of the Fairview Ramp is similar to the Gould Ramp. Existing plan documents of
this ramp were not available at the time this report was written. See the plan view in Appendix E for general
19
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 4
layout of the ramp.
MAINTENANCE BACKGROUND
Previous maintenance records were not provided to Kimley-Horn for either ramp. However, during Kimley-
Horn’s condition assessment, we documented several previous repairs in the Fairview Ramp. These
previous repairs included a significant area of traffic coating membrane on one of the sloping bays, concrete
spall repairs throughout the ramp, and relatively new caulk joints along the façade.
The structural and lighting condition assessment of the Gould Avenue and Fairview Ramps were performed
on July 24, 2018. Chain dragging of representative deck areas was performed as part of the condition
assessment. The electrical condition assessment and chloride ion sampling were performed on August 7,
2018.
OBSERVATIONS – GOULD AVENUE RAMP
Visual observations of the parking ramps were performed by Kimley-Horn staff on July 24, 2018. Selected
photographs from the assessment are included in Appendix B. Notes of the visual observations are
recorded on the respective ramps plan sheets included in Appendix C. The following observations were
made during the review:
SLAB CRACKING
During the site inspection, several cracks were observed at the slabs-on-grade. The cracks noted in the
site inspection range in length from 20 to 60 lineal feet. This is most likely caused by the age of the ramp,
freezing and thawing weather conditions, and the settlement of the soil. We noted minimal differential
heights on either side of the cracks in the slab-on-grade.
There is a slab-on-grade crack at the joint between the ramp and the roadway asphalt on the south side of
Level 2 near Gould Avenue NE. The City noted that during heavy rainfalls, this location of the ramp becomes
flooded. Below this joint, there is a concrete wall where water stains have formed. Concrete spalls were
documented on the ceiling which are due to water penetration through the crack. The curb inlet at this joint
was observed to be sloping toward this entrance on Gould Avenue NE,
which may be a contributing factor to the first level is flooding. A photo of
flooding from a recent storm event is to the right.
There were minimal concrete slab cracks noted on the upper levels. Most
of the slab cracks occurred around the spalls; see the spall observation
section for more information.
EFFLORESCENCE
Efflorescence was not observed during the site inspection of the structure. There is potential for
efflorescence to form due to the moisture from the melted snow and ice which forms a saline solution that
can penetrate cracks in the slab. As moisture comes through the cracks, it carries salts with it and forms
efflorescence.
20
5 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
EXPOSED REINFORCING
Numerous locations were identified showing exposed reinforcing on the slab and ceiling at all levels of the
parking ramp. At these locations, the epoxy coating on the rebar was failing with significant exposed rusting.
Chain dragging around two of the most significant floor spall locations indicated the concrete around these
two locations is sound.
Kimley-Horn also noted exposed post-tensioning tendons on Levels 3 and 4 in several locations. The
sheathing around the tendons appeared to be in sound condition at all but one location. The exposed post-
tensioning tendon and sheathing on Level 4 appeared to be significantly degraded; however, this currently
is not causing distress to the structure.
CONCRETE SPALLING
During Kimley-Horn’s site inspection, there were numerous floor, ceiling, wall, and column spalls noted on
all levels of the parking ramp. Exposed reinforcing bars and post-tensioning tendons exist at most of spall
locations. These spalls may be caused from the original construction not providing adequate cover over the
reinforcement, weather conditions, or water penetration through cracks in the slab.
Façade spalling was noted on the west side near the north stair tower. This is not a structural issue but
should continue to be monitored.
TRAFFIC MEMBRANE
There is no traffic membrane applied in the Gould Avenue Ramp.
EXPANSION JOINTS
Expansion joints were only observed around the stair openings at each elevated level. The Level 3 expansion
joints at the stair openings were ripped along the length of the joint. The joints are likely failing due to UV
exposure and age. The typical life span of expansion joints is approximately 10 years. Kimley-Horn is not
aware of the age of the joints. Below the expansion joints, water stains and spalling concrete was observed.
SKYWAY
The skyway connecting the parking ramp to the vacant Northeast Bank building is closed to the public. The
inspection of the skyway was a visual inspection from below the skyway at grade. There is a significant
amount of rust on the structural steel beams, metal deck, connections, and bearings, with notable amounts
of peeling paint. We recorded significant corrosion of the steel decking supporting the concrete slab.
Exposed and corroded reinforcement was visible through the steel decking.
It was also noted the drainage pipe on the north side of the skyway was missing a pipe section.
CHLORIDE ION TESTING
American Engineering Testing (AET) performed chloride ion testing at 3 locations of the parking ramp.
These locations were selected based on where ramps typically have high chloride ion concentrations, such
as the drive lanes. The results from AET show elevated levels of chloride ions in the ramp with a maximum
concentration of approximately 2700 ppm in the top 1” of concrete in drive lanes on Levels 2 and 3.
21
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 6
The typical threshold for corrosion is a concentration of 300-400 ppm of chloride ions. This is of concern as
these chloride ions will continue to propagate deeper into the slab structure, corroding the reinforcement.
A maximum concentration of 270 ppm was noted at a depth of 2”. This is within the concentration threshold
and significant corrosion of the reinforcement is unlikely.
See Appendix F for the full chloride ion test report.
DRAINAGE SYSTEM
Floor drains throughout the structure were generally clogged and covered with debris on each level.
Cracked pipes were common on all levels. See Figure 2 in Appendix B for an example of a typical rusted
and broken pipe. In addition to the piping deterioration, the manhole next to the north stair tower has a
severely rusted cover which could be a safety hazard if someone steps on it.
ELECTRICAL
Lighting in the ramp is in poor condition. The current lighting is florescent 4’-0” fixtures with one or two
lights per bay. The florescent lighting was observed to not be function in many locations. On the south
side of Level 1, an area was noted to be darker than a majority of the ramp. In addition to many florescent
lights not working, exit lights and entrance/exit signage were either turned off or not working.
Cain Thomas provided an electrical review of the structure; see Appendix A for a discussion of the electrical
assessment.
MISCELLANEOUS
The existing ADA signage is either faded or nonexistent. We observed the existing accessible parking
stalls likely do not meet the Americans with Disabilities Act (ADA) Standards for Accessible Design (2014).
Per the ADA Standards for Accessible Design, the maximum slope of an accessible parking space and
accessible routes cannot exceed a slope of 1:48, or 2.0%. The cross slope of the parking stall is greater
than 2%.
There is no wayfinding signage for the public to find this ramp.
It was observed at the Level 3 stair tower there was a broken door glass and on Level 2 a broken lock.
There are several locations around the perimeter of the ramp where the chain link fence is bowing or
damaged.
The parking stall striping on each floor plate is worn.
OBSERVATIONS – FAIRVIEW RAMP
Visual observations of the parking ramps were performed by Kimley-Horn staff on July 24, 2018. Selected
photographs from the inspection are included in Appendix D. Notes of the visual observations are recorded
on the respective plan views developed for this observation included in Appendix E. The following
observations were made during the review:
22
7 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
SLAB CRACKING
During the site inspection, several cracks were observed at the slabs-on-grade. The cracks noted in the
site inspection range in length from 20 to 40 lineal feet. This is most likely caused by the age of the ramp,
freezing and thawing weather conditions, and the settlement of the soil.
Minor concrete slab cracks were noted on the upper levels, including adjacent to previous repairs.
EFFLORESCENCE
Efflorescence was observed during the site inspection on the underside of the floor plates. Efflorescence
forms due to the moisture from the melted snow and ice that forms a saline solution and penetrates through
the cracks in the slab. As moisture comes through the cracks, it carries salts with it and forms efflorescence
on the underside of the slab. The efflorescence that was observed during the inspection was found on the
underside of the slab on Levels 1 and 2 of the ramp.
EXPOSED REINFORCING
Minimal exposed reinforcing in the slab and ceilings were observed. At these locations, the rebar appeared
to be sound.
Kimley-Horn also noted exposed post-tensioning cables on Level 1 of the ramp. The sheathing around the
cable is intact and does not appear to be placing distress on the ramp.
CONCRETE SPALLING
During Kimley-Horn’s site inspection, there were numerous floor, ceiling, wall, and column spalls noted on
all levels of the parking ramp. While reinforcing bars were not exposed at most locations, these spalls may
be caused from the original construction not providing adequate cover over the reinforcement, weather
conditions, or water penetration through cracks in the slab.
Select locations around spalls were chain dragged to evaluate the extent of unsound concrete. These
locations were visually chosen by the large quantity of floor spalls in a small location. On Level 1 of the
parking ramp, Kimley-Horn noted a location with seven spalls in close proximity with 14 SF of spalls
measured by visual observation. After the chain dragging test was performed, Kimley-Horn documented
the total square footage of the spalls as 20 SF as we found additional concrete delamination around the
spalls.
At slab-on-grade level of the parking ramp, there is a concrete wall that has visible water leakage along the
top joint causing numerous spalls along the wall length. This is due to a joint failure from the level above
that is allowing water to pass through.
On Levels 1 and 2, cracking and spalling at the columns around the barrier cables were noted at select
locations. This cracking around the barrier cables could be caused by an internal reinforcement condition
with inadequate cover provided.
On Level 3 of the ramp, it appeared there were previous spall repairs on the façade panels along the
perimeter of the building.
23
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 8
TRAFFIC MEMBRANE
Traffic membrane was observed on one of the sloped parking ramps. This is a previous maintenance repair,
but this membrane was observed to have a spalls and cracks, likely due to traffic wearing and delaminated
concrete below the membrane. See the attached inspection observations for locations of these cracks and
spalls.
CAULK JOINTS
Several caulk joints were observed to be pulling away from the concrete slab as well as having tears in a few
locations. This condition occurs around the perimeter of Level 3 and at the base of the stairs (typical at all
levels). Also, there was no caulk joint observed at Level 3 between the curb and the floor slab.
See the stair tower section below for additional joint information around the stairs.
STAIR TOWERS
At both stair towers, the door frames, stair floor plates, and angles at each level have significant rusting.
There is an existing caulk joint at the base of each door. This is not an adequate joint in these locations as
the ramp and stairwells are two separate structures that move independently. There are larger movements
between these two structures than a caulk joint can withstand. The caulk joints around the stairs are ripped,
allowing water to leak through which is rusting the stair elements below. The railings inside the stairwells
are rusted as well.
CHLORIDE ION TESTING
American Engineering Testing (AET) performed chloride ion testing at 3 locations of the parking ramp.
These locations were selected based on where ramps typically have high chloride ion concentrations, such
as the drive lanes. The results from AET show significantly elevated levels of chloride ions in the ramp with
a concentration of approximately 5,100 ppm in the top 1” of concrete in two drive lanes on Level 3. The
typical threshold for corrosion is a concentration of 300-400 ppm of chloride ions. This is of concern as
these chloride ions will continue to propagate deeper into the slab structure, corroding the reinforcement.
The next 1-2” of concrete chloride ion concentrations was measured at up to 2,700 ppm. These results are
of concern because this is the approximate location of the first layer of reinforcement. With concentrations
this high, reinforcing bars with compromised epoxy coatings may begin corroding.
DRAINAGE SYSTEM
The floor drains appeared to generally be clean and maintained. Debris was observed to be partially
plugging one drain. It was also observed the drain sizes installed on the floor plates appeared smaller in
diameter than typically found in parking ramps.
ELECTRICAL
Lighting in the ramp is in fair condition, but appears to be in need of upgrading. The current lighting is a
florescent circular fixture about 1’-0” in diameter at a 1:1 ratio (one light per one bay). The lighting was
observed to be functional in most locations. It was noted that many exit lights and entrance/exit signage
were either turned off or not working.
On Level 3, the light poles appear to be in good condition but likely do not provide adequate light coverage
to the top level of the ramp.
24
9 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
Cain Thomas provided an electrical review of the structure, see Appendix A for a discussion of the electrical
assessment.
MISCELLANEOUS
ADA and interior signage were faded or nonexistent on the floor plates.
There are railings on slab-on-grade near the entrance to the ramp and at stair towers that were documented
to be very rusted. Also, concrete was noted to be spalling around some of the railing posts.
The façade on Level 3 has longitudinal cracking along the bottom of panels at several locations. There
could be minimal reinforcement in the bottom portion of the façade sections. Without adequate
reinforcement, the self-weight of the façade panels may be the of the cause horizontal cracking. At this
time, these cracks are not a structural concern.
In the southwest corner of Level 3 and along the exterior east side of the Level 1, we documented cracked
grout between the façade panels and top of the foundation walls.
At the exterior east side of the Level 1, near the northeast stairwell, loose electrical wires or cables were
observed to be attached to the façade of the ramp. No damage to the wires was noted.
Along the north side of the ramp, we observed an exterior fence post that appears to be cut, including
chipping paint and concrete spalling along the fence. The fence along the east side of the ramp was
observed to be rusting. The fence on the west side of the ramp had a missing picket in the fence.
RECOMMENDATIONS
GOULD AVENUE RAMP
The Gould Avenue ramp requires significant repairs to improve the user-friendliness of the parking ramp.
Initially, Kimley-Horn recommends a thorough cleaning of the ramp, including a wash down of the deck and
removal of graffiti in the stair towers. We recommend replacing the existing fluorescent lighting with motion
sensing LED lights. Several areas as noted above require additional luminaires be installed to eliminate
darker spots. We recommend that all lighting repairs occur in 2019 to improve the accessibility of the
parking ramp.
To further improve the user-friendliness of the parking ramp, we recommend replacing all interior signage,
including signs that light-up, and re-striping the ramp. Also, the ramp has evidence of significant water
intrusion at the south end along Gould Avenue noted by the collection of sand at the approach apron and
due to corrosion of exterior metallic conduit. We recommend the installation of a catch basin in the gutter
line of Gould Avenue, east of the entrance to the ramp, to capture water in the gutter line prior to reaching
the ramp entrance. Furthermore, the water intrusion has caused the approach apron to settle and requires
replacement. This work should be completed in 2019.
We recommend performing concrete slab repairs over the five-year maintenance program, beginning with
the areas with greatest degradation and any safety hazards such as tripping at uneven concrete surfaces.
Additionally, we recommend that exposed reinforcing steel and post-tensioning cables on the driving
surface and ceiling be repaired and continue to be evaluated for further deterioration. The repairs should
involve proper surface preparation, reinforcing steel coating or post-tensioning cable sheathing, concrete
repair material and material placement as outlined by the American Concrete Institute. To eliminate future
efflorescence formation, we would suggest proper sealant of overhead cracks and spalls in the concrete.
25
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 10
We would also recommend applying a water repellant to the floor plates to prevent an increase of chlorides
in the concrete driving surface. The water repellent will reduce moisture and chloride infiltration and prolong
service life.
American Engineering Testing provided an initial baseline test for chloride ion concentrations, but we would
recommend another test be performed in the next 1 to 3 years to see the change in the concentrations and
provide a solution if an increase is observed.
At the stair towers, we recommend repairing the expansion joints around the towers as it will limit the water
leaking to the below levels to limit future spalling and rusting in these locations.
We recommend replacing the cracked cast-iron drain bodies and associated plumbing stacks within the
first years of the maintenance program.
The skyway connection to the Northeast Bank plaza is recommended to be repaired prior to reopening of
the plaza or other development, or demolished. The skyway is experiencing significant corrosion of the
steel decking supporting the concrete slab and the exterior beams with reinforcement of the slab exposed
and corroded. We recommend the skyway remain closed until the rehabilitation or replacement of the
concrete slab is complete. We recommend a closer inspection of the exterior beams, connections, and
bearings be performed before they are sand blasted and painted. It was noted in the observations section
of a missing drainage pipe on the north side of the skyway, this should be replaced for proper drainage.
We recommend replacing and expanding the emergency and egress lighting system power immediately,
along with updating the lighting controls and facility electrical heat equipment. For more detail on these
recommendations, see Appendix A.
FAIRVIEW RAMP
The Fairview Ramp has noticeable previous repair efforts throughout the ramp. This ramp requires general
maintenance, but is in generally fair to good condition. Kimley-Horn recommends replacing the existing
fluorescent lighting with motion sensing LED lights, including adding luminaires to eliminate darker spots.
We recommend that all lighting repairs occur in 2020 to occur after the improvements at the Gould Avenue
Ramp.
We recommend performing concrete slab repairs over the five-year maintenance program, beginning with
the areas with greatest degradation and any safety hazards such as tripping at uneven concrete surfaces.
Additionally, we recommend that exposed reinforcing steel and post-tensioning cables on the driving
surface and ceiling be repaired to eliminate further spalling and potential damage to the tendons. The
repairs should involve proper surface preparation, reinforcing steel coating or post-tensioning cable
sheathing material, concrete repair material, and material placement as outlined by the American Concrete
Institute.
We recommend the installation of a water repellant to the floor plates to prevent an increase of chlorides in
the concrete driving surface. The water repellent will reduce moisture and chloride infiltration and prolong
service life.
We recommend installing a traffic membrane, such as a skid-resistant broadcast aggregate overlay,
installed over two areas of significant concrete slab spalling and delaminations. All cracks should be routed
and sealed and all concrete spalls and delaminations repaired prior to the installation of the overlay. We
recommend the coating to occur in the first year of the maintenance program, and is installed by a contractor
certified by the manufacturer to perform these repairs.
26
11 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
We recommend performing a complete repair and painting of the two stair towers, including cleaning the
steel stair pans, repairing concrete cracks and spalls, repairing the steel floor plates at each doorway,
painting the interior steel stair stringers, handrails, and floor plates, and replacing the expansion joints in
front of each door.
We recommend monitoring the drain performance during heavy rain events. As noted in the observations,
the drains appear to be smaller in size that typical for a parking ramp. If drains, particularly on the top level
do not adequately handle the water, consideration should be given to installing larger drains.
We recommend installing emergency and egress lighting system power immediately and updating the
lighting controls within five years to keep the ramp operating to accepted standards. For more detail on
these recommendations, see Appendix A.
MAINTENANCE PROGRAM
A five-year maintenance program is outlined for each parking ramp on the following pages. These
programs will focus on an area by area basis in the most utilized areas of the ramps. The Gould Avenue
Ramp program emphasizes the immediately improvement of the user-friendliness and accessibility of the
ramp. The Fairview Ramp program identifies areas of the greatest need of repairs.
Efforts will incorporate supplemental protection measures to slow future deterioration. The main structural
and safety issues have been given the highest priority and are recommended to be repaired in 2019 and
2020. The waterproofing and durability efforts have been prioritized and listed in their perceived order of
importance. The recommended repairs and maintenance work listed below were prioritized to slow future
deterioration and to begin a regular maintenance schedule.
27
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 12
Gould Avenue Parking Ramp
Proposed Maintenance Program
Year Effort Estimates(1)
2019 (a) Concrete slab and joint repairs $21,000
(b) Clean ramp and drains $10,500
(c) Add inlet on Gould Avenue and replace concrete apron $21,000
(d) Replace central battery/inverter system $62,000
(e) Replace electrical heating equipment $26,000
(f) Re-stripe ramp $5,500
(g) Replace interior signage (including electrical) $10,500
2019 Sub-total $156,500
2020 (a) Concrete slab and joint repairs $21,500
(b) Slab on grade repairs $80,500
(c) Replace overhead lights $160,500
2020 Sub-total $262,500
2021 (a) Concrete slab and joint repairs $22,000
(b) Waterproofing membrane $11,000
(c) Replace expansion joints at stairwells $33,000
(d) Penetrating water repellent (Levels 2 & 3) $66,500
2021 Sub-total $132,500
2022 (a) Concrete slab and joint repairs $11,500
(b) Drain bodies and stack replacement $63,000
(c) Upgrade lighting controls $40,000
(d) Replace caulk at construction joints $6,000
2022 Sub-total $120,500
2023 (a) Concrete slab and joint repairs $18,000
(d) Penetrating water repellent (Level 4) $41,500
(c) Façade repairs (fence and caulk joints) $18,000
(d) Pedestrian bridge repair $35,500
2023 Sub-total $113,000
Note:
(1) Probable costs do not include a mobilization, contingency, or professional fees. Cost
estimates based on 2018 prices.
(2) Probably costs include 3.5% inflation increase per year.
28
13 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
Fairview Parking Ramp
Proposed Maintenance Program
Year Effort Estimates(1)
2019 (a) Concrete slab and joint repairs $21,000
(b) Waterproofing membrane $47,000
(c) Slab on grade repairs $21,000
(d) Replace expansion joints at stair towers $5,500
(e) Add battery back-up $36,500
(f) Re-stripe ramp $5,500
(g) Replace ramp and stair signage (including electrical) $16,000
2019 Sub-total $152,500
2020 (a) Concrete slab and joint repairs $11,000
(b) Replace overhead lights $160,500
(c) Stair tower structural repairs $32,500
2020 Sub-total $204,000
2021 (a) Concrete slab and joint repairs $11,500
(c) Penetrating water repellent $83,000
(d) Interior tube steel railing repairs $11,500
(e) Stair tower steel painting $28,000
2021 Sub-total $134,000
2022 (a) Concrete slab and joint repairs $12,000
(b) Drain bodies and stack replacement $63,000
(b) Replace top level cove caulk joint $6,000
(c) Exterior fence repairs $6,000
2022 Sub-total $87,000
2023 (a) Concrete slab and joint repairs $18,000
(b) Replace caulk at construction joints $6,500
(d) Upgrade lighting controls $23,500
2023 Sub-total $48,000
Note:
(1) Probable costs do not include a mobilization, contingency, or professional fees. Cost
estimates based on 2018 prices.
(2) Probably costs include 3.5% inflation increase per year.
29
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 14
ENGINEER’S OPINION
The Gould Avenue Ramp has been in service for approximately 40 years, and is in fair condition. The parking
ramp requires regular cleaning and significant maintenance to extend its service life.
The Fairview Ramp has been in service for approximately 40 years, and is in good condition. The parking
ramp requires regular cleaning and annual maintenance to extend its service life.
Based on our observations, it is our opinion that the Gould Avenue and Fairview parking ramps can safely
support the imposed loads as specified in the Minnesota State Building Code.
It should be noted that Kimley-Horn has not performed a structural review to verify the structural adequacy of
the original design, as this was not within the scope of the review work. During our inspection, we observed
no deterioration to be indicative of inadequate structural design or construction procedures.
30
15 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
APPENDIX A
CAIN THOMAS ASSOCIATES, INC. ELECTRICAL SYSTEMS ASSESSMENT
MEMORANDUM
31
4215 WHITE BEAR PARKWAY - SUITE 100
SAINT PAUL, MINNESOTA 55110 Phone: 651-426-9549 || Fax: 651-426-5048
www.CTAMEP.com
Cain Thomas Associates, Inc.
Mechanical || Electrical || Plumbing || Commissioning || Fire Protection || Energy Modeling
MEMORANDUM
DATE: August 8, 2018
TO: Eric Tadt, P.E., S.E.
Kimley-Horn]
St. Paul, MN
FROM: Jay J. Cain, P.E. Principal Electrical Engineer
PROJECT: City Parking Ramps
Columbia Heights, MN
PROJECT NUMBER: 2018-168
SUBJECT: Electrical Systems Assessment
As requested, on August 7, 2018 we conducted a visual observation of the electrical systems at the two city parking ramps
in the vicinity of 40th Street and Central Avenue. The first was referred to as the Gould Ramp and was located east of the
intersection and the second the Fairview Ramp located west of the intersection.
Both ramps are multilevel concrete structures constructed in the early 80’s. Mike O’Reilly, City Street and Park
Superintendent, provided access and led the visual observation. Tom, the Fairview Hospital Maintenance Supervisor, also
participated at the Fairview Ramp.
Our task was to assess the basic electrical distribution systems and equipment connections. Signage, lighting, traffic
management and security will be dealt with by others.
Our observations are as follows:
Gould Ramp
General: This facility would appear to have been poorly maintained in recent years, most likely due to reduced use. There
was significant vandalism, that, while not directly impacting the electrical systems, is an indication of the condition of the building
electrical systems.
Basic Wiring Systems: Understanding is that some of the lighting systems are no longer operational due to what is believed
to be wiring issues, This could not be verified.
Electrical Service: Building contained a 200 ampere, 480 volt three phase, four wire electrical service with utility metering
located in the lower level electrical room. This was served from a pad mounted utility transformer to the east of the facility. This
service is adequate for the facility and continued use is a reasonable expectation.
However, some aspects of the electrical distribution system are suspect, especially on the lower levels, due to significant
water damage from flooding etc. Exterior of metallic conduit is rusted and, most likely looked to be in worse condition than they
actually may be. However, some additional investigation may be in order to assure proper raceway grounding systems are still
in place and conductors are properly enclosed. This was especially true of connections to and the various pieces of electric
heat.
Emergency Lighting Battery System: The main electrical room contained a central battery inverter emergency power supply
system for emergency lighting. While not tested, this system appeared to no longer be operational. As such, the ramp is most
32
Electrical Systems Assessment August 8, 2018
City Parking Ramps – Columbia Heights, MN Page 2 of 2
Cain Thomas Associates, Inc.
Mechanical || Electrical || Plumbing || Commissioning || Fire Protection || Energy Modeling
likely without emergency egress and exit lighting system power during a power outage. In addition, emergency and egress
lighting systems need to be expanded for greater coverage of the egress path within the ramp.
Lighting Controls: Building contained a central relay photo time lighting control system. System appeared to still be in
working order but is not up to current standards. In the interest of safety and energy conservation, systems should be converted
to a more sophisticated system sensing occupancy and day lighting conditions and operating the lighting accordingly.
Electric Heat; Various portions of this facility contain electric heat such as elevator lobbies, stairs, equipment rooms etc.
Most of this heat would appear to be in poor operating condition.
Fairview Ramp
General: This facility would appear to have been relatively well maintained in recent years, most likely due to significant
use. While this does not directly impact the electrical systems, it is an indication of the condition of the building electrical systems.
Electrical Service: Building contained a 400 ampere 208 volt three phase, four wire electrical service with utility metering
located in the main level electrical room. This was served from a pad mounted utility transformer to the east of the facility. This
service is adequate for the facility and continued use is a reasonable expectation.
Emergency Lighting Battery Systems: The facility did not appear to contain battery back up on the emergency egress and
exit lighting systems. As such, the ramp is most likely without emergency egress and exit lighting during a power outage. In
addition, emergency and egress lighting needs to be expanded for greater coverage of the egress path within the ramp.
Lighting Controls: Building contained a central relay photo time lighting control system. System appeared to still be in
working order but is not up to current standards. In the interest of safety and energy conservation, systems should be converted
to a more sophisticated system sensing occupancy and day lighting conditions and operating the lighting accordingly.
Recommendations:
Emergency lighting upgrades are a high priority for both ramps.
The Gould ramp central battery/inverter system needs to be replaced (Possibly repaired) and coverage expanded. This is
an immediate need and costs are expected to be in the area of $60,000.00.
Battery backup emergency egress and exit lighting systems need to be added and expanded in the Fairview ramp. This is
an immediate need and costs are expected to be in the area of $35,000.00.
Lighting controls need to be upgraded in both facilities to enhance safety and improve energy conservation. This would
presumedly be in conjunction with a lighting fixture upgrade. Independent of a lighting fixture upgrade, a lighting control upgrade
would cost in the area of $35,000.00 for Gould and $20,000.00 for Fairview. As this is not a life safety issue, this cn be deferred
indefinitely, however, this should be done within a five years to keep the ramp operating to accepted standards.
The electrical heating equipment in the Gould ramp should be replaced and the integrity of the electrical connections
confirmed. We recommend this take place within the next year to assure reasonable operating conditions for the ramp and a
cost of $25,000 is expected.
Further investigation should be conducted as to water damage to the electrical distribution systems in the Gould Ramp. It
is expected that most damage is surface, however, it is recommended that the integrity of the electrical system be investigated
within the next two years to assure that to be the case. We recommend a budget of $15,000.00 for further investigation and
$45,000.00 for potential repairs.
End of Memorandum
Document1
33
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 18
APPENDIX B
SITE PHOTOGRAPHS – GOULD AVENUE RAMP
Figure 1. Gould Avenue Ramp: Typical Exposed Reinforcing and Spalling
Figure 2. Gould Avenue Ramp: Mechanical Piping
34
19 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
Figure 3. Gould Avenue Ramp: Typical Slab on Grade Cracking
Figure 4. Gould Avenue Ramp: Typical Interior Signage
35
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 20
Figure 5. Gould Avenue Ramp: Exposed Post-Tensioning
Figure 6. Gould Avenue Ramp: Typical Lighting
36
21 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
Figure 7. Gould Avenue Ramp: Typical Clogged Drain
Figure 8. Gould Avenue Ramp: Typical Ripped Expansion Joint at Stairs
37
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 22
Figure 9. Gould Avenue Ramp: Typical Skyway Connections
38
23 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
APPENDIX C
INSPECTION NOTES – GOULD AVENUE RAMP
39
40th and Central 07/24/2018
P Présent E Excusé A Absent C Convoqué à la prochaine réunion
INFORMATIONS SUR LE PROJET
Nom
Columbia Heights
Adresse
Type de construction
PARTICIPANTS
PERSONNES RELATIVES AU PROJET
Nom Contact Email Téléphone Présent
Owner
Owner's assistant
Page 1 / 19 Rapport du 08/15/201840
OBSERVATIONS
#Location WP Description To do by Solved
1 TCE 2a SOG control joints 21' apart
2 TCE MEP
3 TCE 2a SOG 90LF
4 TCE MEP
Clogged drain
5 TCE 4b 4SF
6 TCE MEP
PLAN LEVEL 1
1
2
3
4
5
6
Page 2 / 19 Rapport du 08/15/201841
#Location WP Description To do by Solved
7 TCE 4b 4SF
8 TCE 2a SOG 60LF
9 TCE 2a SOG 20LF
10 TCE ADA?
11 TCE 4b 2SF
12 TCE 4b 16SF
13 TCE 2a SOG 60LF
14 TCE Update lighting. LED. Motion sensors. Complaints to brighten up ramp. More
than 1-1 lighting?
PLAN LEVEL 1
7
8
9
10
11
12
Page 3 / 19 Rapport du 08/15/201842
#Location WP Description To do by Solved
15 TCE Wayfinding signage to the ramp
16 TCE No stairs were reviewed
17 TCE MEP
18 TCE MEP
19 TCE Old signage
20 TCE Signage
21 TCE 4b 2SF
22 TCE Restriping TYP.
PLAN LEVEL 1
17
18
19
20
21
22
Page 4 / 19 Rapport du 08/15/201843
#Location WP Description To do by Solved
23 TCE 4wall 2SF
24 TCE 4b 2SF
25 TCE MEP
26 TCE 4b 4SF
27 TCE 4b 4SF
28 TCE 4b 9SF
PLAN LEVEL 1
23
24
25
26
27
28
Page 5 / 19 Rapport du 08/15/201844
#Location WP Description To do by Solved
29 TCE 4b 2SF
30 TCE 2a SOG 60LF
31 TCE 2a SOG 60LF
32 TCE Grid 1-6 add additional lighting. Dark
33 TCE 2a SOG 60LF
34 TCE MEP
35 TCE 2a SOG 20LF
PLAN LEVEL 1
29
30
31
33
34
35
Page 6 / 19 Rapport du 08/15/201845
#Location WP Description To do by Solved
36 TCE Lighting
37 TCE Lighting
38 TCE 4b 4SF
39 TCE Caulking ext. wall typ at stairwells
40 TCE Windows at stairwells typ cleaning
41 TCE Facade
PLAN LEVEL 1
36
37
38
39
40
41
Page 7 / 19 Rapport du 08/15/201846
#Location WP Description To do by Solved
42 TCE Rusting / peeling paint
43 TCE Rusting metal deck.
44 TCE Reinforcing in deck?
45 TCE Rusting connections
46 TCE Rusted bearings
47 TCE Missing pipe
PLAN LEVEL 1
42
43
44
45
46
47
Page 8 / 19 Rapport du 08/15/201847
#Location WP Description To do by Solved
48 TCE Bowing fence
49 TCE Bowing fence
50 TCE Damaged fence
51 TCE Landscaping
#Location WP Description To do by Solved
1 TCE 4a 10SF - chain dragged over spall, concrete around sounds solid.
PLAN LEVEL 1
48
49
50
51
PLAN LEVEL 2
1
Page 9 / 19 Rapport du 08/15/201848
#Location WP Description To do by Solved
2 TCE Lighting - 4 off?
3 TCE 4c 2SF
4 TCE 4c 4SF
5 TCE Lighting off typ
6 TCE 4wall 15SF
7 TCE MEP
8 TCE Door lock broke
PLAN LEVEL 2
2
3
4
6
7
8
Page 10 / 19 Rapport du 08/15/201849
#Location WP Description To do by Solved
9 TCE MEP
10 TCE MEP
11 TCE 4b 2SF
12 TCE SOG repair
13 TCE Signage
14 TCE ADA?
PLAN LEVEL 2
9
10
11
12
13
14
Page 11 / 19 Rapport du 08/15/201850
#Location WP Description To do by Solved
15 TCE Curb inlet. Sloping to entrance. Flooding on first floor
16 TCE MEP
17 TCE 4a 2SF
#Location WP Description To do by Solved
1 TCE MEP
2 TCE 2b 10LF
PLAN LEVEL 2
15
16
17
PLAN LEVEL 3
1
2
Page 12 / 19 Rapport du 08/15/201851
#Location WP Description To do by Solved
3 TCE 4a 9SF
4 TCE Lighting off typ level
5 TCE 4a 16SF - chain dragged area. Concrete around sounds solid
6 TCE 4a 4SF
7 TCE 4a 2SF
8 TCE 4a 9SF
9 TCE 2b 10LF 4 locations
PLAN LEVEL 3
3
5
6
7
8
9
Page 13 / 19 Rapport du 08/15/201852
#Location WP Description To do by Solved
10 TCE 4c 4SF
11 TCE EJ
12 TCE EJ
13 TCE MEP
14 TCE Broken glass
15 TCE Signage
16 TCE 4b 4SF
PLAN LEVEL 3
10
11
13
14
15
16
Page 14 / 19 Rapport du 08/15/201853
#Location WP Description To do by Solved
17 TCE 4a 4SF
18 TCE MEP
19 TCE MEP
20 TCE 4b 4SF
21 TCE EJ
22 TCE 4b 4SF
PLAN LEVEL 3
17
18
19
20
21
22
Page 15 / 19 Rapport du 08/15/201854
#Location WP Description To do by Solved
23 TCE 4a 4SF
24 TCE 4b 4SF
25 TCE 4wall 2SF
26 TCE 4a 4SF
#Location WP Description To do by Solved
1 TCE MEP
PLAN LEVEL 3
23
24
25
26
PLAN LEVEL 4
1
Page 16 / 19 Rapport du 08/15/201855
#Location WP Description To do by Solved
2 TCE Landscaping
3 TCE Light poor lights working? New fixtures
4 TCE EJ
5 TCE Caulking ext. wall typ at stairwells
6 TCE 4wall 2SF
7 TCE Missing glass
8 TCE Signage
PLAN LEVEL 4
2
4
5
6
7
8
Page 17 / 19 Rapport du 08/15/201856
#Location WP Description To do by Solved
9 TCE MEP
10 TCE Signage
11 TCE 4a 4SF
12 TCE MEP
PLAN LEVEL 4
9
10
11
12
Page 18 / 19 Rapport du 08/15/201857
Notes
Nice sunny day. Initial look, ramp looks good.
Page 19 / 19 Rapport du 08/15/201858
1
2
3
45
67
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
242526
27
28
29
30 31
32
33
34
35
36
37
38
39
40
41
42
43 4445
46
47
48
49
50 51
Level 1
59
1
2
3
4
5
67
8
910
11
12
13
14
15
16
17
Le
v
e
l
2
60
1
2
3
4
5
6
7
8
9
10 11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Le
v
e
l
3
61
1
2
3
4
5
6
7
8
9
10
11
12
Le
v
e
l
4
62
47 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
APPENDIX D
SITE PHOTOGRAPHS – FAIRVIEW RAMP
Figure 1. Fairview Ramp: Typical Efflorescence
Figure 2. Fairview Ramp: Typical Lighting Conditions
63
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 48
Figure 3. Fairview Ramp: Typical Spalling and Delamination
Figure 4. Fairview Ramp: Typical Interior Signage
64
49 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
Figure 5. Fairview Ramp: Typical Delamination at Traffic Membrane
Figure 6. Fairview Ramp: Typical Rusting of Interior Railings
65
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 50
Figure 7. Fairview Ramp: Typical Joint between Stair Towers and Floor Plate
Figure 8. Fairview Ramp: Typical Interior Rusting of the Stair Towers
66
51 City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection
Figure 9. Fairview Ramp: Typical Interior Drainage
Figure 10. Fairview Ramp: Typical Caulk Joint Failure, Level 3
67
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 52
APPENDIX E
INSPECTION NOTES – FAIRVIEW RAMP
68
Van Buran and 40th Ramp 07/24/2018
PPrésent E Excusé AAbsent C Convoqué à la prochaine réunion
INFORMATIONS SUR LE PROJET
Nom
Columbia Heights
Adresse
Type de construction
PARTICIPANTS
PERSONNES RELATIVES AU PROJET
Nom Contact Email Téléphone Présent
Owner
Owner's assistant
Page 1 / 20 Rapport du 08/15/201869
OBSERVATIONS
#Location WP Description To do by Solved
1 TCE SOG - lighting
2 TCE SOG - 4a 4SF Leak above causing spall
3 TCE SOG - 4a 2SF Leak above causing spall
4 TCE SOG - 4a 4SF
5 TCE SOG - MEP
6 TCE SOG - TYP floor cracking
7 TCE SOG - poor lighting. 1 light per bay
PLAN CLINIC - LEVEL 1_8.5X11
1
2
3
4
5
Page 2 / 20 Rapport du 08/15/201870
#Location WP Description To do by Solved
8 TCE SOG - 4b 4SF
9 TCE SOG - rusted elect. Box
10 TCE SOG - 4a 4SF
11 TCE SOG - 4a 4SF
12 TCE SOG - MEP
13 TCE SOG - 4a 4SF
14 TCE SOG - 2a 60 LF
PLAN CLINIC - LEVEL 1_8.5X11
8
9
10
11
12
13
Page 3 / 20 Rapport du 08/15/201871
#Location WP Description To do by Solved
15 TCE SOG - caulk joint
16 TCE SOG - 4a 4SF
17 TCE L1- previous repair
18 TCE L1- 4a 2SF 7 loc. - chain dragged location. Delam around spalls, increase to
20SF
19 TCE L1- 4a 4SF chain dragged location
20 TCE L1- 4a 3SF 5 loc. - chain dragged. Increase to 6 locations
PLAN CLINIC - LEVEL 1_8.5X11
15
16
17
18
19
20
Page 4 / 20 Rapport du 08/15/201872
#Location WP Description To do by Solved
21 TCE L1- 4a 4SF
22 TCE L1- 4a 2SF
23 TCE Typ repair- replace caulking
24 TCE L1- 4a 2SF
25 TCE L1 - ceiling caulk joints are in good condition
26 TCE L1 - 2c
27 TCE L1 - efflorescence
PLAN CLINIC - LEVEL 1_8.5X11
21
22
24
25
26
27
Page 5 / 20 Rapport du 08/15/201873
#Location WP Description To do by Solved
28 TCE L1- 4b 4SF
29 TCE L1 - efflorescence
30 TCE L1 - MEP
31 TCE L1 - ADA Stall slope
32 TCE L1- 4b 4SF
33 TCE L2-rusting on floor plate.
PLAN CLINIC - LEVEL 1_8.5X11
28
29
30
31
32
33
Page 6 / 20 Rapport du 08/15/201874
#Location WP Description To do by Solved
34 TCE L2-2c
35 TCE Signage
36 TCE L2-previous repair
37 TCE L2-MEP
38 TCE L2-timber plate. 2x14 plate
39 TCE L2-previous repair
PLAN CLINIC - LEVEL 1_8.5X11
34
35
36
37
38
39
Page 7 / 20 Rapport du 08/15/201875
#Location WP Description To do by Solved
40 TCE SOG-railing painting
41 TCE L1-4a 10sf chain dragged location
42 TCE L1- 4a 10SF chain dragged
#Location WP Description To do by Solved
1 TCE L3- light poles look to be in good shape. New light fixture heads.
2 TCE L3-signage
3 TCE L3-previous repair
PLAN CLINIC - LEVEL 1_8.5X11
40
42
PLAN CLINIC - LEVEL 2_8.5X11
1
2
3
Page 8 / 20 Rapport du 08/15/201876
#Location WP Description To do by Solved
4 TCE L3-4c
5 TCE L3-typ horizontal cracking on facade
6 TCE L3-previous repair
7 TCE L3-MEP
8 TCE L3-typ caulking around perimeter
9 TCE L3-4c
PLAN CLINIC - LEVEL 2_8.5X11
4
5
6
7
8
9
Page 9 / 20 Rapport du 08/15/201877
#Location WP Description To do by Solved
10 TCE L3-4a
11 TCE L3-4a
12 TCE L3 to L2 construction joint transition
13 TCE L2-previous repair traffic coating
14 TCE L2-traffic coating wear
15 TCE L2-efflorescence
PLAN CLINIC - LEVEL 2_8.5X11
10
11
12
13
14
15
Page 10 / 20 Rapport du 08/15/201878
#Location WP Description To do by Solved
16 TCE L2-MEP
17 TCE L2-2c
18 TCE L1- 4a 2SF
19 TCE L1- 4a 16SF - chain dragged location. Delamination around visible spall.
20 TCE L1- 4b 4SF
21 TCE L1- 4a 4SF
PLAN CLINIC - LEVEL 2_8.5X11
16
17
18
19
20
21
Page 11 / 20 Rapport du 08/15/201879
#Location WP Description To do by Solved
22 TCE L1- 4a 16SF
23 TCE L1- 4a 4SF
24 TCE L1-caulk joint leaking to wall below
25 TCE SOG- railing replace, fix, or paint 35'
26 TCE SOG-railing spall
27 TCE SOG - MEP
PLAN CLINIC - LEVEL 2_8.5X11
22
23
24
25
26
27
Page 12 / 20 Rapport du 08/15/201880
#Location WP Description To do by Solved
28 TCE SOG - MEP
29 TCE SOG-2b 20LF
30 TCE SOG-4w cracked grout
31 TCE SOG-4b 2SF
32 TCE SOG-water running down wall
33 TCE Typ SOG panel- 20'x30'
#Location WP Description To do by Solved
1 TCE SOG-rusted door frame
PLAN CLINIC - LEVEL 2_8.5X11
28
29
30
31
32
PLAN CLINIC - LEVEL 3_8.5X11
Page 13 / 20 Rapport du 08/15/201881
#Location WP Description To do by Solved
2 TCE Rusted door frame to note 1
3 TCE SOG- Rusted angle and floor plate
4 TCE Typ stairs new fixtures and paint
5 TCE L1-rusted angle and floor plate
6 TCE L1-rusted door frame
7 TCE L1-rusted signage
PLAN CLINIC - LEVEL 3_8.5X11
2
3
4
5
6
7
Page 14 / 20 Rapport du 08/15/201882
#Location WP Description To do by Solved
8 TCE L3-cracked caulk joint
9 TCE L3-recommend replacing caulk joint at base of door with exp joint material
10 TCE L3-recommend replacing caulk joint at base of door with exp joint material
11 TCE L3-signage
12 TCE L3-missing fire extinguisher
13 TCE Typ replace caulking around stairs
PLAN CLINIC - LEVEL 3_8.5X11
8
9
10
11
12
13
Page 15 / 20 Rapport du 08/15/201883
#Location WP Description To do by Solved
14 TCE Missing caulk joint at curb
15 TCE L2-rusting on floor plate and angle
16 TCE L2-rusting on door frame
17 TCE Typ handrails to paint
18 TCE
19 TCE L1-rusted angle and floor plate
PLAN CLINIC - LEVEL 3_8.5X11
14
15
16
17
18
19
Page 16 / 20 Rapport du 08/15/201884
#Location WP Description To do by Solved
20 TCE L1-rusted door frame
21 TCE Ext-MEP
22 TCE Ext-MEP
23 TCE Ext-4
24 TCE Typ staining on top facade panels
25 TCE Typ grating is rusting
PLAN CLINIC - LEVEL 3_8.5X11
20
21
22
23
24
25
Page 17 / 20 Rapport du 08/15/201885
#Location WP Description To do by Solved
26 TCE Ext-efflorescence
27 TCE Ext-MEP
28 TCE Ext-MEP
29 TCE Ext-fencing
30 TCE Ext-fencing painting 12'
31 TCE Ext-4
PLAN CLINIC - LEVEL 3_8.5X11
26
27
28
29
30
31
Page 18 / 20 Rapport du 08/15/201886
#Location WP Description To do by Solved
32 TCE Ext- grout
33 TCE Ext-missing post
34 TCE Ext-4
35 TCE Ext- grout
36 TCE Ext-signage
37 TCE Ext-signage
PLAN CLINIC - LEVEL 3_8.5X11
32
33
34
35
36
37
Page 19 / 20 Rapport du 08/15/201887
Notes
Nice sunny day. Initial look, ramp looks good.
Page 20 / 20 Rapport du 08/15/201888
A B C
1
2
3
4
5
6
7
8
9
10
11
12
NORTH
1
2 3
45
6
7
8 9
10
11
12
13
14
15 16
17
1819
2021
22
23
24 25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Clinic - Level 1_8.5x11
89
A B C
1
2
3
4
5
6
7
8
9
10
11
12
NORTH
1
2 3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1819
20
2122
23 24
2526
27
28
29
30
31
32
33
Clinic - Level 2_8.5x11
90
A B C
1
2
3
4
5
6
7
8
9
10
11
12
NORTH
1 2
3 4
5 6 7
8
9
10
11
12
13
14 1516
17
18
1920
21
22
23
24
25
26
27
28
29 3031
32
33
34
35
36 37
Clinic - Level 3_8.5x11
91
City of Columbia Heights 637 38th Avenue NE │ 2018 Parking Ramp Inspection 76
APPENDIX F
CHLORIDE ION TEST REPORTS
92
550 Cleveland Avenue North | Saint Paul, MN 55114
Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO
This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc.
REPORT OF CHEMICAL ANALYSIS
PROJECT: REPORTED TO:
COLUMBIA HEIGHTS PARKING RAMP 637 38TH AVENUE NE COLUMBIA HEIGHTS, MN 55421
KIMLEY-HORN AND ASSOCIATES INC 2550 UNIVERSITY AVE W SUITE 238N
ST PAUL, MN 55114 ATTN: CARI RIEWER AET PROJECT NO: 05-20054 DATE: AUGUST 13, 2018
INTRODUCTION
This report presents the results of laboratory work performed by our firm on eighteen (18) powdered samples submitted to us by Cari Riewer of Kimley-Horn and Associates Inc. on August 7, 2018. The scope of our work was limited to documenting the chloride content of the powders by ASTM C1152 “Standard Test Method for Acid-Soluble Chloride in Mortar and Concrete.”
TEST RESULTS
Sample Identification
Sample Depth Acid Soluble Chloride by Weight % of Sample
ppm (mg/Kg)
Ramp 1 40th Ave Lvl 2 A.5/3 0-1" 0.257 2570
1-2" 0.027 270
2-3" 0.014 140
Ramp 1 40th Ave Lvl 3 B.5/6 0-1" 0.275 2750
1-2" 0.019 200
2-3" 0.014 140
Ramp 1 40th Ave
Lvl 4 C/11 0-1"
0.064
640
1-2" 0.008 81
2-3" 0.008 78
Ramp 2 Van Buren Lvl 2 A.5/4 0-1" 0.398 3980
1-2" 0.058 580
2-3" 0.011 110
Ramp 2 Van Buren Lvl 3 B/ 6.5 0-1" 0.500 5000
1-2" 0.269 2690
2-3" 0.126 1260
CONSULTANTS
· ENVIRONMENTAL
· GEOTECHNICAL
· MATERIALS
· FORENSICS
93
AET Project No. 05-20054- Page 2 of 2
Sample Identification
Sample
Depth
Acid Soluble Chloride by
Weight % of Sample ppm (mg/Kg) Ramp 2 Van Buren Lvl 3 B.5/10 0-1" 0.511 5110
1-2" 0.116 1160
2-3" 0.013 130
TEST PROCEDURES Laboratory testing was performed on August 8, 2018 and subsequent dates. Testing was performed in
accordance with ASTM C1152 “Standard Test Method for Acid-Soluble Chloride in Mortar and Concrete.” Results are reported on an as received basis. REMARKS The test samples will be retained for a period of at least thirty days from the date of this report. Unless
further instructions are received by that time, the samples may be discarded. The test result relates only to the samples tested. No warranty, express or implied, is made. Report Prepared by: American Engineering Testing, Inc. Report Reviewed by: American Engineering Testing, Inc.
Kattie Reamer Chemist I
Bill Rebel Principal Chemist
Phone: 651-603-6633 brebel@amengtest.com
94
Le
v
e
l
2
Le
v
e
l
3
Le
v
e
l
4
95
Le
v
e
l
3
Le
v
e
l
3
Le
v
e
l
2
96
AGENDA SECTION WORK SESSION
ITEM NO. 6
MEETING DATE MAY 4, 2020
CITY OF COLUMBIA HEIGHTS - COUNCIL LETTER
ITEM: CITY HALL SCHEMATIC DESIGN, INTERIOR LAYOUT, AND EXTERIOR CONCEPT RENDERINGS
DEPARTMENT: Public Works CITY MANAGER’S APPROVAL:
BY/DATE: Kevin Hansen, Aaron Chirpich / April 30,
2020
BY/DATE: 5/1/20
CITY STRATEGY: #7: Strong Infastructure/Public Services
Additional Strategy? #2: Economic Strength
SHORT TERM GOAL (IF APPLICABLE): N/A
Additional Goal? N/A
BACKGROUND: At the December 10th, 2018 regular meeting the City Council accepted the Master Plan for a
New City Hall, meeting one of the Council goals established earlier in the year. At the City Council meeting on
September 23rd, the Council selected the 40th and Central Avenue site as the location for a New City Hall under
a public-private partnership with the site developer, Alatus. On October 14, 2019, the Council selected the
firm of Leo A Daly as the project architect for the City Hall buildout. The design follows a process including
refining the spatial layout or fit plan, schematic design, design development, and final design with contract
documents, bid award and construction administration services.
Attached is the Schematic Design report from LAD detailing the buildout of the new City Hall. The report
includes:
• Fit plan with updated layout
• Updated cost estimate
• Narrative on the overall design systems, general character and finishes establishing the framework of
the design, including:
o Zoning of the interior space: public, support, staff
o Interior quality, furniture, AV/Media/Technology
o Interior materials
• Life Safety / Fire Suppression
• Mechanical and Electrical Systems
• Support renderings
The intent of the schematic design is to provide the framework and focus entering into the design process.
Interior Layout and Exterior Building renderings:
One of the primary tasks the City architect needed to address was how our space would fit based on the overall building
design, focusing on concrete column placement and physical wall locations in the multi-story building. Over the last
couple of months, the City Architect coordinated with the Developer’s architect, Doran, to integrate the column
placement and wall’s based on Doran’s design. The final layout is attached and will be reviewed with the Council at the
May 4th meeting.
Another task of Leo A Daly was to provide concepts, layouts and materials recommendations for the exterior of the City
Hall for the Central and 40th Avenues’ fronts. The emphasis was to have City Hall have a unique appearance, continue
elements consistent with recently built City facilities and to aesthetically blend with the Doran design. Attached please
find 2 concepts for City Hall, labeled ‘Portal’ and ‘Funnel’ designs. The architect provided the following narratives for
each: 97
City of Columbia Heights - Council Letter Page 2
We have labeled The Portal design “Option 1”, and the Funnel design “Option 2”. We have also provided 2 different
color variations of each option, one with a blue/gray metal panel, and one with a dark charcoal metal panel. The
blue/gray lets the city hall stand out a bit different from the rest of the development, and the dark charcoal/black,
blends in a bit more. So in total there are 4 options to review, 1A, 1B, 2A, 2B.
We were able to pull in the design of the development above and are showing that more representative than previously,
in both form and color as we know of it today. Our intention behind the metal panel will also be to discuss and
coordinate reveals in the metal panels, similar to the attached reference graphic/image. This image also shows our
intent on the finish of the panels, this one being the dark charcoal/black option.
We are using the limestone as the feature along central/entry with a dark cast stone base at the main façade and along
40th and then metal panel and windows above. The eyebrow element would be coordinate with Doran is currently
proposing. We have also looked at how to set the windows back in the façade as seen in the street view images. It looks
like the exterior panels of the development above are a fiberboard material after further review of their documents, so
we feel the concrete/cast stone/limestone and metal panel of the city hall design will be different in finish enough to
help express independence, but in tones that work with the rest of the development for a cohesive feel.
STAFF RECOMMENDATION: Accept the Schematic Design report dated April, 2020 from Leo A Daly for the
construction of a New City Hall.
RECOMMENDED MOTION(S): 1. Move to accept the Schematic Design report from Leo A Daly for the
construction of the new City Hall. 2. Review / Comment / Input on the exterior designs
ATTACHMENT(S): Schematic Design Report from Leo A Daly, updated April 30, 2020
Updated Interior Layouts
Interior Renderings
Exterior Design Options
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
12
9
13
0
13
1
13
2
13
3
13
4
13
5
13
6
13
7
13
8
13
9
14
0
14
1
14
2
14
3
14
4
14
5
14
6
14
7
14
8
14
9
15
0
15
1
15
2
15
3
15
4
15
5
15
6
15
7
15
8
15
9
16
0
16
1
16
2
16
3
16
4
16
5
16
6
16
7
16
8
16
9
17
0
17
1
17
2
AGENDA SECTION WORK SESSION
ITEM NO. 7
MEETING DATE MAY 4, 2020
CITY OF COLUMBIA HEIGHTS - COUNCIL LETTER
ITEM: Board & Commission Interviews
DEPARTMENT: Administration CITY MANAGER’S APPROVAL:
BY/DATE: Nicole Tingley/April 28, 2020 BY/DATE: 5/1/20
CITY STRATEGY: #8: Engaged, Multi-Generational Population
Additional Strategy? Chhhhh hh hhhhh
SHORT TERM GOAL (IF APPLICABLE): Chhhhh hh hhhhh
Additional Goal? Chhhhh hh hhhhh
BACKGROUND:
Interviews for the 2020 Board & Commission openings originally scheduled for mid-March were cancelled as a
precaution to COVID-19. These interviews were scheduled for 15 minutes each over a four day period. The City
had 24 applicants for the following commissioner terms that expired April 1, 2020:
•Planning Commission Chair Marlaine Szurek
•Planning Commissioner Mike Novitsky
•Library Board Member Steve Smith
•Park and Recreation Commissioners Tom Greenhalgh, Kevin McDonald, and David Payne
•Traffic Commission Chair Len Olson
The commission applications are broken down by commission as follows (some applicants were interested in
multiple commissions):
Planning Commission- 11 8-Planning Only, 1 for all, 1 for Park, Library &
Planning, 1 for Planning & Charter
Park & Recreation Commission- 13 8, 1 for Park & Library, 1 for Park & Charter, 1 for all, 1
for Park, Library & Planning
Library Board- 6 2, 2 for Park & Library, 1 for all, 1 for Park, Library &
Planning
Traffic Commission- 1 1 for all
City Staff is seeking direction from City Council on how to move forward with conducting interviews and
making appointments for these positions. This includes when, where, and how.
Some considerations/options:
1.The City has a Zoom Account that could be used for virtual interviews. Logistics transitioning between
interviews/applicants would be difficult to complete without some break time in-between each
interview. Applicants may also have access issues.
2.The Council Chambers could be used for social distancing in-person interviews- Council could be seated
spaced out and applicants could speak at the podium.
173