The following is the agenda for a Special Meeting of the City Council for the Public Improvement Hearing to be
held at 6:00 PM on Monday, January 27, 2020 in the City Council Chambers, City Hall, 590 40th Avenue N.E.,
Columbia Heights, Minnesota.
1. CALL TO ORDER
2. ROLL CALL
3. PLEDGE OF ALLEGIANCE
4. PUBLIC IMPROVEMENT HEARING: 2020 STREET REHABILITATION PROGRAM – ZONE 4A
A. Street Rehabilitation Project
1) Presentation of Information on Street Rehabilitation – Zone 4A Project by Staff
• 5th Street NE, 50th Avenue to 51st Avenue
• 6th Street NE, 50th Avenue to 51st Avenue
2) Questions and Comments on Street Rehabilitation Project
MOTION: Move to close the Public Hearing of the 2020 Street Rehabilitation – Zone 4A, Project
1802, and waive the reading of Resolution 2020-10, there being ample copies available for the public.
MOTION: Move to adopt Resolution 2020-10 being a resolution ordering improvements and
preparation of plans for 2020 Street Rehabilitation – Zone 4A, City Project 1802.
5. ADJOURNMENT
_______________________________________________
Kelli Bourgeois, City Manager
Auxiliary aids or other accommodations for disabled persons are available upon request when the request is made at least 48 hours
in advance. Please contact the City Clerk at 763-706-3611 or ntingley@columbiaheightsmn.gov, to make arrangements.
AGENDA SECTION PUBLIC IMPROVEMENT HEARING
ITEM NO.
MEETING DATE JANUARY 27, 2020; 6:00 PM
CITY OF COLUMBIA HEIGHTS - COUNCIL LETTER
ITEM: PUBLIC HEARING: IMPROVEMENTS FOR ZONE 4A STREET REHABILITATION, PROJECT 1802
DEPARTMENT: Public Works CITY MANAGER’S APPROVAL:
BY/DATE: Kevin Hansen / January 23, 2020 BY/DATE:
BACKGROUND:
The City Council accepted the Feasibility Report and ordered an Improvement Hearing for January 27, 2020 at
their meeting of November 12, 2019.
Staff held an informational meeting on January 22, 2020 at 6:00 p.m. Copies of the Feasibility Report were
available to the public at this meeting.
ANALYSIS/CONCLUSIONS:
Distributed at the November 12, 2019 regular City Council meeting was the Feasibility Report that details the
scope of work and estimated costs for Zone 4A Street Rehabilitation. The report details the rehabilitation
strategy for Full Reconstruction, Partial Reconstruction and Mill and Overlay. The report recommendations for
Zone 4A are summarized below:
Rehabilitation Strategies:
Staff utilizes three methods in evaluating the condition of the street and then determining the
appropriate treatment. The following is a listing of streets with the recommended treatment:
FULL STREET RECONSTRUCTION
1. 5th Street, 50th Avenue to 51st Avenue
2. 6th Street, 50th Avenue to 51st Avenue
Utilities Replacement:
Utilities have been reviewed. Staff utilized structure inspections, in-line televising, history of water
main breaks, age of water main and services, leakage testing (independent testing), and previous
engineering reports in determining utility replacements. A summary of the staff recommended
improvements follows:
Water Main: On 5th Street, water main replacement is proposed, including gate valves
and fire hydrants. The existing water main is 6” cast iron pipe, installed in 1942. The
stop box on 4 properties is either not accessible or does not operate.
Repair/replacement of the stop box is scheduled for these 4 properties. Fifteen houses
were built before 1950. Potentially, the service pipe between the main and the stop box
is not ¾” or larger copper pipe and will require replacement. The property owner is
responsible for the water service from the meter in the house to the water main.
On 6th Street, a mid-block gate valve will be installed and a fire hydrant/gate valve will
be replaced.
City of Columbia Heights - Council Letter Page 2
Storm Sewer: The lateral and trunk lines have all been cleaned and televised and
the manholes/catch basins have been inspected. Rehabilitation of several catch basins
is recommended. Castings and rings are scheduled for replacement on structures.
Sanitary Sewer: The lines have all been cleaned and televised and
the manholes have been inspected. Only castings and rings are scheduled for
replacement on structures.
Utility Adjustments: Roadway construction will include minor modifications to existing
water main, sanitary and storm sewer utility surface structures in order to meet
proposed finish grades.
Financing:
Street Rehabilitation
The estimated project costs are as follows:
1. Full street reconstruction $499,200
2. Utilities $140,000
Project street reconstruction funding is proposed as follows:
o Assessments $249,600
o Infrastructure Fund (Construction) $226,900
o Infrastructure Fund (Engineering and Admin) $ 22,700
Project utility funding is proposed as follows:
o Water Construction Fund: $115,000
o Storm Sewer Fund $ 20,000
o Sanitary Sewer Fund: $ 5,000
Active Past Assessments:
6th Street, 50th Avenue to 51st Avenue – East side
Owners on the east side of the block have had an assessment for mill and overlay on 51st Avenue in
2009.
Resident Comments at Meeting:
An informational meeting was held for residents on Wednesday, January 22nd. Ten residents attended. The
City Engineer reviewed the Street Rehabilitation program and methods used to determine type of street
construction and extent of utility work needed. Assessment procedures were also discussed. Cost of the
assessment was the primary concern.
The proposed street assessments for residential properties are shown below:
Type of Proposed Residential Assessment
Street Rehabilitation Street Avenue
5th Street, 50th Avenue to 51st Avenue, Full Street Reconstruction $4,800.00 $1,600.00
and 6th Street, 50th Avenue to 51st Avenue
City of Columbia Heights - Council Letter Page 3
RECOMMENDED MOTION(S): Move to waive the reading of Resolution 2020-10, there being ample copies
available for the public.
Move to adopt Resolution 2020-10, being a resolution ordering improvements and preparation of plans for
Zone 4A Street Rehabilitation, City Project 1802.
ATTACHMENT(S): Resolution 2020-10
Informational Meeting Agenda
Attendance List
Assessment Rates
Maps
Public Improvement Hearing Notice
RESOLUTION NO.2020-10
A resolution of the City Council for the City of Columbia Heights, Minnesota,
Whereas, Resolution 2019-87 of the Columbia Heights City Council adopted the 12th day of November, 2019, fixed
a date for a Council hearing on the proposed improvement on 5th Street from 50th Avenue to 51st Avenue, and on
6th Street from 50th Avenue to 51st Avenue,and
Whereas,ten days’ mailed notice and two published notices of the hearing a week apart were given, and the
hearing was held thereon the 27th day of January, 2020, at which time all persons desiring to be heard were given
an opportunity to be heard thereon, and
Whereas, the Council determines to proceed with this local improvement, a portion of the cost being defrayed by
special assessments under Charter provisions,
1802 ZONE 4A STREET REHABILITATION
5th Street,50th Avenue to 51st Avenue
6th Street, 50th Avenue to 51st Avenue
Work includes required utility reconstruction, required water service replacement/repair (on 5th Street), new
granular subbase if needed, new aggregate base, new concrete curb and gutter with driveway aprons, new
bituminous surfacing, required concrete or bituminous driveway and walk/step replacement, turf restoration,
miscellaneous construction items, and appurtenances.
Now, therefore, in accordance with the foregoing, and all ordinances and regulations of the City of Columbia
Heights, the City Council of the City of Columbia Heights makes the following:
FINDINGS OF FACT
Such improvement is necessary, cost-effective and feasible as detailed in the Feasibility Report.
Such improvement is hereby ordered as proposed in the Council Resolution adopted the 12th day of November,
2019.
These improvements shall also be known as Project No. 1802,PIR:2020-Z4-02-001.
The City Engineer, Kevin Hansen, is hereby designated as the engineer for this improvement.The engineer shall
prepare plans and specifications for the making of such improvement.
ORDER OF COUNCIL
Passed this 27th day of January,2020
Offered by:
Seconded by:
Roll Call:
Donna Schmitt, Mayor
Attest:
Nicole Tingley, City Clerk/Council Secretary
CITY OF COLUMBIA HEIGHTS
INFORMATIONAL MEETING
Street Rehabilitation: Zone 4A
City Council Chambers
Wednesday,January 22, 2020 6:00 p.m.
A G E N D A
·6:00–6:15 Staff Presentation
q Introductions, Sign-in
q City-wide Street Rehab Program
®Background
o Large Investment in Infrastructure
o Focus on maintaining and extending the life of streets
®Program organized into 7 Zones
®Evaluation performed in each zone (3 evaluation methods)
®Goal: Doing right thing at the right time
q Zone 4A Engineering Report (copy available)
®Scope of Work
o Streets (Full Reconstruction)
5th Street,50th Avenue to 51st Avenue
6th Street,50th Avenue to 51st Avenue
o Limited Access during construction
o Utilities
·Water Main Replacement (5th Street)
·Sewer Improvements
·Structure Repair to Manholes / Catch Basins
®Estimated Costs (final based upon actual)
®Funding (Cost Share)
q Assessment Methodology
®Unit Rate Basis (per parcel)
q Improvement Process and Tentative Schedule
®Informational Meeting (1/22/2020)
®Improvement Hearing (1/27/2020)
®Final Plans & Bidding (2/2020)
®Pre-Construction Meeting (5/2020)
®Construction (6/2020 –10/2020)
®Assessment Hearing (10/2020)
o Assessment will appear on Property Tax Statement –Beginning 2021
q Other Construction Projects
·6:15 –7:00 General Questions/Citizen Comments
5TH STREET NE 50TH AVENUE TO 51ST AVENUE
6TH STREET NE 50TH AVENUE TO 51ST AVENUE
ESTIMATED COSTS:
CONSTRUCTION $453,818.00
ENGINEERING AND ADMINISTRATION $45,381.80-------------------
TOTAL PROJECT COST $499,199.80
ASSESSMENT:
0.0 PARCELS AT C, I, MF STREET RATE
0.0 PARCELS AT C, I, MF AVENUE RATE
(COMMERCIAL, INDUSTRIAL, MULTI-FAMILY)
52 PARCELS AT RESIDENTIAL STREET RATE
0 PARCELS AT RESIDENTIAL AVENUE RATE
ASSESSMENT RATE:
$499,199.80
----------------------=$9,600.00 / PARCEL
52.00
ESTIMATED COST SHARING:
TOTAL PROJECT COST $499,199.80
CITY SHARE -$249,599.90
-------------------
ASSESSED COST $249,599.90
PROPOSED ASSESSMENT RATES:
C, I, MF $0.00
STREET ------------------=$9,600.00 / PARCEL
0.00
C, I, MF $0.00
AVENUE ------------------=$3,200.00 / PARCEL
0.00
RESIDENTIAL $249,599.90
STREET ------------------=$4,800.00 / PARCEL
52.00
RESIDENTIAL $0.00
AVENUE ------------------=$1,600.00 / PARCEL
0.00
2020 STREET REHABILITATION PROJECTS - ZONE 4A
FULL RECONSTRUCTION
P.I.R. 2020-Z4-02-001 - COLUMBIA HEIGHTS PROJECT 1802
1/23/2020 1802 Recon Imp Hrg Display
ESTIMATED COSTS ESTIMATED COSTS
CONSTRUCTION $46,500.00 CONSTRUCTION $1,500.00
ENGINEERING AND ADMINISTRATION $4,650.00 ENGINEERING AND ADMINISTRATION $150.00
--------------------------------------
CONSTRUCTION PROJECT COST $51,150.00 CONSTRUCTION PROJECT COST $1,650.00
ASSESSMENT: ASSESSMENT:
15 PARCELS 1 PARCELS
FULL ASSESSMENT RATE FULL ASSESSMENT RATE
$51,150.00 $1,650.00
------------------=$3,410.00 / PARCEL ------------------=$1,650.00 / PARCEL
15.00 1.00
ESTIMATED COST SHARING ESTIMATED COST SHARING
TOTAL PROJECT COST $51,150.00 TOTAL PROJECT COST $1,650.00
CITY SHARE -$4,650.00 CITY SHARE -$150.00
--------------------------------------
ASSESSED COST $46,500.00 ASSESSED COST $1,500.00
PROPOSED ASSESSMENT RATE PROPOSED ASSESSMENT RATE
WATER SERVICE $46,500.00 STOP BOX $1,500.00
REPLACEMENT/REPAIR -----------------=$3,100.00 / PARCEL REPLACEMENT/REPAIR -----------------=$1,500.00 / PARCEL
15.00 1.00
2020 STREET REHABILITATION PROJECTS - ZONE 4A
P.I.R. 2020-Z4-02-001 - COLUMBIA HEIGHTS PROJECT 1802
5TH STREET NE 50TH AVENUE TO 51ST AVENUE
WATER SERVICE REPLACEMENT/REPAIR WATER STOP BOX REPLACEMENT/REPAIR
1/23/2020 Zone 4A Water Imp Hearing Display
5100
UNITS:1-33
&101-151
5057
5001
5111
4941
5024
4935
4949
4929
4840
4833
5140
5033
5128
5122
4843
5020
4837
4853
4824
4836
4830
5015
5121
5025
5131
5141
5014
5152
4911
5005
4905
51005100
5000
5210
5207
4837
5010
4838
5101
5016
4829
4828
4925
4947
4845
4841
5035
4839
4901
4935
4927
5024
4844
5027
5159
5055
5159
5205
5205
5050
5219
5060
4957 4952 49594958 4954 4955
5146
4855 4858
5141
5149
5157
551
4928
4854
4848
4842
5110
5116
4900
5215
4834
5027
4849 4846
4917
4906
5153
4925
4827
5132
5116
5000
5006
5038
5032
5140
5128
5028
5106
5206
5150
4855
4900
4960
5035
5051
5108
5041
5045
5059
4833
4954
4906
4924
4942
4918
4936
5030
5052
5036
5042
5046
4827
5111
5058
5021
4957
4951
4945
48534852
48474846
51125111
533
4911
5117
5
5
5
5
5
5100
5122
5146
5134
5156
5212
5209
5215 5210
5216
5204 5206
5107
5212
5218
4921
5147
4937
5015
5052
5129
4922
5042
5036
5149
4925
5141
4941
4917
4905
5123
5129
4931
5048
5009
51355135
5020
48584859
4912
4930
4948
5200 5200
5118
4856
4850
5200
5132
5124
5128
5011
5117
5211
50025000
4900
5001
49014900
5103
5001
4901
5215
5215
5215
4921
4937
4925
4933
4917
4909
4929
4913
5206
4936
4904
4924
4912
4908
4928
4948
4920
4944
4940
4916
4932
4946
4940 4942
5023
4904
4828
5024
4914
4948
5125
4915
5152
4825 4824
4836
5015
5142
5019
5055
5020
4930
4912
4951
5043
5107
4941
5010
4828
4909
4918
4934
4936
5029
5046
4832
5034
5047
5009
5014
5104
5033
4833
5004
5023
5041
5005
5038
4829
5015
5121
5049
5028
5051
5005
5030
4922
4932
5045
5144
4905
5054
4916
4950
5109
4917
5050
5032
4926
5148
4840
5006
5027
4832
4908
5008
4944
5017
5039
5042
5016
5037
5136
4938
4945
5200
5056
5156
5201
50585059
5207
5101
4857
51035101
48514849
5T
H
4T
H
AVE
6T
H
AVE50TH
STST
ST ST
AVE
AVE
51ST
52ND
7T
H
UN
I
V
E
R
S
I
T
Y
A
V
E
SU
ST ST
49TH
ST
LEGEND
Street Rehabilitation
Reconstruction
Water Main
Water Service
Stop Box
Replacement
Stop Box
Replacement/
Possible Service
Replacement
Possible Service
Replacement
City of
Columbia Heights
®CITY OF COLUMBIA HEIGHTS
GIS / ENGINEERING DEPT
Map Date: Map Author:Jan 2020K Young
PROPOSED
2020 STREET
REHABILITATION
PROJECTS
5TH STREET
50TH - 51ST AVENUES
6TH STREET
50TH - 51ST AVENUES
5100
UNITS:1-33
&101-151
5057
5001
5111
4941
5024
4935
4949
4929
4840
4833
5140
5033
5128
5122
4843
5020
4837
4853
4824
4836
4830
5015
5121
5025
5131
5141
5014
5152
4911
5005
4905
51005100
5000
5210
5207
4837
5010
4838
5101
5016
4829
4828
4925
4947
4845
4841
5035
4839
4901
4935
4927
5024
4844
5027
5159
5055
5159
5205
5205
5050
5219
5060
49574952 49594958 4954 4955
5146
4855 4858
5141
5149
5157
1
4928
4854
4848
4842
5110
5116
4900
5215
4834
5027
4849 4846
4917
4906
5153
4925
4827
5132
5116
5000
5006
5038
5032
5140
5128
5028
5106
5206
5150
4855
4900
4960
5035
5051
5108
5041
5045
5059
4833
4954
4906
4924
4942
4918
4936
5030
5052
5036
5042
5046
4827
5111
5058
5021
4957
4951
4945
48534852
48474846
51125111
533
4911
5117
5100
5122
5146
5134
5156
5212
5209
5215 5210
5216
5204 5206
5107
5212
5218
4921
5147
4937
5015
5052
5129
4922
5042
5036
5149
4925
5141
4941
4917
4905
5123
5129
4931
5048
5009
51355135
5020
48584859
4912
4930
4948
5200 5200
5118
4856
4850
5200
5132
5124
5128
5011
5117
5211
50025000
4900
5001
49014900
5103
5001
4901
5215
5215
5215
4921
4937
4925
4933
4917
4909
4929
4913
5206
4936
4904
4924
4912
4908
4928
4948
4920
4944
4940
4916
4932
4946
4940 4942
5023
4904
4828
5024
4914
4948
5125
4915
5152
4825 4824
4836
5015
5142
5019
5055
5020
4930
4912
4951
5043
5107
4941
5010
4828
4909
4918
4934
4936
5029
5046
4832
5034
5047
5009
5014
5104
5033
4833
5004
5023
5041
5005
5038
4829
5015
5121
5049
5028
5051
5005
5030
4922
4932
5045
5144
4905
5054
4916
4950
5109
4917
5050
5032
4926
5148
4840
4824
5006
5027
4832
4908
5008
4944
5017
5039
5042
5016
5037
5136
4938
4945
5200
5056
5156
5201
50585059
5207
5101
4857
51035101
48514849
5T
H
4T
H
AVE
6T
H
AVE50TH
STST
ST ST
AVE
AVE
51ST
52ND
7T
H
UN
I
V
E
R
S
I
T
Y
A
V
E
SU
ST ST
49TH
ST
LEGEND
Full Street
Reconstruction
Residential
Street Assessment
Water Service
Stop Box
Replacement
Stop Box
Replacement/
Possible Service
Replacement
Possible Service
Replacement
City of
Columbia Heights
®CITY OF COLUMBIA HEIGHTS
GIS / ENGINEERING DEPT
Map Date: Map Author:Jan 2020K Young
PROPOSED
2020 STREET
REHABILITATION
PROJECTS
5TH STREET
50TH - 51ST AVENUES
6TH STREET
50TH - 51ST AVENUES
1
CITY OF COLUMBIA HEIGHTS
NOTICE FOR PUBLIC IMPROVEMENT HEARING
Notice is hereby given that the City Council of Columbia Heights has determined the following Public
Improvement Hearing be held on Monday,January 27, 2020, at 6:00 p.m.in the City Council Chambers, 590
40th Avenue NE, to consider:
2020 STREET REHABILITATION PROGRAM:ZONE 4A
CITY PROJECT 1802
FULL STREET RECONSTRUCTION
P.I.R.2020-Z4-02-001
The proposed street width remains approximately the same. Work includes required utility reconstruction,
required water service replacement/repair (on 5th Street),new granular subbase if needed, new aggregate
base, new concrete curb and gutter with driveway aprons, new bituminous surfacing, required concrete or
bituminous driveway and walk/step replacement,turf restoration, miscellaneous construction items, and
appurtenances in the following generally described area:
5th Street NE,50th Avenue to 51st Avenue
6th Street NE, 50th Avenue to 51st Avenue
Estimated Cost of Improvements (not including utilities):$499,200.
Estimated Assessments for above improvements:$249,600.
Estimated Assessment for each water service replacement:$3,100.
Estimated Assessment for each water stop box replacement:$1,500.
Parcels Proposed to be Assessed or Impacted:
26-30-24-24-0015
26-30-24-24-0016
26-30-24-24-0017
26-30-24-24-0018
26-30-24-24-0019
26-30-24-24-0020
26-30-24-24-0021
26-30-24-24-0022
26-30-24-24-0023
26-30-24-24-0024
26-30-24-24-0025
26-30-24-24-0026
26-30-24-24-0027
26-30-24-24-0028
26-30-24-24-0029
26-30-24-24-0030
26-30-24-24-0031
26-30-24-24-0032
26-30-24-24-0033
26-30-24-24-0034
26-30-24-24-0035
26-30-24-24-0036
26-30-24-24-0037
26-30-24-24-0038
26-30-24-24-0039
26-30-24-24-0040
26-30-24-24-0041
26-30-24-24-0042
26-30-24-24-0043
26-30-24-24-0044
26-30-24-24-0045
26-30-24-24-0046
26-30-24-24-0047
26-30-24-24-0048
26-30-24-24-0049
26-30-24-24-0050
26-30-24-24-0051
26-30-24-24-0052
26-30-24-24-0053
26-30-24-24-0054
26-30-24-24-0055
26-30-24-24-0056
26-30-24-24-0057
26-30-24-24-0058
26-30-24-24-0059
26-30-24-24-0060
26-30-24-24-0061
26-30-24-24-0062
26-30-24-24-0063
26-30-24-24-0064
26-30-24-24-0065
26-30-24-24-0066
Said improvements are to be considered pursuant to Minnesota Statutes, Chapters 429, 444 and 469. The
improvements are to be specially assessed on an area, or frontage basis, or combination thereof against
abutting and non-abutting properties and tributary to said improvements, or served by said improvements.
The parcels and areas, as specially described herein, are subject to said special assessments unless otherwise
2
noted. The parcel numbers represent the tax parcel identification numbers. To find your tax parcel number,
check your real estate tax statement.
The total estimated cost of the above listed improvements is $650,000. Persons desiring to be heard with
reference to the proposed improvements will be heard at said time and place of the public hearing. Written
or oral objections will be considered at the public hearing.
The City of Columbia Heights does not discriminate on the basis of disability in the admission or access to, or
treatment or employment in, its services, programs, or activities. Upon request, accommodation will be
provided to allow individuals with disabilities to participate in all City of Columbia Heights’ services, programs
and activities. Auxiliary aids for handicapped persons are available upon request when the request is made at
least 96 hours in advance. Please call the City Council Secretary at 763-706-3611 to make arrangements.
CITY OF COLUMBIA HEIGHTS
KELLI BOURGEOIS, CITY MANAGER
Published in LIFE on 1/10/2020 and 1/17/2020