Loading...
HomeMy WebLinkAbout2019-2911January 24, 2019 Mr. Kevin Hansen Director of Public Works / City Engineer City of Columbia Heights 637 38 Avenue NE Columbia Heights, MN 55421 Re: Proposal for BMP Retrofit - Silver Lake Dear Mr. Hansen 2019 -2911 wsb`�' " WSB is proposing to identify a BMP along the existing storm sewer on Stinson Boulevard that w currently discharges into Silver Lake. The BMP would be installed along the existing 48 -inch pipe CO line within City property to reduce TP and TSS loading into Silver Lake. WSB will complete the following tasks: • Review the existing drainage area inputs with GIS and SWAMP data v a Identify a location for a BMP • Calculate the reduction of TP and TSS with the new BMP Provide a cost estimate for proposed work • Detail the findings in a technical memo. v WSB will provide the scope of services listed above for the cost of $3,925. If the City of Columbia Heights accepts this letter proposal, please return with signatures. z �SinceTo ° e f ental Scientist CL w z WS8 o w w Ke (n 1-IC PE z Director of Public Works /City Engineer w a a z w x 0 ^ r Kelli ou geois City Ma anger G• Group DWa EPWRopow9sCofurnba HeighM A158 Rwngarden irnp Proposal Co:umWakreighls8`dP_012A19 ducx