477 Temperance Street I St. Paul, MN 55101 1 (651) 286 -8450
February 13, 2018
Mr. Kevin Hansen
Public Works Director
City of Columbia Heights
637 38th Avenue NE
Columbia Heights, MN 55421
Re: Proposal for MPCA Draft Plans and Specifications - Silver Lake Boat Landing Stormwater Pond
Dear Mr. Hansen:
I am pleased to offer this proposal to provide the City of Columbia Heights with draft plans and
specifications for the Silver Lake Boat Landing Stormwater Pond. The draft plans and specifications will
be required as part of the MPCA certification process and adhere to the requirements in the MPCA Plans
and Specifications and Additional Supplements checklist.
SCOPE OF SERVICE
Under this proposal WSB staff will complete items B, C, and E along with a draft of item A as detailed in
the MPCA Plans and Specifications and Additional Supplements checklist (attached). These items will be
considered draft and provided to MPCA and City of Columbia Heights staff for review. These items will
be completed based on work previously initiated as part of the MPCA Abbreviated Stormwater Project
Plan Checklist.
SCHEDULE AND FEES FOR PROFESSIONAL SERVICES
MPCA Plans and Specifications and Additional Submittals -Draft
r
N L
U
Task `m
a� m
u-
Task 1 Stormwater Project Plan Components B, C, and E
Task 2 Design
Task 3 Specifications and QC Revisions
Task 4 Modeling and Reporting and QC Revisions
This timeline assumes that this proposal is accepted in February and the abbreviated stormwater and
project plan is accepted by MPCA in early April.
The total cost for completing the draft MPCA Plans and Specifications as part of the MPCA Plans and
Specs checklist is $12,730. The attached budget details the fees associated with each task specified in
the schedule above.
Building a legacy — your legacy.
Equal Opportunity Employer I wsbeng.com
KA 011552- 00OWdminlDoms Propoaal_ColumbiaHeight SllverLakeDraRPlansandspecs _021318 docx
Mr. Kevin Hansen
City of Columbia Heights
Proposal for MPCA Draft Plans and Specifications - Silver Lake Boat Landing Stormwater Pond
Page 2
If you wish to authorize this work, please sign below and return a copy to WSB. We are prepared to
begin work immediately upon receipt of the signed proposal. Please contact me with any questions you
may have at (612)246 -9346 or thavranek@wsbeng.com.
Sincerely,
WSB & Associates, Inc.
Tony H vranek
Sr. Ecologist.
ACCEPTED BY:
City of Columbia Heights
Kevin Heffso*O Cs C\n
Date: 1-
Attachments:
MPCA Plans and Specifications and Additional
Supplements Checklist
Draft Plans and Specs Budget
WSB & Associates, Inc.
Ada/x�—\—
Maia Harold
Project Engineer
KA 011552 - 0001 Admin\ DomIPropoeal_ ColumhiaHeights _SllverLakeDraftPlaneandepece _021318 doa
MINNESOTA POLLUTION
CONTROL AGENCY
520 Lafayette Road North
St. Paul, MN 55155 -4194
Applicant:
Project Number:
Project Name:
Project Engineer:
Flans and Specif cations (P&S) and
Additional Submittals
Storm Water Treatment Assistance (Minnesota Rule 7077.0277)
Plans and Specifications Content:
Minn. Rule 7077.0279 subp. 2, A. — F.
A. Plans and specifications must be signed by a Professional Engineer registered in the state of Minnesota ❑
B. A summary of design parameters for the stormwater treatment units ❑
C. A summary of the stormwater treatment system flow conditions for:
• Average design flow ❑
• Maximum design flow ❑
D. A stormwater pollution prevention plan to meet the construction stormwater permit requirements during the ❑
construction of the stormwater treatment systems
E. The latest detailed cost estimate, including operation and maintenance costs, based on the plans and specifications ❑
submitted
F. Administrative, bidding, and contract documents according to the applicable requirements under Minnesota ❑
Statues, including a 100% performance bond from the contractors
Plans and Specifications Additional Submittals:
Minn. Rule 70 77.02 79 subp. 3, A. — C.
A. A project schedule on a form prescribed by the commissioner ❑
B. A certification from the municipality that states that:
A full -time resident inspection shall be provided during construction ❑
• Written inspection reports, describing the construction inspected, construction problems, and the amount ❑
of inspection time required, shall be submitted to the commissioner on a monthly basis
C. Finalized and executed intennunicipal agreements necessary for the successful implementation and ❑
administration of the project
%Y%"V.oca.statc.mn.ur • 651- 296 -6300 • 800 - 657 -3864 • TTY 651- 282 -5332 or 800 - 657 -3864 • July
2017
R V N c0 O O O c0 O c0 w O m O N .O V P 10 1l .O 00 00 V 00 N h
O V •O f� a b%} b4 A P E!} a D` 64 M rPr •O P V 00 M N 1n v� V
N M G Cl) ap e9 �� ^ M m n V V N •O N N �O N Cl)
b4 Fs} e4 {y b4 e4 N d4 H} b4 rR
� tR tR Vf b4 Ef} IR e�}
O
O
p
p
N OD
O
w
Uf
w
C�
Q
Z
Q
O
M
Cl)
N
N
D
.p
N
0
n
iy
• a-
V)
C'
W
0a
z
°
W
Wy
J
U
M
N
N
Cl)
M
O
N O
as
>
g
z
P g
• w
y m
W
y
•
F y
� J
0ZZ
^
t=
W O
w
O
N
V V V
V
V
p
O o
,
0 2 N
bgM
� Q N
3 ° x W
�Qa:
I mC W
y
• J
0 C ;
Q
CL
y = W
ci O 0 y
• d
O
C)
O
O
O C3
w
QVU
>
Z 2:
w
Q U
J W
H N
a
°
m
z
Z
w
W Q
he
0
10
N V
V
N N N N
N
- V
N N �O N V
O N
a Z
CK g
'0-
W d
J
w
v4
mULLi
.� .6
C)
c
c o
zzz
a
C�
C
c
N
W
C c C
O O O
C � 0
O c
Z
O E C
(D a)
UUU
.L
p c cp 0
O _N
p me
w
LU `O O '> C
H
LD T C
d
Q N O C
LL
d
U U U
N N
-O :�
Z
,U
.0 'c O
OWC
0 0 0 0
6
Q- Q- n
a a).2 3 D!f (
�
5—u >
otl
a��°�s >
o
•
U�
0
-0 -a _0
�., O C: U
D
" D U5 0
0
_ co c )
_ E2
a o O
.q?
Z
n
0
a
N 0 0 0
> a a
C
6 6 p
a -O N
O=
J
n
Y-
W
_ c O` _
'- p U
W
d
N Q QU
0
Q a O aU
N O
d d
D
�v�UO� UUC3
y
»0
D n00
Q
O
— cV CM O
-
IN M V O 1- co
.— N M
- — — r- —
O
N N N N cV CV N (N
O
M M M M
O
V V V V V