HomeMy WebLinkAbout2017-28152017 -2815
-
YY
,,ww, S
477 Temperance Street I St. Paul, MN 55101 1 (651) 286 -8450
September 5, 2017
Mr. Kevin Hansen
Public Works Director
City of Columbia Heights
637 38th Avenue NE
Columbia Heights, MN 55421
Re: Proposal for MPCA Abbreviated Project Plan Checklist
Dear Mr. Hansen:
I am pleased to provide this proposal to assist the City of Columbia Heights in completing and submitting
the MPCA Abbreviated Stormwater Project Plan and Plan Supplement Checklist. This checklist is a
required component to receive MPCA plan certification for the proposed Silver Lake Stormwater Pond
Project.
SCOPE OF SERVICE
Under this proposal WSB staff will complete all items; which include Stormwater project plan contents
Items A -F as well as Stormwater project plan supplement items E and F (see attached). We anticipate
we will require some additional information from city staff to finalize the submittal, specifically for items A
and E as well as supplement item E.
SCHEDULE AND FEES FOR PROFESSIONAL SERVICES
MPCA Abbreviated Project Plan Checklist
This timeline assumes that this proposal Is acceptea In mla- aeptemoer.
The total cost for completing the MPCA abbreviated project plan is $10,866. The attached budget details
the fees associated with each task specified in the schedule above.
Building a legacy — your legacy.
Equal Opportunity Employer I wsbeng.com
K: \01792 -2'0 AdminDc_ E.t 1PCA SubmittaIs,Proposa l_C�IumbiaHeights_SII. erLakeAbbre-tedPIan_090517.docx
a�
�
;_
m
Task
U
N
O
Task 1 Stormwater Project Plan Components
Task 2 Stormwater Project Plan Supplements
Task 3 QC Revisions
Task 4 Modeling and Reporting
This timeline assumes that this proposal Is acceptea In mla- aeptemoer.
The total cost for completing the MPCA abbreviated project plan is $10,866. The attached budget details
the fees associated with each task specified in the schedule above.
Building a legacy — your legacy.
Equal Opportunity Employer I wsbeng.com
K: \01792 -2'0 AdminDc_ E.t 1PCA SubmittaIs,Proposa l_C�IumbiaHeights_SII. erLakeAbbre-tedPIan_090517.docx
Mr. Kevin Hansen
City of Columbia Heights
Proposal- Abbreviated Project Plan
Page 2
If you wish to authorize this work, please sign below and return a copy to WSB. We are prepared to
begin work immediately upon receipt of the signed proposal. Please contact me with any questions you
may have at (612)246 -9346 or thavranek(a�wsbeng.com.
Sincerely,
WSB & Associates, Inc.
Tony H,ranek
Sr. Environmental Scientist
t
ACCEPTED BY:
City of Columbia Heights
Kevin Hansen
Date: ( 7
Attachments:
MPCA Abbreviated Project Plan
Abbreviated Project Plan Budget
WSB & Associates, Inc.
Maia Harold
Project Engineer
K: A17s2- ^MAdmm\Dccc I.IPCA S ubm ittaI6Pr ip- a[_CcIum biaHeirhts_SiIverLa ke Sbbre. iatedPIan_000517.d,cx
M IMINNESOTA POLLUTION
CONTROL AGENCY
Abbreviated Stormwater
520 Lafayette Road North Project Plan and Plan Supplement
St. Paul, MN 55155 -4194 Storm Water Treatment Assistance (Minnesota Rule 7077.0277)
Applicant:
Project Number:
Project Name:
Stormwater Project Plan must be signed by a registered P. E. in the state of Minnesota ❑
Project Engineer:
Stormwater Project Plan Contents:
Minn. Rule 7077.0277 subp. 2, A. - F.
A. A complete description of the current stormwater collection system in the project service area ❑
A complete description of the current stormwater treatment system (if existent) in the project service area ❑
A complete description of the identified need in the project service area ❑
B. A complete description of the project service area including:
• The number of acres served ❑
• The estimated flow ❑
• A description of the watershed ❑
C. A brief narrative describing the project alternatives that were considered ❑
A description of how the proposed project was selected ❑
D. A complete description of the project location including:
• Location ❑
• Best management practices to be implemented for the use of stormwater treatment ❑
• Estimated construction costs ❑
• Equipment replacement costs ❑
E. A description of the long -term maintenance plan including:
• Annual operation and maintenance costs ❑
• Party responsible for performing maintenance activities ❑
• Intended life span of any proposed stormwater treatment system ❑
F. An estimate in the reduction of pollutants ❑
Note: When applicable, the estimate must include any pollutants causing or contributing to the impairments in
receiving waters
Stormwater Project Plan Supplement:
Minn. Rule 707720277subp. 3, E. - F.
E. A list of ordinances and intermunicipal agreements necessary for the successful implementation and ❑
administration of the project
F. A certification from the appropriate county or watershed management organization assuring that the stormwater ❑
project plan is consistent with the comprehensive local water plan
www.pea.state.mn.us • 651- 296 -6300 • 800 - 657 -3864 • TTY 651- 282 -5332 or 800 - 657 -3864 • July
2017
'y f
s
M
N
fN
2
0
W
H
CQ
C
H ~
N N
W J
v) Y
� U
LL W
p =z
W Z
w Q r O
� d 2 N
fW..���ri
3W=W
co
O a 0 m g w e
N - = W LU
za0N
W
z w
am
J GO
Q
O
GG
LU
Y
Q
oz
W
J
N
.o co c'7 2 L') (D n
N X64 6,-, b4 b4 64
VY
� O
w
L7
Q
GO CC) O 10 -o P O Il V V co
GO c`') V In Lo r O r) O
VT tH b4 V). Ff} h 6
O O
— O CJ N s'7
0
W
N
H
Z
W
U M cV c') N M i c7 N N N N
N
Z
W
W O
O (D U-) Lo V
V,
V,
a_
U
W C O O
N
Z-
0
z
W
--� M — (") N ch N N N (D
0
w
O
OJ
N n
b4
N
r) ) -o
N N
N
cl-
M
t61+
ol
20
Q
N CO 'o 'o T V
t+Y
H
U
W
LLI L
F
U
W
o
O
C C
O
O
D Q)
OC
W
E E
W Q ,6 U 6 L: 9
IL
K
W
_ W N
U
N
Q
a D-
Q
C
O O
0 0 0 0 0 0 a s
]
Z
O
N
_N
N
O
Q) Q) Q) ( (D
O z
c
a
Q a
(D
W
y r
z
0 0 0 0 0 0 0 0
y W
w LL
H
z
O
U O O
0 0� :_
?
p W
W d W W W W d W
J
_
>
�1
>
Q
Q N N
D
U'
co N E
`o
O
U
a s a a C)
3 3 3 3 3 3 3 3
E E
W N 0) a)
Q
-O
z
=° .o
a 3,
a, o
a=
,>
w
c
C)
Z
E E E E E E E E
ne z a a
U°
0
E
co a
0 0 0 0 0 0 0 0
m Q Q Q
Wa
U
O
Q Q O aU
j
v n
Q a v v
H
(1
» �n 0 0
Q
N ch V L I- c
N
7
7 N M V LO
O—
O N N
O
ch
O
V V V V V
N
M
U
U
O � �
C
� O O
N
g o
U U U
Q i
a a �
a
cC
Lo
� C� m