Loading...
HomeMy WebLinkAbout2017-28152017 -2815 - YY ,,ww, S 477 Temperance Street I St. Paul, MN 55101 1 (651) 286 -8450 September 5, 2017 Mr. Kevin Hansen Public Works Director City of Columbia Heights 637 38th Avenue NE Columbia Heights, MN 55421 Re: Proposal for MPCA Abbreviated Project Plan Checklist Dear Mr. Hansen: I am pleased to provide this proposal to assist the City of Columbia Heights in completing and submitting the MPCA Abbreviated Stormwater Project Plan and Plan Supplement Checklist. This checklist is a required component to receive MPCA plan certification for the proposed Silver Lake Stormwater Pond Project. SCOPE OF SERVICE Under this proposal WSB staff will complete all items; which include Stormwater project plan contents Items A -F as well as Stormwater project plan supplement items E and F (see attached). We anticipate we will require some additional information from city staff to finalize the submittal, specifically for items A and E as well as supplement item E. SCHEDULE AND FEES FOR PROFESSIONAL SERVICES MPCA Abbreviated Project Plan Checklist This timeline assumes that this proposal Is acceptea In mla- aeptemoer. The total cost for completing the MPCA abbreviated project plan is $10,866. The attached budget details the fees associated with each task specified in the schedule above. Building a legacy — your legacy. Equal Opportunity Employer I wsbeng.com K: \01792 -2'0 AdminDc_ E.t 1PCA SubmittaIs,Proposa l_C�IumbiaHeights_SII. erLakeAbbre-tedPIan_090517.docx a� � ;_ m Task U N O Task 1 Stormwater Project Plan Components Task 2 Stormwater Project Plan Supplements Task 3 QC Revisions Task 4 Modeling and Reporting This timeline assumes that this proposal Is acceptea In mla- aeptemoer. The total cost for completing the MPCA abbreviated project plan is $10,866. The attached budget details the fees associated with each task specified in the schedule above. Building a legacy — your legacy. Equal Opportunity Employer I wsbeng.com K: \01792 -2'0 AdminDc_ E.t 1PCA SubmittaIs,Proposa l_C�IumbiaHeights_SII. erLakeAbbre-tedPIan_090517.docx Mr. Kevin Hansen City of Columbia Heights Proposal- Abbreviated Project Plan Page 2 If you wish to authorize this work, please sign below and return a copy to WSB. We are prepared to begin work immediately upon receipt of the signed proposal. Please contact me with any questions you may have at (612)246 -9346 or thavranek(a�wsbeng.com. Sincerely, WSB & Associates, Inc. Tony H,ranek Sr. Environmental Scientist t ACCEPTED BY: City of Columbia Heights Kevin Hansen Date: ( 7 Attachments: MPCA Abbreviated Project Plan Abbreviated Project Plan Budget WSB & Associates, Inc. Maia Harold Project Engineer K: A17s2- ^MAdmm\Dccc I.IPCA S ubm ittaI6Pr ip- a[_CcIum biaHeirhts_SiIverLa ke Sbbre. iatedPIan_000517.d,cx M IMINNESOTA POLLUTION CONTROL AGENCY Abbreviated Stormwater 520 Lafayette Road North Project Plan and Plan Supplement St. Paul, MN 55155 -4194 Storm Water Treatment Assistance (Minnesota Rule 7077.0277) Applicant: Project Number: Project Name: Stormwater Project Plan must be signed by a registered P. E. in the state of Minnesota ❑ Project Engineer: Stormwater Project Plan Contents: Minn. Rule 7077.0277 subp. 2, A. - F. A. A complete description of the current stormwater collection system in the project service area ❑ A complete description of the current stormwater treatment system (if existent) in the project service area ❑ A complete description of the identified need in the project service area ❑ B. A complete description of the project service area including: • The number of acres served ❑ • The estimated flow ❑ • A description of the watershed ❑ C. A brief narrative describing the project alternatives that were considered ❑ A description of how the proposed project was selected ❑ D. A complete description of the project location including: • Location ❑ • Best management practices to be implemented for the use of stormwater treatment ❑ • Estimated construction costs ❑ • Equipment replacement costs ❑ E. A description of the long -term maintenance plan including: • Annual operation and maintenance costs ❑ • Party responsible for performing maintenance activities ❑ • Intended life span of any proposed stormwater treatment system ❑ F. An estimate in the reduction of pollutants ❑ Note: When applicable, the estimate must include any pollutants causing or contributing to the impairments in receiving waters Stormwater Project Plan Supplement: Minn. Rule 707720277subp. 3, E. - F. E. A list of ordinances and intermunicipal agreements necessary for the successful implementation and ❑ administration of the project F. A certification from the appropriate county or watershed management organization assuring that the stormwater ❑ project plan is consistent with the comprehensive local water plan www.pea.state.mn.us • 651- 296 -6300 • 800 - 657 -3864 • TTY 651- 282 -5332 or 800 - 657 -3864 • July 2017 'y f s M N fN 2 0 W H CQ C H ~ N N W J v) Y � U LL W p =z W Z w Q r O � d 2 N fW..���ri 3W=W co O a 0 m g w e N - = W LU za0N W z w am J GO Q O GG LU Y Q oz W J N .o co c'7 2 L') (D n N X64 6,-, b4 b4 64 VY � O w L7 Q GO CC) O 10 -o P O Il V V co GO c`') V In Lo r O r) O VT tH b4 V). Ff} h 6 O O — O CJ N s'7 0 W N H Z W U M cV c') N M i c7 N N N N N Z W W O O (D U-) Lo V V, V, a_ U W C O O N Z- 0 z W --� M — (") N ch N N N (D 0 w O OJ N n b4 N r) ) -o N N N cl- M t61+ ol 20 Q N CO 'o 'o T V t+Y H U W LLI L F U W o O C C O O D Q) OC W E E W Q ,6 U 6 L: 9 IL K W _ W N U N Q a D- Q C O O 0 0 0 0 0 0 a s ] Z O N _N N O Q) Q) Q) ( (D O z c a Q a (D W y r z 0 0 0 0 0 0 0 0 y W w LL H z O U O O 0 0� :_ ? p W W d W W W W d W J _ > �1 > Q Q N N D U' co N E `o O U a s a a C) 3 3 3 3 3 3 3 3 E E W N 0) a) Q -O z =° .o a 3, a, o a= ,> w c C) Z E E E E E E E E ne z a a U° 0 E co a 0 0 0 0 0 0 0 0 m Q Q Q Wa U O Q Q O aU j v n Q a v v H (1 » �n 0 0 Q N ch V L I- c N 7 7 N M V LO O— O N N O ch O V V V V V N M U U O � � C � O O N g o U U U Q i a a � a cC Lo � C� m