Loading...
HomeMy WebLinkAbout2017-28092017 -2809 Anoka County Contract No. C0005866 JOINT POWERS AGREEMENT FOR RECONSTRUCTION OF COUNTY STATE AID HIGHWAY 2 (40TH AVE NE) BETWEEN TH 65 AND RESERVOIR BOULEVARD IN THE CITY OF COLUMBIA HEIGHTS, MN (SAP 002 - 602 -012) THIS AGREEMENT is made and entered into this day of , 2017 by and between the County of Anoka, a political subdivision of the State of Minnesota, 2100 Third Avenue, Anoka, Minnesota 55303, hereinafter referred to as "County ", and the City of Columbia Heights, 590 40'' Avenue NE, Columbia Heights, MN 55421, hereinafter referred to as "City ". WITNES SETH WHEREAS, the parties to this agreement agree it is in the best interest of the traveling public to reconstruct County State Aid Highway 2 (CSAH 2) /40th Ave NE between TH 65 and Reservoir Boulevard and, WHEREAS, said parties mutually agree that County State Aid Highway 2 (CSAH 2)/40'1 Ave NE is in need of reconstruction and storm sewer system improvements; and, WHEREAS, the City has prepared preliminary design plans for the reconstruction and storm sewer improvements of CSAH 2 in accordance with Anoka County and the Minnesota Department of Transportation standards to a staff approved layout condition; and, WHEREAS, Anoka County has jurisdiction over CSAH 2 between TH 65 and Reservoir Boulevard and, WHEREAS, the parties agree that it is in their best interest that the cost of said project be shared; and, WHEREAS, Minn. Stat. § 471.59 authorizes political subdivisions of the state to enter into joint powers agreements for the joint exercise of powers common to each. NOW, THEREFORE, IT IS MUTUALLY STIPULATED AND AGREED: PURPOSE The parties have joined together for the purpose of reconstructing CSAH 2 beginning 58 feet east of the centerline of TH 65 to 650 feet east of the centerline of TH 65, installing new storm sewer and drainage structures from 60 feet east of the centerline of TH 65 to 600 feet east of TH 65 on CSAH 2, and mill and overlay CSAH 2 between 650 feet east of TH 65 to Reservoir Boulevard as described in the preliminary design plans. The County project number for the reconstruction is SAP 002 - 602 -012, the City project numbers are SAP 113- 020 -006. Said engineering plans are filed in the office of the City of Columbia Heights Public Works Department and the Anoka County Highway Department and incorporated herein by reference. The parties to this Joint Powers Agreement (JPA) agree in principle that construction of County State Aid Project No. 002 - 602 -012 from 58' east of Th 65 to Reservoir Boulevard is in the best interest of the traveling public and that the Preliminary Layout as shown in Exhibit "A" defines the preliminary design of the Project. It is agreed that the Exhibit "A" Layout dated June 29, 2017 has been reviewed and accepted by the parties and is suitable for preparation of final construction documents. Any significant changes made hereafter to the design as presented in the Exhibit "A" Layout will require approval by the parties as an amendment to this JPA. These same changes will require a change in the cost share to include any additional design engineering costs that may occur. II. METHOD The County shall cause the construction of Anoka County Project SAP 002 - 602 -012, City project number SAP 113 - 020 -006, in conformance with proposed engineering plans and specifications. IMPROVEMENTS It is agreed by the parties that in 2017 CSAH 2 is to be rehabilitated 58 feet east of the centerline of TH 65 to Reservoir Boulevard. Storm sewer and drainage structures will be replaced on the south side of the roadway in this segment. New storm sewer and drainage structures will be placed on the north side of the roadway in this segment. The roadway will be reconstructed from 58 feet east of the centerline of TH 65 to 650 feet east of the centerline of TH 65, and will be milled and overlayed from 650 feet east of the centerline of TH 65 to Reservoir Boulevard, to the extent shown in "Exhibit A ". Improvements include but are not limited to: reconstruction of pedestrian ramps, curb and gutter repairs, drainage structure replacement, sidewalk, pavement construction and pavement mill and overlay. The costs of these improvements have been estimated for this agreement and will be finalized after bids have been received. These costs will be shared by the County and the City. RIGHT OF WAY: The parties agree that adequate right -of -way and easements exist for the Project. Acquisition of any additional right -of -way and/or easements needed for improvements to the City sidewalk and storm sewer beyond what is defined in the Exhibit "A" Layout will be the responsibility of the City. It is agreed by the parties that all necessary right of way and easements will be in legal possession of the County prior to acceptance of bids for the project. Any City owned property or easements required for the construction will be conveyed to the County at no cost. TRAFFIC SIGNALS: There are no changes to the MnDOT owned traffic signal at TH 65 and CSAH 2. Replacements of loop dectectors and traffic system handholes are included to facilitate the roadway improvements. DRAINAGE: The City shall pay the cost of the storm sewer system, including their outlet structures. The City portion of the cost is based on the new storm sewer system to Labelle Pond on the north side of CSAH 2. The County shall pay the cost to replace the existing system on the south side of CSAH 2. 2 SIDEWALK: The parties agree that per the standard Cost Share Policy the replacement walk shall coincide with the storm sewer improvements. New pedestrian ramps will be constructed at the intersections to comply with ADA standards. The City will contribute all funds for any new sidewalk construction and the County will be responsible for the cost of any existing sidewalk replacement. The parties understand that the cost for the sidewalk includes: concrete surfacing, aggregate base, excavation (including muck excavation), borrow material (granular and topsoil), turf establishment, design of the sidewalk, the temporary easements required to construct the sidewalk at the proper location, and any removal items required to construct the sidewalk. TRAFFIC CONTROL: The parties understand and agree that CSAH 2 will be closed to thru traffic from TH 65 to 650 feet east of TH 65, and will have one EB lane and one WB lane open to thru traffic on the remainder of CSAH 2 during construction, and will always be open to emergency vehicles. The parties agree and understand the cost share for traffic control for storm sewer improvements shall be a prorated share based on the Storm Sewer Improvement costs only.Traffic control for the road rehabilitation shall be the County cost. DRIVEWAYS: The parties agree that all driveways affected by the Project will be reconstructed in kind with the cost of any upgrades requested by the City, including concrete aprons, to be the sole responsibility of the City. LANDS CAPING /STREETSCAPING: The parties agree that if the City wishes to include landscaping, streetscape features or street lighting in the project, they shall be designed in accordance with Anoka County Highway Department Landscape /Streetscape Guidelines. The City shall supply the signed plan sheets and specifications for the proposed landscape / streetscape. The total cost of the design as well as the construction cost will be at the expense of the City. All construction documents must be submitted to the County by June 30, 2017 for review. Maintenance of any landscaping /streetscaping will be the sole responsibility of the City. UTILITIES: The parties agree that the Exhibit "A" Layout does not include specific proposed utility locations. The City will be responsible for the design of any sanitary sewer and water main improvements and/or relocations due to road reconstruction, which will be incorporated into the project bid documents. The cost of the design of these features shall be the responsibility of the City. The cost of construction of these features shall be the responsibility of the City. The cost of construction of these features solely due to road reconstruction shall be the responsibility of the City. The City's design of the sanitary sewer and water main utilities are to include signed plans, specifications, and estimated quantities and cost. All construction documents must be submitted to the County by June 30, 2017 for review. PERMITS: The parties agree that the City will secure all necessary permits for this Project. The County agrees to coordinate with the City in securing the permits required by the Mississippi WMO, County permits, as well as any other permits that may be required. The City also requests that the County inform the City of any County regulations that affect construction at the time of the signing of this JPA. (e.g. setbacks, tree clearing, or any other county regulations.) III. COSTS The contract costs of the work, or if the work is not contracted, the cost of all labor, materials, normal engineering costs and equipment rental required to complete the work, shall constitute the actual "construction costs" and shall be so referred to herein. "Estimated costs" are good faith projections of the costs, which will be incurred for this project. Actual costs will vary and those will be the costs for which the relevant parties will be responsible. The estimated construction cost of the total project is $855,250. The total estimated construction cost to the County is $487,652. The County participation in construction engineering will be at a rate of eight percent (8 %) of their designated construction share of $487,652. The estimated cost to the County for construction engineering is $39,012. In summary, the total County share of this project is $526,664. (includes construction and construction engineering costs). Upon award of the contract, the County shall pay to the City, upon written request by the City, ninety -five percent (95 %) of its portion of the cost of the project estimated at $500,330. Prior to billing, this estimate will be updated by the City to reflect the actual bid prices as awarded. An updated cost estimate shall be provided to the County at the time of billing. The County's share of the cost of the project shall include only construction and construction engineering expense and does not include engineering design and administrative expenses incurred by the City. Upon final completion of the project, the County's share of the construction cost will be based upon actual construction costs. If necessary, adjustments to the initial ninety -five percent (95 %) charged will be made in the form of credit or additional charges to the County's share. Also, the remaining five percent (5 %) of the County's portion of the construction costs shall be paid. IV. TERM This Agreement shall continue until terminated as provided hereinafter. V. DISBURSEMENT OF FUNDS All funds disbursed by the County or City pursuant to this Agreement shall be disbursed by each entity pursuant to the method provided by law. VI. CONTRACTS AND PURCHASES All contracts let and purchases made pursuant to this Agreement shall be made by the City in conformance to the State laws. 4 VII. STRICT ACCOUNTABILITY A strict accounting shall be made of all funds and report of all receipts and shall be made upon request by either party. Prior to County payment to the City, Anoka County shall provide the County a copy of all cost participation documents submitted to MnDOT State Aid to assist the County in their application for CSAH funding. VIII. TERMINATION This Agreement may be terminated by either party at any time, with or without cause, upon not less than thirty (30) days written notice delivered by mail or in person to the other parry. If notice is delivered by mail, it shall be deemed to be received two days after mailing. Such termination shall not be effective with respect to any solicitation of bids or any purchases of services or goods which occurred prior to such notice of termination. The County shall pay its pro rata share of costs which the City incurred prior to such notice of termination. IX. MAINTENANCE A. Maintenance of the completed storm sewer (except catch basins and catch basin leads) and detention basins (including ponds and their outlet structures and grit chambers /collectors) shall be the sole obligation of the City. B. Maintenance of the south storm sewer shall be the sole obligation of the County. C. Maintenance of all sidewalks, including snow plowing, shall be the sole responsibility of the City. D. Maintenance of crosswalk pavement markings on City streets shall be the responsibility of the City. The City will be responsible for all crosswalk pavement markings for the crossings at all city streets. E. Maintenance of streetlights and cost of electrical power to the streetlights shall be the sole obligation of the City. XI. NOTICE For purposes of delivery of any notices herein, the notice shall be effective if delivered to the County Administrator of Anoka County, 2100 Third Avenue, Anoka, Minnesota 55303, on behalf of the County, and to the City Manager of City of Columbia Heights, 590 40"' Avenue NE, Columbia Heights, MN 55421, on behalf of the City. XII. INDEMNIFICATION The City and County mutually agree to indemnify and hold harmless each other from any claims, losses, costs, expenses or damages resulting from the acts or omissions of the respective officers, agents, or employees relating to activities conducted by either party under this Agreement. XIII. ENTIRE AGREEMENT REQUIREMENT OF A WRITING It is understood and agreed that the entire agreement of the parties is contained herein and that this Agreement supersedes all oral agreements and all negotiations between the parties relating to the subject matter thereof, as well as any previous agreement presently in effect between the parties to the subject matter thereof. Any alterations, variations, or modifications of the provisions of this Agreement shall be valid only, when they have been reduced to writing and duly signed by the parties. 9 IN WITNESS WHEREOF, the parties to this Agreement have hereunto set their hands on the dates written below. COUNTY OF�ANOKA By: 'Rhonda Sivarajah, Chair Board of Commissioners Dated: ATTEST Jerry Som�rt/ County Administrator Dated: Z� CJ RECOMMENDED FOR APPROVAL By: s 4W. Fisc E. Couky Engineer Dated: AS TO FORM By: Dan Klint Assistant County Attorney Dated: k- 1iQ"/7 CITY OF *NOKOr COL-Ut &A HEtCtiTS Donna Schmitt Mayor 1 Dated: < )a+ / : B Y Walter Fehst City Manager Dated: y I )- \ I ( 7 Dated: Dated: �- -x_3—/7 6� 7 ;er Fg n �z V1 ¢a O_ F F O V F NS6 jupi c¢i w o 'a s E. wa N li iai w �° zW z�� e� W - 6 N f yi 5� p ° U to ~`nJ WpG O zk'z aa�zzN° z° Ys Z Fvzi X o p°Fao w r UUoa 3 u ��G z6F Z~=zm ivwi v _zu rz r�3 �i mini - i z Z 21 W, a Na G �m ° N opua °oa¢a �- 4 °a °c°�i r Z < f�Or S¢; //Zr� CJ W a W m_ O IIU LL- O U Z W 0 W J 0 LL- 0 F- u N7D N L�L z 0 0 mm' - z m w � JJo�wo \ �'yooga'y�'�NN v � boa 8°nn oNN o yam nm u Q � aim nm v� o Wo 0 0 w U alw F�LLw wlc Q °o Wlo ° o u 0 m o0 as $ a o _ a LyJ Z w� �v NN NN F ¢ww w o� gJ zu orc11Jaz - x oLLMiw 6z I PH Q ^JwzLL`..'b�W W ?w afw a'�d000 00 �w¢op N �< _ ci cmimo °oo �� .. mddn LLZZ n �mmmwad°Oz r z Q w °o N % oo d7 � o c I z I = lY - s O � �NW Z O .5QOZZ w'22Ww < po0 Q O w rc. gov z rh° Q o p O N w° r F o C7 �I oaQa wwsw ow ¢zy ,n m y °wmW O U 3 Y g 4 31V"{M1' C7 m �3z�zs� �zzlaa' Qa< �d D) z ✓r ° s� WFa 01 o OZW¢w< Ln U U P C) I z J O �3d�U m z b - Oya Qo- pmm 333w uumom °R'k'ur,umm�u °uwN - KiWi.W ° m # "Zc No S N w 4 W W = o- �W < °M O > Z O cn o N �� u , w1. d S � m - W W v LJ > O> �a �< Do = N N� CD z F- O =w M W Z w O o ;G W U (n U ¢ a w Q w F w r w J 0 U U O n (-) C/) J � O W Co N U7 o C) Q Z O F C OI Q� L a o z �ozz O O � O U U NO d Z Q Q Q (n U I-- x- W m mm' - z m w � JJo�wo \ �'yooga'y�'�NN v � boa 8°nn oNN o yam nm u Q � aim nm v� o Wo 0 0 w U alw F�LLw wlc Q °o Wlo ° o u 0 m o0 as $ a o _ a LyJ Z w� �v NN NN F ¢ww w o� gJ zu orc11Jaz - x oLLMiw 6z I PH Q ^JwzLL`..'b�W W ?w afw a'�d000 00 �w¢op N �< _ ci cmimo °oo �� .. mddn LLZZ n �mmmwad°Oz r O U N % oo NI I Ip la c I z I = lY - s O I �NW Z O .5QOZZ w'22Ww < po0 Q O w rc. gov z rh° wZm W °° z waQw N O N w° r F o C7 �I oaQa wwsw ow ¢zy ,n m y °wmW O U 3 Y g 4 31V"{M1' tt rcQQa °¢ YWo aza �3z�zs� �zzlaa' Qa< �d D) z ✓r ° s� WFa 01 o OZW¢w< _ 2 W owww���� i }mz r,zS NiJ' uz-i R. W m �UizKw Oww F.. 2 J p °wLL3i(w, Q¢2 w�pt -w� m 33W6QN Z S¢}Qm7ZZwJ¢WOO� OW ° 8 w FEU W y 0 m O �3d�U Qw� ¢U b - Oya Qo- pmm 333w uumom °R'k'ur,umm�u °uwN - KiWi.W ° m # "Zc �^ wwyzj2K~<B�Q zar�° 333vru 4 ° "Ea °d XEI � ¢ m} Z z O �O Q U oy O �-z U Q U W 0 O a_ d am lo a� °mW tt3F o O U W ° I Wsm �I Z w ° Jpm 2 = lY z O Ow �NW Z O .5QOZZ w'22Ww < po0 Q O w rc. z rh° wZm W °° z waQw N O N w° r F o C7 �I oaQa wwsw ow ¢zy ,n m y °wmW O U 3 Y g 4 31V"{M1' tt rcQQa °¢ YWo aza �3z�zs� �zzlaa' Qa< �d D) z ✓r ° s� WFa 01 o OZW¢w< _ 2 W owww���� i }mz r,zS NiJ' uz-i ) F w Nal�� W m �UizKw Oww F.. 2 J p °wLL3i(w, Q¢2 w�pt -w� m 33W6QN Z S¢}Qm7ZZwJ¢WOO� OW ° 8 w FEU W y 0 m O �3d�U Qw� ¢U IUF QwLLZwW J Q Z mro - Oya Qo- pmm 333w uumom °R'k'ur,umm�u °uwN - KiWi.W ° m # "Zc p wwyzj2K~<B�Q zar�° 333vru = U�=�¢ °��w m �GNN ¢ _ XEI � j l Llio- 7) e a I m o � o U I O w � N a o> zJ (ONa K I o�E N M V N J oz E -O0 1 a � oo VI(/jw j Nm o Q r Z rO W V J O U EXHIBIT B STATEMENT OF ESTIMATED QUANTITIES Remove concrete curb and putter e -= ® - handhole e = - e - e 1. Watemain D.I.P. CL-52 e eStructure. e - e e e - e e Concrete curb and 2utter ADA e MgidPVCLoo,[)alctor Stom drain inlet pnotaction CSAH 2 (40th Avenue) Storm Sewer Reconstruction Street Reconstruction - TH 65 (Central Avenue) to 650' East Street M01 and Overlay - 650' East of TH 65 to Reservoir Blvd Ne. Item Description Unit Total Quantity Unit Price Total Amount STORM SEWER STREET CONSTRUCTION SOUTH (Anoka County) I NORTH (Columbia Heights) CSAH 2 (40th Avenue) TH65 Central to LabellOPmd CSAH 2 (40th Avenue) TH65 Central to Labaaa Pand ANOKACOUNTY COLUMBIA HEIGHTS cinm it Amount Quantity Amount Quantity Amount Quanlit Amount 1 Mobilintion Lum Sum 1.00 $30,000.00 $30.000.00 0.25 $7,417.95 0.35 $10,598.85 0.32 $9,687.62 Mall $2,295.58 2 Clearing Each 2 $400.00 $800.00 2 $800400 3 Grubbing Each 2 $100.00 $200.00 2 $200.00 4 Repave concrete curb and utter Lin. Ft. 1,440 $6.50 $9,360.00 523 $3.399.50 627 $4.075.50 290 $1,8&5.00 5 Remove water main Lin. Ft. 30 $10.00 $300.00 $0.00 30 $300.00 6 Remove hydrant lead Including ate valve and box Lin. Ft. 12 $10.00 $120.00 $0.00 12 $120.00 7 Remove sewer Lin. Ft. 665 $15.00 $9,975.00 635 $9,525.00 30 $450.00 8 Remove manhole to Lin. Ft. 5.2 $50,00 $260.00 5.2 $260.00 9 Remove concrete walk S.Ft. 6.643 $2.00 $13.286.00 2,506 $5,012.00 3,667 $7,334.00 470 $940.00 10 Remove concrete drivewa /a non S . FL 1,526 $4.00 $6,104.00 639 $2,556400 887 $3,548.00 11 Remove concrete slreettalle . FL 231 $6.00 $1,386.00 150 $900.00 81 $486.00 12 Remove bituminous pavement, 9" depth S . Yd. 3,293 $11.00 $36,223.00 608 $6.688.00 688 $7,568.00 1,997 $21,967.00 13 Remove bituminous riveway Sq. Yd. 140 1 $6.00 $840.00 29 $174.00 111 $666.00 14 Repave riprap Cu. Yd. 5 $200.00 $1,000.00 5 $1,000.00 15 Remove catch basin/Manhole Each 17 $600.00 $10,200.00 12 $7,200.00 5 $3,000.00 16 Remove handhole Each 2 $300.00 $600.00 2 $600.00 17 Sawin g concrete Full depth) Lin. Ft. 231 $5.00 $1,165.00 75 $375.00 156 $780.00 18 Sawing bituminous Futi depth) Lin. Ft. 996 $3.00 $2,988.00 411 $1,233.00 585 $1,755.00 19 Selvage MH or CB Casting Each 22 $300.00 $6,600.00 8 $2,400.00 14 $4,200.00 20 Salve e hvdmnt Each 1 $300.00 $300.00 1 $300400 21 Abandoned pipe sewer Each 2 $800.00 $1,600.00 2 $1,600.00 22 Common excavation, CV -P Cu. Yd. 3,153 $20.00 $63.060.00 732 $14,640.00 1,055 $21,100.00 1,366 $27,320.00 23 Subgrade correction. CV 19 needed Cu. Yd. 699 $20.00 $13,980.00 208 $4.160.00 264 $5,280,00 227 $4,540.00 24 Select granular borrow Ton 303 $20.00 1 $6.060.00 133 $2,660.00 170 $3.400.00 25 Granular foundation 3/8 "tot -1/2 "rock Ton 355 $25.00 $8,875.00 156 $3,900.00 199 $4,975.00 26 Dewaterin Lump Sum 1 $3,000.00 $3,000.00 065 $1,500.00 0.5 $1,500.00 27 Geotextila fabric d needed . Yd. 4,182 $2.00 $8.364.00 622 $1,244.00 688 $1,376.00 2,872 $5,744.00 28 A re ate base classy CV Ton 4,156 $20.00 $83,160.00 1,037 $20,740.00 1,191 $23820.00 1,930 $38,600.00 29 Bilurrinous special. 8" depth . Yd. 100 $90.00 $9,000.00 100 $9,000.00 30 Bituminous patch a W. 3" depth . Yd. 140 $30.00 $4,200.00 29 $870.00 23 $690.00 88 $2,640.00 31 Mill bituminous pavement. 3" de th . Yd. 5.944 $200 $11.888.00 5,944 $11.888.00 32 Drill & rout reinforcement bar (Epoxy coated Each 24 $23.00 $552.00 10 $230.00 6 $138400 8 $184.00 33 Bituminous material for tack coat Gallon 865 $3.00 $2,595.00 61 $183.00 69 $207.00 735 $2,205.00 34 T SP 12.5 non -wean course mixture 3,0 Ton 544 $70.00 $38.080.00 100 $7,000.00 114 $7,980.00 330 $23,100.00 35 Type SP 12.5 wearing course mixture (3,E) Ton 1,554 $70.00 $108.780.00 100 $7,000.00 114 $7,980.00 1,340 $93,800.00 36 6" PVC sewer pip, Lin. Ft. 40 $20.00 $800.00 40 $800.00 37 8"PVC sewer pim Lin. Ft. 42 $30.00 $1,260.00 42 $1,260,00 38 18" HP pip, sewer Lin. Ft. 57 $50.00 $2,850.00 1 57 $2,850.00 39 24" HP pip, sewer Lin. Ft. 221 $60.00 $13,260.00 173 $10,380.00 48 40 36" HP sewer Lin. Ft. 808 $80.00 $64,640.00 321 $25,680.00 487 41 36" RC Pi Sewer CL -V Lin. Ft. 90 $80.00 $7,200.00 90 $7,200.00 42 Install 36" Concrete A on Each 1 $3,000.00 $3,000.00 1 $3,000.00 H$38,960.00 43 Ductile Iron Fitlin s Lb 1,390 $4.00 $5,560.00 1,390 44 6" Gale valve and box, includi h rant valve Each 1 $2,000.00 $2,000.00 1 45 H rant Each 1 $5,000.00 $5,000.00 1 46 Watermain Offset Each 2 $1,000.00 $2,000.00 2 47 6" Watermain D.I.P. OL-62 Lin. FL 27 $60.00 $1,620.00 27 $1,620.00 48 8" Watermain D.I.P. CL -52 LIn. Ft. 30 $65.00 $1,950.00 30 $1,950.00 49 Construct Drainage Structure, Design C -1 Each 6 $3,000.00 $18 000.00 5 $15,000.00 1 $3,000.00 50 Construct Drainage Structure, Design E -1 Each 4 $4,000.00 $16.000.00 1 $4,000.00 3 $12.000.00 51 Construct Drainage Structure, Desi n X Each 1 $1,800.00 $1,800.00 1 $1,800.00 52 Construct Drainage SWCture Design Y Each 2 $2,400.00 $4,800.00 2 $4800.00 53 Cason Assembly, Neenah R -1733 Each 10 $750.00 $7,600.00 10 $7,500.00 54 Cason AssemG ,Neenah R- 17280001 -2 Each 1 $750.00 $750.00 1 $750.00 55 Random ri ra CI -II Cu, Yd, 5 $250.00 $1250.00 5 $1250.00 56 4" Concrete walk S . Ft. 6.438 $6.00 $38.628.00 2,363 $14,178.00 4,075 $24,450.00 57 Concrete walk ADA S. Ft. 708 $7.00 $4,956.00 133 $931.00 87 $609.00 488 $3,416.00 58 Concrete curb and utter Design B618 Lin. Ft. 1,118 $15.00 $16,770.00 559 $8,385.00 559 $8,385.00 59 Concrete curb and utter Design 5512 Lin. FL 182 $15.00 $2,730.00 182 $2.730.00 80 Concrete curb and utter ADA Lin, Ft. 189 $17.00 $3,213.00 19 $323.00 15 $255.00 155 $2,635.00 61 6" Concrete drivewa /a ron . Fl. 1,692 $8.00 $13,536.00 639 $5,112.00 1,053 $8,424.00 62 8" Concrete streettalle S . Ft. 386 $10.00 $3,860.00 150 $1,500.00 236 $2,360.00 fi3 8 "Colored Concrete crosswalk S. Ft. 157 $ 12.00 $1,884.00 157 $1,884.00 64 Truncated domes .Ft. 108 $55.00 $5,940.00 12 $660.00 12 $660.00 84 $4,620.00 65 TrafS -enrol Lumv sum 1.00 $5,000.00 $5,000.00 025 $1,236.33 0.35 $1,766.47 0.32 $1,614.60 0.08 $382.60 66 Install handhole Each 2 $750.00 $1,500.00 1 $750.00 1 $750.00 67 Rigid PVC Loop Detector, 6k 6' Each 10 $4,000.00 $40,000.00 5 $20,000.00 5 $20,000.00 68 Splice Loo Detector Each 10 $1,000.00 $10,000.00 5 $5,000.00 5 $5,000.00 69 21C #14 Loop lead -in Lin. Fl. 766 $10.00 $7,560.00 378 $3,780.00 378 $3,780.00 ' 70 Sill Fence Lin. Ft. 250 $10400 $2,500.00 250 $2,500.00 71 Storm drain inlet protection Each 10 $150.00 $1,500.00 5 $750.00 5 $750.00 72 Sad (type Lawn with topsoil S . Yd. 403 $15.00 $6,045.00 197 $2,955.00 91 $1.365.00 115 $1,725.00 73 Pavement M Arrow Preformed tape gr in Each 2 $240.00 $480.00 2 $480.00 74 Pavement Mss Lt Arrow Preformed Laos gr in Each 2 $240.00 $480.00 2 $480.00 75 Pavement M (RI: Arrow Preformed tape gr in Each 1 2 $240.00 $480.00 2 $480.00 76 4" Solid line while - Epoxy Lin. Ft. 1 3,355 $1.00 $3,355.00 760 $760.00 760 $760.00 11835 $1,835600 77 4" Broken line white - E x Lin. Ft. 40 $1.00 $40.00 20 $20.00 20 $20.00 78 4" Double solid line yellow - Epoxy Lin. Ft. 373 $2.00 $746.00 373 $746.00 79 4" Broken line yellow - Epoxy Lin. Ft. 250 $1.00 $250.00 50 $50.00 200 $200.00 80 4" Solid line ellow- Epoxy Lin. FL 533 $1600 $533.00 533 $533.00 81 8" Solid line while - Epoxy LIn. FL 127 $2.00 $254.00 127 $254.00 82 24' Solid line white - Preformed tape or in Lin. FL 60 $40.00 $2.400.00 60 $2,400,00 83 Crosswalk- Preformed tape gr in Lin. Ft. 612 $40.00 $24,480.00 612 $24,480.00 TOTAL PROJECT $855,251.00 5211 473.78 5302155.82 $276,178.22 $65 443.17 EXHIBIT "C" COST - SHARING AGREEMENT FOR PROJECTS CONSTRUCTED IN ANOKA COUNTY USING COUNTY STATE AID FUNDS OR LOCAL TAX LEVY DOLLARS ITEMS COUNTY SHARE CITY SHARE Concrete Curb & Gutter 50% 50% Concrete Curb & Gutter for Median Construction 100% 0% Concrete Median 100% V Concrete Sidewalk 0% 100% Concrete Sidewalk Replacement 100% 0% Bikeways 0% 100% Bikeway Replacement 100 %, 0% Unless existing trail not placed at edge of R/W Construction or Adjustment of Local Utilities 0% 100% Grading, Base and Bituminous 100% 0% Storm Sewer based on state aid letter *2 based on state aid letter *2 Driveway Upgrades 100 %, in -kind 100 %, of up- grades Traffic Signals, new & replacements (communities larger than 5,000) Y2 the cost of its the cost of its legs of w/ State Aid approved SJR legs of the intersection the intersection plus 1/2 the cost of the County legs of the intersection Traffic Signals, new & replacements (communities less than 5,000) 100% 0% w/ State Aid approved SJR Traffic Signal, w/o State Aid approved SJR 0% 100% EVP 0% 100% Engineering Services *3 *3 Right -of -Way 100 %*4 0% Street Lights 0% 100% Noise Walls 100 % *5 0 %R5 *1 The County pays for 100% of Standard Median Design such as plain concrete. If a local unit of government requests decorative median such as brick, stamped concrete, or landscaping, the local unit will pay the additional cost above the cost of standard median. *2 In the event no State Aid is being used, or in the event the state aid letter does not determine cost split percentages, drainage cost shares will be computed by the proportion of contributing flow outside the County right of way to the total contributing flow. *3 Engineering shall be paid by the Lead Agency except that any participating agency will pay construction engineering in the amount of 8% of the construction costs paid by that agency. *4 In the event that the Township or City requests purchase of right -of -way in excess of those right -of -ways required by County construction, the Township or City participates to the extent an agreement can be reached in these properties. For instance, a Township or City may request a sidewalk be constructed alongside a County roadway which would require additional right -of -way, in which case the Township or City may pay for that portion of the right -of -way. Acquisition of right -of -way for new alignments shall be the responsibility of the Township or City in which the alignment is located. This provision may be waived by agreement with the County Board if the roadway replaces an existing alignment and the local unit of government takes jurisdiction of that existing alignment. In addition, any costs, including right -of -way costs, incurred by the County because a Township or City did not acquire sufficient right -of -way during the platting process or redevelopment process as requested by the County shall be paid by the Township or City. *5 If previously notified, the City shall be responsible for future noise wall maintenance. Notification includes any letter to the agency indicating that noise will potentially be an issue in the future, likely received during the Plat Review Process. The County shall pay 100% of Standard Noise Wall Cost. If a local agency requests decorative noise walls, then the requesting agency will pay the additional cost above the cost of standard noise wall. Furthermore, should an agency request a noise wall to be built where not required by the applicable federal or state standard, the entire cost of the wall shall be borne by the requesting agency. W