HomeMy WebLinkAbout2017-28032017 -2803 �'' Document A101 TM -2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the Twenty -Eigth day of July in the year Two Thousan d Seventeen (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status, address and other information) This document has important City of Columbia Heights legal consequences. 637 38th Avenue NE Consultation with an attorney Columbia Heights MN 55421 is encouraged with respect to its completion or modification. for the following Project: (Name, location and detailed description) Circle Terrace Park Community Room and Shelter Columbia Heights, MN All general construction for the building and shelter including mechanical electrical and minor earthwork. The Architect: (Name, legal status, address and other information) I & S Grou , Inc. 7900 International Drive, Suite 550 Minneapolis, MN 55425 Telephone Number: 952.426.0699 The Owner and Contractor agree as follows. Init. AIA Document All 01 T" — 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to t the maximum extent possible under the law. This document was produced by AIA software at 07:56:02 on 07128/2017 under Order No.7953173813 1 which expires on 09/01/2017, and is not for resale. — User Notes: (1699370861) AIA Document A201 TM -2007, General Conditions of the and the Contractor: Contract for Construction, is (Name, legal status, address and other information) adopted in this document by reference. Do not use with other Cobra Construction general conditions unless this 2360 County Road J Suite #100 document is modified. White Bear Lake, MN 55110 Telephone Number: 651.426 4775 Fax Number: 651.426.8 101 for the following Project: (Name, location and detailed description) Circle Terrace Park Community Room and Shelter Columbia Heights, MN All general construction for the building and shelter including mechanical electrical and minor earthwork. The Architect: (Name, legal status, address and other information) I & S Grou , Inc. 7900 International Drive, Suite 550 Minneapolis, MN 55425 Telephone Number: 952.426.0699 The Owner and Contractor agree as follows. Init. AIA Document All 01 T" — 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to t the maximum extent possible under the law. This document was produced by AIA software at 07:56:02 on 07128/2017 under Order No.7953173813 1 which expires on 09/01/2017, and is not for resale. — User Notes: (1699370861) TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insei4 the date ef eemmeneement if it differ-s frem the date ef this A- 5- that the date will be fi3(ed in-&T-e4ee4e-pFeeeed-.) the 0-. sti August 01, 2017 § 3.2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work SPA hater -thanes the date of e t as follows: eeninieneentet Init. —"— " " " """' — cuur. �opyrignt V 191b, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This Ale Document is protected by U.S. Copyright Law and international Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to 2 the maximum extent possible under the law. This document was produced byAlA software at 07:56:02 on 07/28/2017 under Order No.7953173813 1 which expires on 09/01/2017, and is not for resale. — User Notes: (1699370861) subjeet to adjustments of this Contraet T-' The Contractor shall achieve Substantial Completion of the entire Work not later than October 31 2017 ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be Three Hundred Seventy -Five Thousand Eight Hundred Thirty nine Dollars and Zero Cents ($ 375,839.00 ), subject to additions and deductions as provided in the Contract Documents. § 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires.) Alternate No. A -1: $2,000.00 Alternate No. A -2: ($44,688.001 § 4.3 Unit prices, if any: (Identify and state the unit price; state quantity limitations, if any, to which the unit price will be applicable) Item Units and Limitations Price Per Unit ($0.00) Not Applicable § 4.4 Allowances included in the Contract Sum, if any: (Identify allowance and state exclusions, if any, from the allowance price.) Item Price Not Applicable ARTICLE 5 PAYMENTS § 5.1 PROGRESS PAYMENTS § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, as rile m nn th § 5.1.3 Provided that an Application for Payment is received by the Architect not later than the First day of a month, the Owner shall make payment of the certified amount to the Contractor not later than the First day of the following month. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later than Thirty (30 ) days after the Architect receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.) § 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Init. AiA uocument A107 ^ — 2007. Copyright © 1915, 1918, 1925, 19 37, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Al Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to 3 t the maximum extent possible under the law. This document was produced by AA software at 07:56:02 on 07/28/2017 under Order No.7953173813 1 which expires on 09/01/2017, and is not for resale. — User Notes: (1699370861) Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of Five percent ( 5.00 %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Section 7.3.9 of AIA Document A201TM -2007, General Conditions of the Contract for Construction; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of Five percent ( 5.00 .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of AIA Document A201 -2007. § 5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the full amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and unsettled claims; and (Section 9.8.5 of AIA Document A201 -2007 requires release of applicable retainage upon Substantial Completion of Work with consent of surety, if any.) .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of AIA Document A201 -2007. § 5.1.8 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Sections 5.1.6.1 and 5.1.62 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation) Any reduction or limitation of retainage shall be as agreed upon by the Owner. § 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. § 5.2 FINAL PAYMENT § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of AIA Document A201 -2007, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. § 5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment, li„,vs;Payment. Init. AIA Document A101 T — 2007. Copyright © 1915, 1918, 1925, 19 37, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to t the maximum extent possible under the law. This document was produced by AIA software at 07:56:02 on 07/28/2017 under Order No.7953173813 1 which expires on 09/01/2017, and is not for resale. — User Notes: (1699370861) ARTICLE 6 DISPUTE RESOLUTION § 6.1 INITIAL DECISION MAKER The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201 -2007, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. tf other than theArehiteet-.) § 6.2 BINDING DISPUTE RESOLUTION For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A201 -2007, the method of binding dispute resolution shall be as follows: (Check the appropriate box. If the Owner and Contractor do not select a method of binding dispute resolution below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction) ] Arbitration pursuant to Section 15.4 of AIA Document A201 -2007 [ X ] Litigation in a court of competent jurisdiction ] Other (Spec) ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201 -2007. § 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201 -2007. ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A201 -2007 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any) %—One and one-half (1.50 %) Der month § 8.3 The Owner's representative: (Name, address and other information) Kevin Hansen, Director of Public Works, City Eneineer City of Columbia Heights 637 38th Avenue NE Columbia Heights, MN 55421 Email Address: khan sen(a)columbiahei tsmn gov § 8.4 The Contractor's representative: (Name, address and other information) Init. AIA Document A101 T —2007. Copyright © 1915, 1918, 1925, 1® 37, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Ale Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to 5 t the maximum extent possible under the law. This document was produced by AIA software at 07:56:02 on 07/2812017 under Order No.7953173813 1 which expires on 09/01/2017, and is not for resale. — User Notes: (1699370861) Dave Pary Cobra Construction Inc. 2360 County Road J Suite #100 White Bear Lake, MN 55110 Telephone Number: 651.426 4775 Mobile Number: 612.919.7692 Email Address: dparyg cobra- constructioninc com § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. § 8.6 Other provisions: Not Applicable ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. § 9.1.1 The Agreement is this executed AIA Document A101 -2007, Standard Form of Agreement Between Owner and Contractor. § 9.1.2 The General Conditions are AIA Document A201 -2007, General Conditions of the Contract for Construction. § 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Date Pages 007300 Supplementary April 25, 2017 4 Conditions § 9.1.4 The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement) Title of Specifications exhibit: A Section Title Date Pages § 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings exhibit: B Number Title Date § 9.1.6 The Addenda, if any: Number Date Pages 1 May 10, 2017 17 2 May 12,201 4 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Additional documents, if any, forming part of the Contract Documents: [nit. AIA Document A101 TM — 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to t the maximum extent possible under the law. This document was produced by AIA software at 07:56:02 on 07/28/2017 under Order No.7953173813 1 which expires on 09/01/2017, and is not for resale. — User Notes: (1699370861) AIA Document E201TM -2007, Digital Data Protocol Exhibit, if completed by the parties, or the following: Other documents, if any, listed below: (List here any additional documents that are intended to form part of the Contract Documents. AIA Document A201 -2007 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) Table of Contents Sheet Index ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 1 I of AIA Document A201 -2007. (State bonding requirements, if any, and limits of liability for insurance required in Article 11 of AIA Document A201- 2007.) Type of insurance or bond Limit of liability or bond amount ($0.00) Payment and Performance Bonds As per specifications Insurance As per specific /�tio This Agreement entered into as of the day and year. first writen -above. OWNER (Signature) CONTRACTOR Ma or (Printed name an tl OWNER (Signature) City Manager &I . I f �) (Printed name and title) Dave Pary, President (Printed name and title) `— Init. AiA uocumen[ Al u1 m — zoo7. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to 7 t the maximum extent possible under the law. This document was produced by AIA software at 07:56:02 on 07/2812017 under Order No.7953173813 1 which expires on 09/01/2017, and is not for resale. — User Notes: (1699370861) EXHIBIT A SECTION 00 0110 TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS 1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0000 - Spec Book Cover B. 00 0105 - Certifications Page C. 00 0110 - Table of Contents D. 00 1113 -Advertisement for Bids E. 00 2113 - Instructions to Bidders F. 00 3113 - Bidding and Construction Schedule G. 00 4100 - Bid Form H. 00 4545 - Special Instructions for Non - Minnesota Contractors 1. Withholding Fact Sheet 12 - Surety Deposits for Non - Minnesota Construction Contractors 2. Form SDE - Exemption from Surety Deposits for Non - Minnesota Contractors 3. Instruction for Form SDE I. 00 6572 - Construction Contracts with State or Local Government Agencies 1. Withholding Fact Sheet 13 - Construction Contracts with State or Local Government Agencies 2. Form IC 134 - Withholding Affidavit for Contractors 3. Instruction for Form IC134 J. 00 7200 - General Conditions K. 00 7300 - Supplementary Conditions L. 00 7346 - Prevailing Wage Rate Requirements 1. Attachment -- Prevailing Wage Rates SPECIFICATIONS 2.01 DIVISION 01 -- GENERAL REQUIREMENTS A. 01 2000 - Price and Payment Procedures B. 01 3000 - Administrative Requirements 1. Attachment -- Shop Drawing Submittal Form 2. Attachment -- Requirements for Electronically Submitted Shop Drawings C. 01 3510 - Structural Testing and Special Inspection 1. Attachment -- Structural Testing and Special Inspection Program Summary Schedule D. 01 4000 - Quality Requirements E. 01 5000 - Temporary Facilities and Controls F. 01 6000 - Product Requirements 1. Attachment -- Substitution Request Form G. 01 7000 - Execution and Closeout Requirements H. 01 7800 - Closeout Submittals 2.02 DIVISION 02 -- EXISTING CONDITIONS 2.03 DIVISION 03 -- CONCRETE A. 03 3000 - Cast -in -Place Concrete B. 03 3600 - Integrally Colored Concrete 2.04 DIVISION 04 -- MASONRY A. 04 7210 -Manufactured Stone Masonry Veneer 2.05 DIVISION 05 -- METALS 2.06 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES Project No. 16 -19031 Section 00 0110 - Page 1 of 4 Circle Terrace Park Community Room and Park Shelter A. 06 1000 - Rough Carpentry B. 06 1613 - Insulated Sheathing C. 06 1810 - Glue- Laminated Structural Lumber D. 06 1820 - Wood Decking E. 06 2000 - Finish Carpentry F. 06 4100 - Architectural Wood Casework 2.07 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION A. 07 1900 - Water Repellents B. 07 2100 -Thermal Insulation C. 07 4113 - Metal Roof Panels D. 07 4646 - Fiber Cement Siding E. 07 6200 - Sheet Metal Flashing and Trim F. 07 9200 - Joint Sealants 2.08 DIVISION 08 -- OPENINGS A. 08 1113 - Hollow Metal Doors and Frames B. 08 4313 - Aluminum- Framed Storefronts C. 08 5313 - Vinyl Windows D. 08 7100 - Door Hardware E. 08 8000 - Glazing 2.09 DIVISION 09 -- FINISHES A. 09 2116 - Gypsum Board Assemblies B. 09 3000 - Tiling C. 09 5100 - Acoustical Ceilings D. 09 6500 - Resilient Flooring E. 09 7700 - Glassfiber Reinforced Plastic Panels F. 09 9113 - Exterior Painting G. 09 9123 - Interior Painting 2.10 DIVISION 10-- SPECIALTIES A. 10 1400 - Signage B. 10 2113.19 - Plastic Toilet Compartments C. 10 2800 - Toilet, Bath, and Laundry Accessories D. 10 4400 - Fire Protection Specialties 2.11 DIVISION 11 -- EQUIPMENT A. 11 1600 -Vault Equipment 2.12 DIVISION 12 -- FURNISHINGS A. 12 3600 - Countertops 2.13 DIVISION 13 -- SPECIAL CONSTRUCTION 2.14 DIVISION 14 -- CONVEYING EQUIPMENT 2.15 DIVISION 21 -- FIRE SUPPRESSION 2.16 DIVISION 22 -- PLUMBING A. 22 0513 - Common Motor Requirements for Plumbing Equipment B. 22 0523 - General -Duty Valves for Plumbing Piping C. 22 0548 - Vibration and Seismic Controls for Plumbing Piping and Equipment D. 22 0553 - Identification for Plumbing Piping and Equipment Project No. 16 -19031 Section 00 0110 - Page 2 of 4 Circle Terrace Park Community Room and Park Shelter E. 22 0719 - Plumbing Piping Insulation F. 22 1005 - Plumbing Piping G. 22 1006 - Plumbing Piping Specialties H. 22 3000 - Plumbing Equipment I. 22 4000 - Plumbing Fixtures 2.17 DIVISION 23 -- HEATING, VENTILATING, AND AIR- CONDITIONING (HVAC) A. 23 0513 - Common Motor Requirements for HVAC Equipment B. 23 0548 - Vibration and Seismic Controls for HVAC Piping and Equipment C. 23 0553 - Identification for HVAC Piping and Equipment D. 23 0593 - Testing, Adjusting, and Balancing for HVAC E. 23 0713 - Duct Insulation F. 23 0913 - Instrumentation and Control Devices for HVAC G. 23 2300 - Refrigerant Piping H. 23 3100 - HVAC Ducts and Casings I. 23 3300 - Air Duct Accessories J. 23 3423 - HVAC Power Ventilators K. 23 3700 - Air Outlets and Inlets L. 23 8127 - Small Split- System Heating and Cooling 2.18 DIVISION 26 -- ELECTRICAL A. 26 0010 - Basic Electrical Requirements B. 26 0526 - Grounding and Bonding for Electrical Systems C. 26 0529 - Hangers and Supports for Electrical Systems D. 26 0534 - Conduit E. 26 0537 - Boxes F. 26 0553 - Identification for Electrical Systems G. 26 0923 - Lighting Control Devices H. 26 2416 - Panelboards 1. 26 2717 - Equipment Wiring J. 26 2726 - Wiring Devices K. 26 2813 - Fuses L. 26 2818 - Enclosed Switches M. 26 5100 - Interior Lighting N. 26 5600 - Exterior Lighting 2.19 DIVISION 27 -- COMMUNICATIONS 2.20 DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY 2.21 DIVISION 31 -- EARTHWORK A. 31 0000 - General Site Work Requirements B. 31 2200 - Grading C. 31 2316.13 - Trenching D. 31 2319 - Dewatering E. 31 2500 - Erosion and Sediment Control 2.22 DIVISION 32 -- EXTERIOR IMPROVEMENTS A. 32 1123 - Aggregate Base Courses B. 32 1213 - Bituminous Tack Coat Project No. 16 -19031 Section 00 0110 - Page 3 of 4 Circle Terrace Park Community Room and Park Shelter C. 32 1216 - Bituminous Surfacing D. 32 1610 - Concrete Flatwork E. 32 1723 - Pavement Markings F. 32 3113 - Chain Link Fences and Gates G. 32 9219 - Seeding H. 32 9300 - Plants 2.23 DIVISION 33 -- UTILITIES END OF SECTION Project No. 16 -19031 Section 00 0110 - Page 4 of 4 Circle Terrace Park Community Room and Park Shelter EXHIBIT B SHEET INDEX PROJECT: CIRCLE TERRACE PARK COMMUNITY ROOM AND SHELTER PROJECT NUMBER: 16 -19031 GENERAL G1 -11 TITLE SHEET, SHEET INDEX, PROJECT GENERAL NOTES G1 -12 MOUNTING HEIGHTS AND STANDARDS, ABBREVIATIONS AND SYMBOLS ARCHITECTURAL Al -21 FIRST FLOOR PLAN AND REFLECTED CEILING PLAN Al -41 FIRST FLOOR FINISH & WALL FINISH PLANS Al -71 ROOF PLAN A2 -11 EXTERIOR ELEVATIONS A3 -11 BUILDING SECTIONS A6 -11 INTERIOR ELEVATIONS STRUCTURAL S1 -00 STRUCTURAL NOTES S1 -10 STRUCTURAL NOTES S1 -11 FOOTING AND FOUNDATION PLAN S1 -12 CONTROL JOINT AND FLOOR SLAB PLAN S1 -21 FOOTING AND FOUNDATION DETAILS S1 -51 ROOF FRAMING PLAN S1 -61 ROOF FRAMING DETAILS MECHANICAL M1 -21 HVAC FLOOR PLAN M1 -31 MECHANICAL DETAILS & SCHEDULES P1 -21 WASTE & VENT FLOOR PLAN P1 -22 POTABLE WATER & GAS FLOOR PLAN P1 -31 ISOMETRIC DIAGRAMS P1 -32 PLUMBING DETAILS & SCHEDULES ELECTRICAL E2 -11 FIRST FLOOR POWER PLAN E3 -11 FIRST FLOOR LIGHTING PLAN E5 -11 ELECTRICAL SCHEDULES AND DETAILS