Loading...
HomeMy WebLinkAbout2017-2772ME APFAM J.N. Johnson Fire & Safety A Division of '• Company Address 4200 West 76th Street Minneapolis, MN 55435 -5108 Phone (952) 835 -4600 Fax (952) 835 -4153 Account Information Account Name Columbia Heights Top Valu Liquor #2 Created Date 1/10/2017 Quote Number 00003449 Project Code 161191 -14856 Inspection Proposal Service Location Ship To Name Columbia Heights Top Valu Liquor #2 Bill To Name Columbia Heights Fire Dept Ship To 2015 37th Ave NE Bill To 825 41st Ave NE Columbia Heights, MN Columbia Heights, MN Direct Dial (763) 706 -8152 Phone (763) 706 -8150 Email ggorman @columbiaheightsmn.gov Scope Of Work Opportunity Name 2016.11 FA SPRK EL Al - Columbia Heights Top Valu Liquor #2 Description LVC will provide the following life safety system inspections according to the MN State Fire Alarm and Suppression Contract # 56031, Release # F- 547(5). Site Contact: Gary Gorman Fire Chief ( 763 - 706 -8150 j ggorman @columbiaheightsmn.gov - Eric Hanson: Facility Supervisor 763 -706 -3725 1 ehanson2 @columbiaheightsmn.gov Scope Of Work: - Annual Fire Alarm System Inspection - Annual Sprinkler System Inspection - Annual Emergency Lighting Inspection Fire Alarm System: - Silent Knight 5104 Panel - 1 Waterflow switch - 2 Supervisory Switch - All A/V appliances - All batteries Sprinkler System: - 1 Wet Piped system Emergency Lighting System: - 7 EL &PE R -51-10 Lights Project Specifics: LVC Fire Alarm Division will supply up to 2 hours of labor. LVC Sprinkler Divisions will supply up to 2 hours of labor. Annual Emergency Light Inspection - 90 minute load test will be performed. - Inspection will be completed during normal business hours Monday - Friday. A thorough system review will be performed using individual point testing procedures. - Facility personnel will provide uninterrupted access to equipment needing inspection. Alarm control panels will be checked for line voltages, battery voltage under normal and alarm activation conditions, ground fault tolerance, and supervision of all data loops. JX Johnson Fire &Safety A Division of tDi - All alarm notifications will be verified to ensure proper response - Perform sprinkler system main drain tests. - Reports of inspection will be provided electronically within 30 days of inspection completion. - Deficient findings will be identified and corrective action proposals will be provided for approval. Excluded: - Sales Tax, permits, fees - Overtime labor - Service labor and / or equipment - Testing of underground water supply - Personnel lift equipment Quote Line Items Inspection Proposal Labor - Sprinkler System Investment Subtotal $541.62 Discount 0.00 %a Total Price $541.62 Signatures Jim Oelhafen Approved By: Service Sales Representative` 952 - 278 -1075 Direct 952 - 292 -1017 Cell Printed Name: Walt Fehst joelhafen @lvcinc.com Title: City Manager Date: January 13, 2017