HomeMy WebLinkAbout11-09-2015 Work Session
Mayor
Gary L. Peterson
Councilmembers
Robert A. Williams
Bruce Nawrocki
Donna Schmitt
John Murzyn, Jr.
City Manager
Walter R. Fehst
City of Columbia Heights
590 40th Avenue NE, Columbia Heights, MN 55421-3878 (763) 706-3600 TDD (763) 706-3692
Visit our website at: www.columbiaheightsmn.gov
The City of Columbia Heights does not discriminate on the basis of disability in the admission or access to, or treatment or
employment in, its services, programs, or activities. Upon request, accommodat ion will be provided to allow individuals with
disabilities to participate in all City of Columbia Heights' services, programs, and activities. Auxiliary aids for disabled persons are
available upon request when the request is made at least 96 hours in advance. Please call the City Clerk at 763-706-3611 to
make arrangements. (TDD/763-706-3692 for deaf or hearing impaired only.)
NOTICE OF
WORK SESSION
Meeting of: Columbia Heights City Council
Date of Meeting: November 9, 2015
Time of Meeting: 6:15 PM
Location of Meeting: City Hall-Conference Room No. 1
Purpose of Meeting: Worksession
1. Review of the Stinson Blvd reconstruction and utilities – joint project with
the City of St. Anthony.
AGENDA SECTION WORK SESSION
ITEM NO.
MEETING DATE NOVEMBER 9, 2015
CITY OF COLUMBIA HEIGHTS - COUNCIL LETTER
ITEM: REVIEW OF THE STINSON BOULEVARD RECONSTRUCTION PROJECT, FROM 37th to 40th AVENUES
DEPARTMENT: Public Works CITY MANAGER’S APPROVAL:
BY/DATE: Kevin Hansen / November 5, 2015 BY/DATE:
BACKGROUND:
A cooperative agreement was approved on June 22nd with the City of St. Anthony for street and utility
improvements on Stinson Boulevard from 37th Avenue to north of 40th Avenue. This section of Stinson
Boulevard is the municipal boundary between the two cities. The scope of work would involve replacing the
concrete street with a bituminous section along with utility improvements in each city, proposed for 2016
construction.
Preliminary layout plans have been prepared and will be presented to the Council for review. These consist of:
Street Reconstruction
Stinson Boulevard from 37th Avenue NE to Silver Lane NE
37th Place NE from Stinson Boulevard to 37th Avenue NE (Optional)
Trail on 37th Place NE from Stinson Boulevard to 37th Avenue NE
Utility Reconstruction
Watermain: Stinson Boulevard from 37th Avenue NE to north of 40th Avenue
Sanitary Sewer: Lining under separate project
Sewer forcemain replacement
Storm Sewer System: Complete replacement
Trail and Sidewalk Improvements
8’ bituminous trail along west side of Stinson Boulevard between 37th Place NE and 40th
Avenue NE
Railroad Crossing Improvements
Replace existing crossing on Stinson Boulevard located between 37th Avenue NE and 37th
Place NE
Decorative Lighting
West side of Stinson Boulevard between 37th Avenue NE and 40th Avenue NE
RECOMMENDED MOTION:
None – review / discussion item
ATTACHMENT(S): Area map
Proposed street cross section
X
X
X
X
X
X
X
2401
2405
2504400139193917391539133911
2400
2402
2404
38033801372537012400
2
3
0
1
2
2
0
1
2301 3746 3806 3816 3826 3836 3850 3900
2323
2315
4000
4004
Soo Line Railroad Co
Soo Line Railroad Co
2
1
0
5
3900
2503
3642
X
X
K:\02170-130\Cad\Exhibits\fig-01.dgn
WSB Project No. 02170-130 Date: September 2015
WSB
& Associates, Inc.
St. Paul, MN 55101
INFRASTRUCTURE ENGINEERING PLANNING CONSTRUCTION
477 Temperance Street
763-541-4800 - Fax 763-541-1700
www.wsbeng.com
Columbia Heights, Minnesota
for the City of
2016 Street & Utility Improvements
DA
V
E
& R
O
N
’S
IN
C
MARK R
P
E
T
E
R
S
O
N
R
O
O
S
E
VE
L
T
P
R
O
P
E
R
TIE
S
LL
C
D
G
E
E
R
& A G
E
E
R
D E
KA
H
LE
& D LE
A-KA
H
LE
J
oy
ce
Fra
in
Kay A D
e
ss
le
r
M
a
rth
a
Dz
ub
ak
B
ra
d
ley C
S
m
it
h
W
il
l
i
a
m
C
B
a
rke
r
Marc
u
s
K
D
ra
yto
n
A
lvin
M T
rus
t Berg
S
haron
L P
la
nte
n
b
e
rg
D
e
lo
ris B S
a
les
s
D
E
KA
H
LE
& D LE
A-KA
H
LE
Kim
b
e
rly J D
w
ornick
Ma
rle
n
e
J
S
chiena
Marga
re
t M Kenn
e
d
y
J
e
s
s
ic
a
L As
ia
la
P
a
tricia
A How
e
llEli
za
b
e
th J
B
la
ke
R
e
n
a
ye
S
W
a
gn
e
rD
o
n
a
ld
A C
hristop
h
e
rs
on
3
7
t
h
A
v
e
n
u
e
N
E
S
il
v
e
r
L
a
n
e
N
E
3
9
t
h
A
v
e
n
u
e
N
E
3
8
t
h
A
v
e
n
u
e
N
E
40 th A v e nu e N E
3
7
t
h
Pl
a
c
e
N
(City of Columbia Heights)
8’ bituminous trail
(by others)
Future 6’ concrete sidewalk
McKinley Street NE
0 15075
TYPICAL STREET SECTION
13' Dri v i ng Lone Lone 13' Dr i ving Lane
DRAIN Tf.L E
<TYPICA t>
BOTH SIDE S
8618 CURB &
-2.0 % 2.0 %-
6" MIN. TOPSOIL AND TURF __ ___,
ESTABLISHMENT ALL
DISTURBED AREAS
CUNLESS OTHERWISE NOTED>
ll/2" TYPE SP 12.5 BITUMINOUS WEARING COURSE MIXTURE
C2,Cl SPWEB240C CPG 58-34>
,_____ 235 7 BITUMINOUS TACK COAT
4" TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE
~--C2,Cl SPNWB240C CPG 58-34> CPAVED IN 2 LIFTS>
~---8" AGGREGATE BASE, CLASS 5 OR CLASS 7
'------18" SELECT GRANULAR BORROW
'----------GEOTEXTILE FABRIC CMn/DOT 3733, TYPE Vl
'-------24' SUBGRADE PREPARATION CSCARIFY AND RECOMPACTl
...
WSB
477 Temperance Street
St. Paul , MN 55101
www.wsbeng .com
_____ ,,, __ 763-541 -4800 -F ax 763-541 -1700
INFRASTRUCTURE •ENGINEERING ~LA NNING aO NSTRUCTION
K:\02170-130\Cod\Exhib its\ Typical Sectlon_dgn
Typical Section
2016 Street & Utility Improvements
for the City of
St. Anthony Village, Minnesota
WS B Project No . 02170-130 Date : August 24 , 2015
Figure 8