HomeMy WebLinkAboutResolution No. 2014-88RESOLUTION 2014 -88
BEING A RESOLUTION ORDERING IMPROVEMENTS AND
PREPARATION OF PLANS FOR ZONE 1 STREET REHABILITIATION
CITY PROJECT 1502
WHEREAS, Resolution 2014 -80 of the Columbia Heights City Council adopted the 10`x' day of November, 2014,
fixed a date for a Council hearing on the iproposed improvement bounded by Central Avenue on the west, Reservoir
Boulevard /Johnson Street on the east, 37t' Avenue on the south, and 47th Avenue on the north, together with 4"'
Street from 40th Avenue to 42nd Avenue.
AND WHEREAS, ten days' mailed notice and two published notices of the hearing a week apart were given, and
the hearing was held thereon the I" day of December, 2014, at which all persons desiring to be heard were given an
opportunity to be heard thereon.
WHEREAS, the Council determines to proceed with this local improvement, a portion of the cost being defrayed by
special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA HEIGHTS,
MINNESOTA:
That the location and extent of such improvements is as follows:
FULL STREET RECONSTRUCTION
4th Street, 40th Avenue to 42nd Avenue
Work includes required utility reconstruction /repair, new granular sub -base if needed, new aggregate
base, new concrete curb and gutter with driveway aprons, new bituminous surfacing, required concrete
or bituminous driveway and walk /step replacement, sod restoration, miscellaneous construction iterns,
and appurtenances.
STREET MILL AND OVERLAY
41St Avenue, Central Avenue to Cul -de -sac
Work includes required utility reconstruction /repair, spot replacement of curb and gutter with required
concrete or bituminous driveway and walk /step replacement, milling of existing street surface, new
bituminous surfacing, sod restoration, miscellaneous construction items, and appurtenances.
2. Such improvement is necessary, cost - effective, and feasible as detailed in the feasibility report.
3. Such improvement is hereby ordered as proposed in the Council Resolution adopted thelOth day of
November, 2014.
4. These improvements shall also be known as Project 1502 and PIRs:
2015 -Z1 -02 -001 for Full Street Reconstruction, and
2015 -ZI -44 -001 for Street Mill and Overlay.
5. The City Engineer, Kevin Hansen, is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such improvement.
Passed this I" day of December, 2014.
Offered by: Williams
Seconded by: Diehm
Roll Call: All yes
Katie Bruno
City Clerk