HomeMy WebLinkAboutContract No. 2015-2642MISSISSIPPI WATERSHED MANAGEMENT ORGANIZATION CAPITAL PROJECT AGREEMENT MWMO Agreement # 2011513 Columbia Heights Document # Project Title: LaBelle Park Water Quality Improvement Project Amount: $250,000.00 (not to exceed) Grantee: City of Columbia Heights Address: 637 — 38th Ave. NE, Columbia Heights, MN 55421 -3835 Contact: Kevin Hansen Public Works Director Phone Number: 763 - 706 -3705 Email Address: kevin. hansenna ,ci.columbia- heights.mn.us THIS AGREEMENT is between the Mississippi Watershed Management Organization (N -1WMO) and the City of Columbia Heights (Grantee). I. BACKGROUND 1.1 Minnesota Statutes Sections 103B.201 to 103B.252 establish the Metropolitan Area Watershed Management Act and related Water Resources Protection and Management Programs ( "the Act "). 1.2 MWMO desires to conduct programs and projects to meet statutory and rule requirements for implementing a comprehensive watershed management plan. 1.3 Grantee is a political subdivision and local government unit of Minnesota with the powers provided in Minnesota Statutes Chapter 398A and as may otherwise be provided. 1.4 Grantee is eligible to obtain MWMO funds to accelerate implementation of MWMO's Plan, Goals, and Policies. 1.5 MWMO has approved Grantee to receive funding to implement a project within MWMO boundaries. Capit -d Project.hrecment #'-01 1513 P a g e ( 1 LaBelle Park Water Quahty Improvement Project 4/2/15 II. DUTIES AND CONDITIONS 2.1 MWMO will grant to Grantee up to the maximum amount stated above, which funds may be used only for expenses incurred in performing work ( "Project ") specified in Attachment One of this Agreement, which is incorporated by reference, or as approved in writing by MWMO staff. All other expenses and costs incurred by Grantee in completing the Project will be the responsibility of Grantee. Administrative costs incurred by Grantee including, but not limited to, compensation and benefits of Grantee staff, are not eligible for reimbursement under this Agreement. 2.2 Grantee will act in all respects as an independent contractor under this Agreement. MWMO will not be an employer, partner, or co- venturer with Grantee for any purpose and will have no responsibility or liability for the acts or omissions of Grantee. Nothing in this Agreement authorizes Grantee to act as an agent or representative of MWMO for any purpose. 2.3 Prior to commencing the Project, Grantee will obtain written, executed easement agreements from pertinent property owners, if any, impacted by the Project. 2.4 Grantee will submit progress reports to MWMO every- six (6) months on the status of the Project. A final report is due to MWMO within ninety (90) days after the completing of the Project or the end of the term of this Agreement, whichever occurs first. A final report must be submitted to the MWN-IO using the MW`MO Report Form. Outstanding reimbursement requests and the correlating financial information must be submitted with the final report in order to receive the final payment under this Agreement. The final report shall include as -built plan sheets for grading, plantings, and stormwater management best management practices. III. TERMS OF PAYMENT 3.1 MWMO will disburse funds to Grantee on a reimbursement basis. Grantee's payment requests must be accompanied by supporting invoices or documentation that relate to activities in the approved Project. Subject to MWMO's approval of the payment request, MWMO will disburse the requested amount to Grantee within three (3) weeks after receipt of a written payment request. All work performed under this Agreement will be performed in accordance with all applicable federal, state, and local laws, including any amendments thereto. 3.2 Reimbursements Grantee should use MW'MO's Reimbursement Request Form to request reimbursements. A copy of all relevant invoices must be submitted with the Reimbursement Request Form. Expenses incurred on or after the date of this Agreement are eligible for reimbursement. Administrative costs incurred by Grantee including, but not limited to, compensation and benefits of Grantee staff, are not eligible for reimbursement under this Agreement. IV. TERM OF AGREEMENT This Agreement will be effective when all necessary approvals and signatures have been obtained and will Capital Projcct _1 ,grecmcot # 20115'13 P a g e 1 2 LaBelle Park Water Quality lmprovrment Projcct 4/2/15 terminate on December 31, 2015, or the date when all obligations have been satisfactorily fulfilled by both parties, whichever occurs first. MWMO will not be obligated to reimburse any expenses incurred after the end of the Agreement or to pay any payment requests more than ninety (90) days after the end of the Agreement. V. CANCELLATION Either party may cancel this Agreement upon thirty (30) days' advance written notice to the other party. Grantee will be entitled to reimbursement of eligible expenses appropriately incurred or obligated in compliance with this Agreement up to the date of termination. VI. ASSIGNMENT Grantee will not assign or transfer any rights or obligations under this Agreement without the prior written consent of MWMO. Grantee may contract with others to complete the Project. However, Grantee will continue to be responsible for performance of its obligations under this Agreement notwithstanding contracts with contractors or subcontractors or an approved assignment to a sub - grantee. VII. AMENDMENTS Any amendments to this Agreement must be in writing and executed by both parties. Amendments to the Project work plan or budget must be in writing and formally approved by the MWMO Executive Director or his designee before the amendments are effective. VIII. INDEMNIFICATION Grantee agrees to defend, indemnify, and hold harmless MWMO, its officials, officers, agents, and employees from any liability, claims, counterclaims, causes of action, judgments, damages, losses, costs, or expenses, including reasonable attorney's fees (hereinafter "Claim "), resulting from any act or omission of Grantee, its contractors or subcontractors or any party directly or indirectly employed by them or any party that directly or indirectly benefits from the activities specified in this Agreement, or anyone for whose acts or omissions they may be liable in the performance of the activities specified in this Agreement and against all loss by reason of the failure of Grantee to perform fully, in any respect, all obligations under this Agreement. Provided, however, that in no event shall Grantee's responsibility or liability under this paragraph exceed Grantee's responsibility or liability if any such Claim were made against Grantee, and Grantee explicitly reserves, and does not waive, all protections, limits, defenses or immunities available under Minnesota Statutes Chapter 466 or any other applicable state or federal law or doctrine. In the event that M`WM0 learns that a Claim has been made or may be made for which MWMO will seek or is likely to seek defense or indemnification from Grantee or will likely request that Grantee hold MWMO harmless, MVVMO agrees to promptly notify Grantee of such Claim and cooperate with Grantee in the defense of such Claim. IX. INSURANCE Grantee agrees at all times during the term of this Agreement and beyond, when so required, to have and Capital Project Agrecmcut # 2011513 P a g e 1 3 LaBelle Park Water Quality lmproveinent Project 4 /2/15 keep or cause to have and be kept in force, and to cause all contractors and subcontractors to do likewise, the following minimum insurance coverages under either a purchased insurance or self- insurance program: A. Commercial General Liability on an occurrence basis with Contractual Liability Coverage: General Aggregate $1,500,000 Products - Completed Operations Aggregate $1,500,000 Personal and Advertising Injury $1,500,000 Each Occurrence — Combined Bodily Injury and Property Damage $1,500,000 B. Automobile Liability — Combined single limit each $1,500,000 occurrence for bodily injury and property damage covering owned, non - owned, and hired automobiles. G Workers' Compensation and Employer's Liability: i. Workers' Compensation Statutory If the contractor is based outside the State of Minnesota, coverage must apply to Minnesota laws. ii. Employer's Liability. Bodily Injury by: Accident — Each accident $100,000 Disease — Policy Limit $500,000 Disease — Each Employee $100,000 D. Professional Liability (if applicable) — Per Claim $1,000,000 -- Aggregate $2,000,000 The required limits for any self — insurance program of the Grantee shall be the lesser of the limits shown above or the liability limits of the Grantee under Minnesota Statutes Chapter 466. Any applicable professional liability insurance must be maintained continuously for a period of two years after the termination of this Agreement. The Grantee will require that any contractors furnish certificates of insurance to the Grantee for the insurance coverages listed above, and provide updated certificates as coverages expire, The Grantee will require that any contractors obtain certificates of insurance from their subcontractors for the insurance coverages listed above, and obtain updated certificates as coverages expire. An umbrella or excess policy over primary liability coverages may be used to provide the required insurance limits. It is the sole responsibility of the Grantee to determine the need for and to procure Capital Project Agrecmcut ? 2011513 1' a g e 1 4 LaBelle Park Watcr QuabtY Improv,ment Project 4/2/15 additional insurance that may be needed in connection with this Agreement, Copies of insurance certificates or statements of self itisurance will be submitted to tine lPoMINK") upon written request. X, AU. tai i N'TING AND RU'CORI)-KEEPING For all expendirtttvs of funds made pursuant to this Agreement, Grantee -will keep financial records, including, properly executed contracts, invoices, and other docurnents that detail the nature and propriety of the expenditures, Accounting methods krill be in accordance with gencrallyaccepted accounting principles. Grantee agrees that MWMO, the State Auditor, or any" of their duly authorized representatives, at any- time during normal business hours, and as often as they may reasonable= deem necessary, shall have access to and tire right to examine, audit, excerpt, copy, and transcribe anti= books, documents, papers, records, I etc., that are pertinent to the accounting practice,,; and procedures of Grantee and involve transaction,, relating to i:his Agreement, These matcrials shall be ma-Urtairicd and access rights will be in fi-)rcc and effect during the period of this Ap, -cement and for six (6) years after its termination or cancellation, XL REAL PROPERTY 1 f real property is acquired or improved with grant funds, MWATO rnay require the recording of covenants or restrictions on the use, maintenance, and development of the property as MWN10 deems necessary and appropriate to assure the Project's continuing public benefit. XIL NON D ISCR11MINATION Grantee agrees and will require contractors and subcontractors, material suppliers, and vendors to 1gree not to discriminate in hiring by reason of race, creed, or color or otherwise violate the provisions of MiIIIICSOM SUILLUCS §18139, Which section is incorporated by reference. X111. EXI-11BIT Exhibit A to this Agreement is hereby made a part hereof. To the extent of any inconsistency bemeen this Agreement and Exhibit A, 1,"rxliibit A will control. t-tpitai Veowct Agfc4,wwut P 24 1 iiI3 P A t, C 1 "I"idic J",Ik Wialcx Qllahl) faqlv" ( 111cat ict'ajae I ! IN WITNE—SS 1\TIEREOF, the parties have caused this Agreement to be dull' executed ititencling to be bound thereby. City Manager Its: Date: For the Mississippi Watershed Management Organization: By: IM Chair Date: By: Its: Date- Attachments: 1. Exhibit A (2pgs) 1 Eligible Cost Spreadsheet, prepared by \X"SB Associates (2 pg-s) I Figures, prepared by V'SBAssociates (4 pg-,) f :,lpilal Pf, C t 1 tit 2011,; t "s 'p, t 1 i\ 11 1,1 Qkl3iM orate-'1c ,GQQW 1"n "1 1 MISSISSIPPI WATERSHED MANAGEMENT ORGANIZATION AGREEMENT Exhibit A to MWMO Capital Project Agreement #2011513 City of Columbia Heights Document # Project Title: LaBelle Park Water Quality Improvement Project 1. Project Description and Purpose LaBelle Park is located east of Central Avenue between 42nd and 40th Avenue NE in the City of Columbia Heights. The Park includes LaBelle Pond, Department of Natural Resources (DNR) public water, identification number 687P. A portion of the LaBelle Pond shoreline was previously constructed using timber walls. This wall and associated boardwalk have become unstable, creating safety hazards as well as erosion issues for the Pond. Very little water quality treatment takes place upstream of LaBelle Pond, which discharges to Jackson Pond, which in turn discharges to the Mississippi River. The City of Columbia Heights determined that removing the timber walls and stabilization is necessary for the shoreline. In order to treat water before it runs into LaBelle Pond, two bioretention basins will be created: a. North Pond — This bioretention basin with underdrain will be constructed near the existing parking lot near 42nd Avenue NE and Fillmore Street NE. The existing catch basin in the parking lot will be rerouted to the basin to pre -treat 0.4 acres of runoff, 0.3 acres of which is impervious. A sump manhole will provide pretreatment for coarse sediments prior to flow through the basin. The project Feasibility Study estimated the following removals (1.17 ", 24 -hour event): i. 64.4 % total phosphorus ii. 89.7% total suspended solids b. West Pond — This bioretention basin with underdrain will be constructed near the existing parking lot at the end of 41St Avenue NE. The drainage area from the parking lot and cul -de -sac totals 1.6 acres,. 1.3 acres of impervious surface. The existing 24 -inch storm sewer pipe will be re- routed to allow for pre - treatment within the West Pond prior to flow into LaBelle Pond. The project Feasibility Study estimated the following removals (1.17 ", 24 -hour event): i. 67.5% total phosphorus ii. 91.7% total suspended solids Approximately 520 -feet of shoreline will be restored for LaBelle Pond in the vicinity of the new West Pond bioretention basin. This restoration will include removal of the existing timber wall, establishment of 3:1 side slopes, boulder shoreline treatment, and planting with native perennials and shrubs. This capital improvement project is listed as two separate projects "LaBelle Park Water Quality Improvements and Flood Protection Project" and "LaBelle Park Shoreline Restoration, Water Quality and Habitat Improvements project" in the MWMO's Capital Improvement Project schedule. Capital Project AgrecmcHtt # 2011513 p a g e 1 7 LaBelle Park Water Quality ltnprovcmeiat Project 4/2/15 Exhibits showing the project location are attached and made part of this Agreement. 2. Scope of Work Description of Tasks a. Design, install, oversee, and complete the shoreline restoration, water quality and habitat improvements at LaBelle Park. 3. Schedule of Work — Description of work Estimated Completion Site Protection and removals Aril 2015 Utilities, excavation, and grading Aril 2015 Boulder shoreline wall, paying May 2015 Landscape plantings June 2015 Substantial completion June 2015 4. Deliverables The deliverables listed below are required in lieu of Final Report as described in 2.4 of the Agreement. a. Final Construction Documents b. As -built Drawings for bioretention basins, plantings, and shoreline restoration c. Pre- construction, during construction, and post - construction photos d. Copies of, or digital links to, press releases or other communications related to the Project e. Grantee will provide NIWMO Staff with regular project updates throughout contract period and participate in Project close out activities. Project updates should include, at minimum, construction start and end, and installation or construction of key components funded through this agreement. i. Construction start ii. Shoreline restoration construction iii. Bioretention construction iv. Planting V. Construction end 5. Project Budget a. Project components designated as MWMO eligible expenditures are summarized in the attached spreadsheet, which is made part of this Agreement by reference. The quantities and unit costs summarized are based on actual Project construction bids. Capital Project agreement t 2-091513 1' a L; ° 1 8 LaBelle Park Water Qualiti Improvement Projcct 4/2/15 MWMO FUNDING AGREEMENT Units Legend: LS =Lump Sum, SF= Square Feet, SY = Square Yard, EA =Each, LB = Pound, PAIR = Pair, LF = Lineal Feet, FSF = Facial Square Feet, CY = Cubic Yard, TN = Ton, GAL = Gallon Base Bid Schedule CITY OF COLUMBIA HEIGHTS, MN S: \Projects \CIP 15_LaBelle Pond \Detiverables\20150401 -MWMO MOU bid sheet—costs WSB PROJECT NO. 01792 -110 Page -1 of 2 No. Section 1 - Removals, Earthwork, and Erosion Control Estimated Unit Unit Bid Total Bid MW—MO, Grant t . In Dollars In Dollars Eligible S$ 1 Mobilization 1 LS $20,000.00 $20,000.00 $17,000.0 2 Removal and disposal of all Trees and Vegetation as indicated on plans, details and specifications - complete, including rootball 1 LS $7,500.00 $7,500.00 $7,500.00 Removal and disposal of existing Concrete Plaza as indicated on plans - 3 complete, including removal of all concrete and asphalt pavement, pads, base materials beneath the pavements, etc. - Contractor shall saw cut edges of 1200 SY $10.00 $12,000.00 $0.00 pavement for removals as necessary Removal and disposal of existing Bituminous Court, Fencing, and Goals as 4 indicated on plans - complete, including removal of all asphalt pavement, base 660 SY $9.00 $5,940.00 $0.00 materials beneath the pavements, fencing, goals, associated footings, etc. Removal and disposal of existing Pavement and Trails as indicated on plans - 5 complete, including removal of all concrete and asphalt trails, pads, parking areas, base materials beneath the pavements, etc. - Contractor shall saw cut edges of 675 SY $8.00 $5,400.00 $5,400.00 pavement for removal as necessary Furnish and place Infiltration Basin Soil Mixture - complete, as per plans, 7 details and specifications including 60% select granular borrow, 20% topsoil and 78 CY $40.00 $3,120.00 $3,120.00 20% compost. On -site Earthwork - complete, including: 1) stripping, stockpiling, respreading, and fine grading all topsoil to required minimum settled depth; 2) common excavation and placement of all soil and subsoil materials to subgrade elevations in all work areas; 3) subsoil compaction beneath trails, concrete, pavements, etc.; 8 4) grade maintenance as necessary for duration ofconstruction period; 5) 1 LS $20,000.00 $20,000.00 $17,500.00 temporary erosion control measures as noted on plan sheets / NPDES permits required to prevent migration of soils to down -slope locations, including maintenance during construction period - NOTE: this item does not include erosion control silt fencing or permanent erosion control mat/blanket. Remove & Export Common Borrow / Unsuitable Soils - complete, including 9 loading, transporting, and unloading off -site. Payment shall be based on actual quantity (CY loose volume) of material imported. Quantity must be verified and 1800 CY $28.00 $50,400.00 $50,400.00 approved by the Owner prior to hauling material off -site. 10 Removal and disposal of existing Sheet Piles as indicated on plans - complete, including sheet piles, fasteners, etc. 450 LF $30.00 $13,500.00 $13,500.00 Removal and disposal ofexisting Timber Boardwalk, walls, and Trellis at 11 Plaza Area as indicated on plans - complete, including timber, fasteners, footings, I LS $17,500.00 $17,500.00 $17,500.00 etc. 12 Removal and disposal of existing Sculpture as indicated on plans - complete, including sculpture, footings, etc. 1 LS $2,500.00 $2,500.00 $0.00 13 Furnish and install Boulder Shoreline Edge Treatment - complete, as indicated on plans, details and specifications 400 FF $35.00 $14,000.00 $14,000.00 14 Furnish, install, and maintain Erosion Control Fencing as indicated on plans, includes removal and restoration at project completion - complete 950 LF $2.50 $2,375.00 $2,375.00 15 Furnish, install, and maintain Catch Basin Inlet Protection as indicated on plans, includes removal at project completion - complete 2 EA $150.00 $300.00 $300.00 16 Furnish, install, and maintain Floating Silt Curtain as indicated on plans, includes removal at project completion - complete 460 LF $3.00 $1,380.00 $1,380.00 17 Furnish, install, and maintain Tree Protection Fence as indicated on plans, includes removal at project completion - complete 200 LF $5.00 $1,000.00 $1,000.00 18 Furnish and install 15'X 50' Aggregate Construction Access - complete, including removal and restoration at project com letion 1 EA $2,000.00 $2,000.00 $2,000.00 Section 1 Subtotal:1 $178,915.001 $153,605.00 No. Section 2 - Utilities Estimated Unit Unit Bid Total Bid Total Bid !2t L. In Dollars In Dollars In Dollars 19 Furnish and install 48" Diameter Manhole - complete, as indicated on plans, details andspecifications 6 LF $5,000.00 $30,000.00 $30,000.00 20 Furnish and install 6" HDPE - complete, as indicated on plans, details and specifications 150 LF $25.00 $3,750.00 $3,750.00 CITY OF COLUMBIA HEIGHTS, MN S: \Projects \CIP 15_LaBelle Pond \Detiverables\20150401 -MWMO MOU bid sheet—costs WSB PROJECT NO. 01792 -110 Page -1 of 2 Total Stormwater, Shoreline Restoration and Plant Materialsil $281,047.001 $255,4370 LABELLE PARK IMPROVEMENT PROJECT CITY OF COLUMBIA HEIGHTS, MN S:\Projects\CIP_15_LaBe11e Pond \Deliverables\20150401 -MWMO MOU bid sheet costs WSB PROJECT NO. 01792 -110 Page - 2 of 2 Furnish and install 6" HDPE Pipe Apron With Trash Guard - complete, as I EA $350.00 $350.00 $350.00 21 indicated on plans, details andspecifications No. Section 5 - Plant Materials 2t j. Unit In Dollars 22 Furnish and install Area Intake - complete, as indicated on plans, details and 3 EA $800.00 $2,400.00 $2,400.00 $3,200.00 s ecifications specifications - complete, including two months maintenance 23 1complete, Furnish all labor and materials for Constructing Manhole over Existing Pipe - 2 EA $2,000.00 $4,000.00 $4,000.00 $3,250.00 as indicated on plans, details andspecifications 41 specifications - complete, including two months maintenance 24 Furnish and install 18" RCP Sewer Design 3006 Class IH - complete, as 166 LF $60.00 $9,960.00 $9,960.00 indicated on plans, details andspecifications 42 Furnish and install wood fiber blanket as indicated on plans - complete 5810 SY $2.50 25 Ion Furnish and install 24" RCP Apron With Trash Guard - complete, as indicated I EA $3,200.00 $3,200.00 $3,200.00 $6,500.00 olans, details andspecifications 43 specifications - complete, including hardwood mulch 26 Furnish all labor and materials for Removal of Existing 24" RCP - complete, as 16 LF $18.00 $288.00 $288.00 $500.00 indicated on plans, details andspecifications 44 specifications - complete, including hardwood mulch 27 Idetails Furnish and install 4" Perf. PE Pipe Drain - complete, as indicated on plans, 108 LF $8.00 $864.00 $864.00 $4,615.00 andspecifications 45 specifications - complete, including hardwood mulch 28 Furnish and install 15" RCP Dewer Design 3006 Class III - complete, as 69 LF $50.00 $3,450.00 $3,450.00 $580.00 indicated on plans, details andspecifications 46 specifications - complete, including hardwood mulch 29 Furnish and install Random Riprap Class III - complete, as indicated on plans, 24 CY $100.00 $2,400.00 $2,400.00 $300.00 details ands ecifications 47 specifications 30 and install 18" RCP Apron With Trash Guard - complete, as indicated I EA $3,000.00 $3,000.00 $3,000.00 on plans, details ands specifications LFurnish 31 Furnish and install 15" RCP Apron With Trash Guard - complete, as indicated 1 EA $2,500.00 $2,500.00 $2,500.00 on n1anq details and ecifications Section 2 Subtotal:j $68,662.001 $68,662.00 Total Stormwater, Shoreline Restoration and Plant Materialsil $281,047.001 $255,4370 LABELLE PARK IMPROVEMENT PROJECT CITY OF COLUMBIA HEIGHTS, MN S:\Projects\CIP_15_LaBe11e Pond \Deliverables\20150401 -MWMO MOU bid sheet costs WSB PROJECT NO. 01792 -110 Page - 2 of 2 Estimated Unit Bid Total Bid No. Section 5 - Plant Materials 2t j. Unit In Dollars In Dollars 40 Furnish and install Type I Turf Seed Mix as indicated on plans, details and 0.8 AC $4,000.00 $3,200.00 $3,200.00 specifications - complete, including two months maintenance Furnish and install Type II Native Seed Mix as indicated on plans, details and 0.5 AC $6,500.00 $3,250.00 $3,250.00 41 specifications - complete, including two months maintenance 42 Furnish and install wood fiber blanket as indicated on plans - complete 5810 SY $2.50 $14,525.00 $14,525.00 Furnish and install B &B Deciduous Trees as indicated on plans, details and 13 EA $500.00 $6,500.00 $6,500.00 43 specifications - complete, including hardwood mulch Furnish and install B &B Coniferous Trees as indicated on plans, details and I EA $500.00 $500.00 $500.00 44 specifications - complete, including hardwood mulch Furnish and install Container Shrubs as indicated on plans, details and 71 EA $65.00 $4,615.00 $4,615.00 45 specifications - complete, including hardwood mulch Furnish and install Container Perennials as indicated on plans, details and 29 EA $20.00 $580.00 $580.00 46 specifications - complete, including hardwood mulch Furnish and install Steel Edging - complete, as indicated on plans, details, and 50 LF $6.00 $300.00 $0.00 47 specifications Section 5 Subtotal:1 $33,470.001 $33,170.00 Total Stormwater, Shoreline Restoration and Plant Materialsil $281,047.001 $255,4370 LABELLE PARK IMPROVEMENT PROJECT CITY OF COLUMBIA HEIGHTS, MN S:\Projects\CIP_15_LaBe11e Pond \Deliverables\20150401 -MWMO MOU bid sheet costs WSB PROJECT NO. 01792 -110 Page - 2 of 2 inv 919.65 Existing 24~LaBelle Pond Outlet inv 920.45 North Pond Approximate Location Elevation: +/- 926 Legend Proposed Pond Existing Storm Sewer aa�x:,�nans- anKOVOZ�x b�ano�e'1lae4S "— :drgag nfied' 6.. uP' 6uiP�+ B- pll- Z61tpWasotloid�pealptt2fittp \�I =W1j 8uIMwp btpZ'pZ A¢W MQ0