Loading...
HomeMy WebLinkAboutContract No. 2015-2632February 19, 2015 Mr. Kevin Hansen Public Works Director City of Columbia Heights 637 - 38th Avenue NE Columbia Heights, MN 55421 RE:Professional Services Proposal — LaBelle Park Shoreline Restoration & Site Improvement Project Dear Mr. Hansen: I am pleased to submit this letter proposal on behalf of WSB & Associates, Inc. (WSB) to the City of Columbia Heights (City) to complete professional design and engineering services for the LaBelle Park Shoreline Restoration and Site Improvement Project. A. Construction Documents for Change Order Scope WSB shall prepare Construction Documents for post -bid improvements that will be incorporated via Change Order to the Construction Contract, as approved by the City. Construction Documents shall clearly define the extent of work, construction standards and techniques, and general guidelines necessary for incorporation into existing Construction Documents bid on February 11, 2015: a. Preparation of final construction drawings (plans) for walkways, bench pads, and planting improvements at the shoreline garden space as approved by the City for inclusion in this phase of the work and to be completed by the Contractor. Not included within this proposal is the design of park elements and structures, plaza spaces, paver and colored pavement areas. b. Coordinate and interface with the City and Contractor to meet desired budget of Change Order Scope. c. Define unit prices and quantities to be incorporated to the Contract by Change Order. d. Deliverables shall include one hard copy of all 100% complete plans and specifications and one digital copy. Minneapolis ■ St. Cloud Equal Opportunity Employer 2015 -2632 WSB ANNOMEMML Engineering ■ Planning ■ Environmental ■ Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763- 541 -4800 Fax: 763 -541 -1700 February 19, 2015 Mr. Kevin Hansen Public Works Director City of Columbia Heights 637 - 38th Avenue NE Columbia Heights, MN 55421 RE:Professional Services Proposal — LaBelle Park Shoreline Restoration & Site Improvement Project Dear Mr. Hansen: I am pleased to submit this letter proposal on behalf of WSB & Associates, Inc. (WSB) to the City of Columbia Heights (City) to complete professional design and engineering services for the LaBelle Park Shoreline Restoration and Site Improvement Project. A. Construction Documents for Change Order Scope WSB shall prepare Construction Documents for post -bid improvements that will be incorporated via Change Order to the Construction Contract, as approved by the City. Construction Documents shall clearly define the extent of work, construction standards and techniques, and general guidelines necessary for incorporation into existing Construction Documents bid on February 11, 2015: a. Preparation of final construction drawings (plans) for walkways, bench pads, and planting improvements at the shoreline garden space as approved by the City for inclusion in this phase of the work and to be completed by the Contractor. Not included within this proposal is the design of park elements and structures, plaza spaces, paver and colored pavement areas. b. Coordinate and interface with the City and Contractor to meet desired budget of Change Order Scope. c. Define unit prices and quantities to be incorporated to the Contract by Change Order. d. Deliverables shall include one hard copy of all 100% complete plans and specifications and one digital copy. Minneapolis ■ St. Cloud Equal Opportunity Employer Mr. Kevin Hansen February 19, 2015 Page 2 Construction Observation Services: 1. WSB will undertake project administration and observation of construpffon plogess for adherence to design intent as expressed in the plans speci i 'ons of contract, including: a. Prepara ' of the contract, review and process appl' tion for certificate of payment fo change order forms, substantia ompletion forms, final payment forms, et . b. Administration of pre -c struction in ing to review the project elements and clearly define the City's exp t' s as to the quality of construction, dealing with problems that may aris , im ess, etc. c. Site observation on a 'odic basis (u 8 site meetings) to review progress and observe contr or's work and to monit hat the design intent of the PI ans and spe ' ications is being met, which inc s preparation of field reports a iecessary to document specific issues and a s of concern and rev' of shop drawings and testing requirements /procedu d. n -going correspondence with staff and contractor for purposes reviewing construction progress and discussion of pertinent issues, concerns an upcoming schedule milestones. C. Additional Services Miscellaneous Additional Services: Services other than those listed in the Scope of Services above and requested and authorized in writing by the City. These services shall be billed on an hourly basis according to the WSB Rate Schedule. It is proposed that this project be billed hourly with a total estimated amount listed for each task. Listed below is a summary of the Fees for the proposed project as outlined in our Scope of Services: Change SCOPE OF SERVICES FEE B-AUA A11111011'11: Order/CD's: 3,100.00 �_ @5 1111 TOTAL ESTIMATED ! _ 0 ; If you are in agreement with the terms as outlined above, please sign where indicated below and return one copy to our office. Thank you for this opportunity to propose on this project. If you should have any questions regarding this proposal, please contact me at 763 - 231 -4844 Mr. Kevin Hansen February 19, 2015 Page 3 Sincerely, WSB & Associates, Inc. Robert Slipka, RLA Senior Landscape Architect ACCEPTED BY: City of Columbia Heights, MN By: Title: Date: � - 6 --15