Loading...
HomeMy WebLinkAboutResolution No. 2013-020 RESOLUTION 2013-020 BEING A RESOLUTION ORDERING IMPROVEMENTS AND PREPARATION OF PLANS FOR CONCRETE STREET REHABILITIATION CITY PROJECT 1302 WHEREAS,Resolution 2013-017 of the Columbia Heights City Council adopted the 11t`day of February,2013, fixed a date for a Council hearing on the proposed improvement bounded by Johnson Street/Pierce Terrace on the west,Stinson Boulevard on the east,Corporate Limit on the north and the Plat Boundary for Innsbruck P Addition on the south. AND WHEREAS,ten days'mailed notice and two published notices of the hearing a week apart were given,and the hearing was held thereon the 4"'day of March,2013,at which all persons desiring to be heard were given an opportunity to be heard thereon. WHEREAS,the Council determines to proceed with this local improvement,a portion of the cost being defrayed by special assessments under Charter provisions. NOW THEREFORE,BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA HEIGHTS, MINNESOTA: I. That the location and extent of such improvements is as follows: CONCRETE STREET REHABILITATION Innsbruck Parkway,Johnson St to Stinson Blvd Innsbruck Parkway West,Innsbruck Pkwy to Innsbruck Pkwy Innsbruck Circle West,West of Innsbruck Pkwy West Matterhorn Drive,Pierce Terrace to Corporate Limit Rainier Pass,Innsbruck Pkwy to Corporate Limit Saint Moritz Drive,Innsbruck Pkwy to Corporate Limit Argonne Drive,Innsbruck Pkwy to Stinson Blvd Pennine Pass,South Plat Boundary to Argonne Dr Saint Imier Drive,Argonne Dr to Corporate Limit Chalet Drive,Pennine Pass to Stinson Blvd Stinson Blvd,South Plat Boundary to Argonne Dr Work includes required utility reconstruction,new aggregate base if needed,spot replacement of curb, full and partial panel replacement,full and partial depth joint and crack repairs,joint and crack sealing, full depth bituminous repairs,sod restoration,miscellaneous construction items,and appurtenances. 2. Such improvement is necessary,cost-effective,and feasible as detailed in the feasibility report. 3. Such improvement is hereby ordered as proposed in the Council Resolution adopted 1 Ph day of February,2013. 4. These improvements shall also be known as Project 1302 and PIR 2013-Z3-03-001. 5. The City Engineer,Kevin Hansen,is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. Passed this 01 day of March,2013. Offered by: D i ehm CITY OF COLUMBIA HEIGHTS Seconded by: Williams Roll Call4�­ , All ayes Tori tlep rdt City Mayor Gary L. Peterson