HomeMy WebLinkAboutResolution No. 2012-046 RESOLUTION 2012-046
BEING A RESOLUTION ORDERING THE PREPARATION OF A
FEASIBILTY REPORT FOR SIDEWALK ON THE NORTH SIDE OF 43RD AVENUE
BETWEEN QUINCY STREET AND CENTRAL AVENUE
WHEREAS, the Traffic Commission has recommended sidewalk be constructed on the north
side of 43rd Avenue between Quincy Street and Central Avenue, and
WHEREAS, the City Council intends to assess the benefited property for all or a portion of the
cost of the improvement, pursuant to Minnesota Statutes, Section 429.011 to 429.111 (Laws
1953, Chapter 398, as amended), and Section 103B.201 to 103B.251, as follows:
43RD AVENUE SIDEWALK, QUINCY STREET TO CENTRAL AVENUE
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF COLUMBIA
HEIGHTS, MINNESOTA that the proposed improvements be referred to Mr. Kevin Hansen,
City Engineer, for study and that he is instructed to report to the Council with all convenient
speed advising the Council in a preliminary way as to whether the proposed improvements are
necessary, cost effective, and feasible, and as to whether it should best be made as proposed or in
connection with some other improvement, the estimated cost of the improvement as
recommended and a description of the methodology used to calculate individual assessments for
affected parcels.
Passed this 23rd day of April, 2012. CITY OF COLUMBIA HEIGHTS
Offered by: Williams
Seconded by: Schmitt
Roll Call: Ayes: Peterson, Williams,Nawrocki, Diehm, Schmitt
ayor Gary 'Peterson
(Patricia •
Muscovitz CMC
City Clerk