Loading...
HomeMy WebLinkAboutOperational Report for Ramon To: M. Rebecca Loader, Library Director From: Ramon Gomez, Library Clerk Subject: November Operational Report Date: November 30, 2011 COLLECTION PROJECTS I. Magazines A.: Magazine labels were typed for newly received magazines. Weeding: B. General weeding of the collection continued this month in the 636-641 section of nonfiction. Damaged Shelf: C. The Damaged shelf was cleaned 11/30/2011. Hudson’s Maps: D. The 2012 Hudson’s Maps Street Atlas’ were ordered 11/28/2011. MAINTENANCE PROJECTS II. th Security Gates: A. Filters were cleaned on November 10. th Air Fresheners: B. Air Fresheners were replaced on November 10. th Fire Extinguishers: C. Fire extinguishers were checked on November 10. Public Works: D. Public Works came out to hang artwork on block walls and to replace light bulbs this month. It was found that ballasts were the reason to our lighting problems. Heights Electric: E. Heights Electric came out to the library to replace several ballasts this month. MISCELLANEOUS III. ILL Drawer: A. The ILL drawers were maintained and a weekly count of filled requests has been up kept. Paperback Display: B. A Paperback display featuring paranormal romance was maintained this month. Month End Statistics: C. The statistics for the previous month were totaled and then distributed to staff for their records and/or use. Bulletin Board: D.The Bulletin board was maintained and cleaned this month. Shelf Reading: E. Lists generated for the Pages to write their progress down from shelf reading were made this month. Page Training: F. Training of the new page was done this month. It is set to conclude nd on December 2. rg