HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: October Operational Report
Date: October 26, 2011
COLLECTION PROJECTS
I.
Magazines
A.: Magazine labels were typed for newly received magazines.
Weeding:
B. General weeding of the collection continued this month in the 636-641
section of nonfiction.
Damaged Shelf:
C. The Damaged shelf was cleaned 10/13/2011.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on October 26.
th
Air Fresheners:
B. Air Fresheners were replaced on October 26.
th
Fire Extinguishers:
C. Fire extinguishers were checked on October 26.
Public Works:
D. Public Works came out 10/25/2011 to take down the Bookawocky
Summer Reading Program banner from the front of the building.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained and a weekly count of filled
requests has been up kept.
Paperback Display:
B. A Paperback display featuring paranormal romance was
maintained this month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to staff for their records and/or use.
Bulletin Board:
D.The Bulletin board was maintained and cleaned this month.
Shelf Reading:
E. Lists generated for the Pages to write their progress down from shelf
reading were made this month.
Website Training:
F. Participation in the training of the new website content
th
management system was done this month. The training ran from October 4 through
th
October 6.
rg