Loading...
HomeMy WebLinkAboutOperational Report for Ramon To: M. Rebecca Loader, Library Director From: Ramon Gomez, Library Clerk Subject: October Operational Report Date: October 26, 2011 COLLECTION PROJECTS I. Magazines A.: Magazine labels were typed for newly received magazines. Weeding: B. General weeding of the collection continued this month in the 636-641 section of nonfiction. Damaged Shelf: C. The Damaged shelf was cleaned 10/13/2011. MAINTENANCE PROJECTS II. th Security Gates: A. Filters were cleaned on October 26. th Air Fresheners: B. Air Fresheners were replaced on October 26. th Fire Extinguishers: C. Fire extinguishers were checked on October 26. Public Works: D. Public Works came out 10/25/2011 to take down the Bookawocky Summer Reading Program banner from the front of the building. MISCELLANEOUS III. ILL Drawer: A. The ILL drawers were maintained and a weekly count of filled requests has been up kept. Paperback Display: B. A Paperback display featuring paranormal romance was maintained this month. Month End Statistics: C. The statistics for the previous month were totaled and then distributed to staff for their records and/or use. Bulletin Board: D.The Bulletin board was maintained and cleaned this month. Shelf Reading: E. Lists generated for the Pages to write their progress down from shelf reading were made this month. Website Training: F. Participation in the training of the new website content th management system was done this month. The training ran from October 4 through th October 6. rg