HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: September Operational Report
Date: September 28, 2011
COLLECTION PROJECTS
I.
Magazines
A.: Magazine labels were typed for newly received magazines.
Weeding:
B. General weeding of the collection continued this month in the 635-636
section of nonfiction.
Damaged Shelf:
C. The Damaged shelf was cleaned 9/1/2011.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on September 14.
th
Air Fresheners:
B. Air Fresheners were replaced on September 16.
th
Fire Extinguishers:
C. Fire extinguishers were checked on September 16.
Public Works:
D. Public Works came out 9/27/2011 to cut a bolt out of the floor in the
Print Room.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained and a weekly count of filled
requests has been up kept.
Paperback Display:
B. A Paperback display featuring various forms of fiction, from
romantic to government to movie tie-ins, was maintained this month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to staff for their records and/or use.
Bulletin Board:
D.The Bulletin board was maintained and cleaned this month.
Shelf Reading:
E. Lists generated for the Pages to write their progress down from shelf
reading were made this month. A few modifications to the Children’s Shelf Reading list
were also made this month.
rg