HomeMy WebLinkAboutContract 1599 May 25, 2001 33 5th Ave NW new brighton. mn 55112 telephone: 651.634.6100 PEA FOR: 1.800.892.8548 Aleksander Chernin (Phone #763.706.3638/Fax #763.706.3637) tax: 651 636.2855 City of Columbia Heights 1.800.847.3087 590 40th Ave NE webaite: Columbia Heights, MN 55421 www.marconet.com E -mail: aeksander. chemin @ci.columbia - heights.mn.us FROM: Marco (Randy Mechels, 651.634.6118) 33 5th Ave NW New Brighton, MN 55112 SUBJECT: Performance Expectation Agreement (PEA) for the installation of a wireless access solution for point -to -point for City Hall to Top Value and Park View locations. 1. Project Information: a. Project Number: RDM1027 -IT b. The purpose of this project is to provide a wireless access solution for point -to -point for City Hall to Top Value and Park View locations. 2. Proposed Project Equipment List: The equipment listed in Table 1 is a listing of items to be installed by the Marco installation team upon arrival. This table includes equipment items purchased through Marco. Item Description Qty Extended Price 340 Series 3 $4,800.00 Antenna Kits 2 $950.00 Antenna Kit 1 $750.00 Miscellaneous Hardware for above Installation $300.00 Estimated Labor (16 Hours @ $185.00/Hour) $2,960.00 One Year Annual Equipment Maintenance and Service Contract 2 $536.00 through Cisco for above Equipment Antenna Installation 1 $1,764.00 Multimode Fiber $275.00 Wall Mount Fiber Boxes 2 $370.00 TOTAL $12,705.00 Table 1 Equipment Required for Installation RM:to SERV - 4013 -s Page 1 of 5 RDM1027 -IT doc (5 -1 -01) (Rev. E- 08/O1/2000) Performance Expectation Agreement (PEA) FOR: Aleksander Chernin —City of Columbia Heights PROJECT: Provide a wireless access solution for point -to -point for City Hall to Top Value and Park View locations 3. Task List: ATTACHMENTI of the PEA contains the major tasks to be completed by the Marco installation team upon their arrival. Although the tasks are general in nature, tasks determined to be out -of -scope for this project will be billed at our normal service rates. 4. Billing: The total cost for this project as outlined in Attachment 1 and Table 1 will not exceed $12,705.00. If additional services or hours are required, they will be billable at $185.00 an hour. * These rates are in effect during normal business hours. Services provided before 8:00 a.m., after 5:00 p.m. or on Saturdays will be charged at 1.5 times the normal hourly rate, Sundays and holidays will be billed at 2 times the normal rate. 5. Implementation Schedule Dates: The anticipated Team Start Date (TSD) for this project is to be determined. This date is contingent upon material availability, team availability, customer support requirements completed, and all other necessary lines or supporting communication requirements as outlined above. 6. Warranty: Marco warrants that the hardware included in the original system will be free from defects in materials and workmanship if an item arrives inoperable from the date of acceptance by City of Columbia Heights; please return this merchandise within 30 days for replacement. After the 30 days the systems are covered by their respective manufacturer's warranties. Please consult the warranty documentation that accompanies the product for details. Any charges from the manufacturer are the sole responsibility of the customer (including but not limited to shipping, travel or labor charges). Marco can provide assistance with the processing of these warranties at our normal service rates. Optional contracts or warranty enhancements are available for an additional fee at the time of purchase. If the customer purchases the Cisco extended warranty, will receive the required on -site services for post installation from Cisco. 7. Customer Responsibilities: Customer retains the on -going responsibility to follow the operating instructions applicable to the customer's equipment and software. It is the legal responsibility to assure that all software installed on the customer's computers are legally obtained and licensed. Under no circumstances will Marco install or upgrade software when questions of licensing exist. In addition, the customer is solely responsible to assure that proper backup procedures are in place sufficient to safeguard the customer's data. Prior to a network Operating System upgrade, the customer is responsible to provide two complete verified backups. 8. Limitation of Liability: In no event will Marco be liable for any damages caused by the customer's failure to perform customer's responsibilities. In no event will Marco be responsible for any loss of profits or consequential damages, even if Marco has been advised of the possibility of such damages. Marco will not be liable for any claim against the customer brought by any other party. 9. Sparing: It is the responsibility of City of Columbia Heightsto provide spares for the installed equipment. Marco recommends as a minimum, hot spares for the bridge units, transceivers, and spare ports for the switched Ethernet connections. Downtime caused as a result of parts on order is not the responsibility of Marco. RM:to SERV - 4013 -s Page 2 of 5 RDM1027- IT.doc (5 -1 -01) (Rev. E -08!01/2000) Performance Expectation Agreement (PEA) FOR: Aleksander Chemin —City of Columbia Heights PROJECT: Provide a wireless access solution for point -to -point for City Hall to Top Value and Park View locations 10. PEA Processing: a. We request you provide message or telephonic acknowledgment of receipt of this PEA to Tash Oslowski, 800.847.3094 or by FAX 1.800.847.3035). NOTE: Scheduling action cannot be finalized until your concurrence with the PEA has been returned to this office. Any delay at this time can incur a delay in the installation of your programmed facility. b. Signed concurrence with the PEA ( "ACCEPTANCE SIGNATURES:" section) may be either FAXED at 1.800.847.3035 or MAILED to: Tash Oslowski Marco 33 5th Ave NW New Brighton, MN 55112 and shall imply concurrence with the following information: (1) Concurrence with the equipment or facility siting; (2) Concurrence with the list of materials, (3) Concurrence with all supporting requirements, service, and team start date. This agreement constitutes the entire understanding of both parties. No other agreements have been expressed or implied. Any changes or modifications to this contract need signed agreement by both parties, and are contained as amendments to this document. • ACCEPTANCE SIGNATURES: (pre- authorization of project scope and services) ( 411W 1 -... 05 (2q/0 I .. - �� /"� 5/2501 Aleksander Chernin Date Randy r) echels Date City of Columbia Heights Marco Account Representative .143,11/4. 5/25/01 Steven Knutson Date Marco Systems Engineer RM:to SERV - 4013 -s Page 3 of 5 RDM1027- IT.doc (5 -1 -01) (Rev. E- 08/01/2000) Performance Expectation Agreement (PEA) • • FOR: Aleksander Chemin —City of Columbia Heights PROJECT: Provide a wireless access solution for point -to -point for City Hall to Top Value and Park View locations POST- INSTALLATION ACCEPTANCE: This area is to be completed AFTER installation: System tests have been successfully completed and the unit is considered operational on this 0 day of 3 20at. JJ� Customer Acceptance Signature Date A wed arco Representative ate • • RM:to SERV - 4013 -s Page 4 of 5 R DM 1027 -IT. doc (5 -1 -01) (Rev. E- 0801/2000) �:: — •• Performance Expectation Agreement (PEA) FOR: Aleksander Chernin —City of Columbia Heights PROJECT: Provide a wireless access solution for point -to -point for City Hall to Top Value and Park View locations PEA ATTACHMENT 1 PEA Task List Initials The Marco installation team shall complete the following tasks: y � 1. At the Parkview Villa: 1.1 Install one 12dB Omni antenna outside the penthouse wall. Run and terminate multimode fiber from the antenna location to the LAN. Existing media converters (10BaseFX- 10BaseTX) will be used. 1.2 Install the Cisco bridge unit in the penthouse mechanical room. Existing 120VAC power will be used. "at 1.3 Configure the bridge unit for operation on the existing LAN. 64, 2. At the City Hall: 2.1. Install one Yagi antenna on the existing tower. 2.2 Install the Bridge unit inside the stair well or outside on the tower depending on the distance requirements of the bridge unit. Existing media converters (10BaseFX- 10BaseTX) will be used. 120VAC power will be required near the installation of the bridge unit. 2.3 Configure the bridge unit for operation on the existing LAN. 3. At Top Value Liquor. 3.1. Install one Yagi antenna on a pipe near the A/C unit. 3.2 Install the Bridge unit near the administrative offices upstairs. 120VAC power will be required near the installation of the bridge unit. 3.3 Configure the bridge unit for operation on the existing LAN. RM:to SERV - 4013 -s Page 5 of 5 RDM1027- IT.doc (5- 1 -fd) (Rev. E- 08/01/2000)