HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: July Operational Report
Date: July 28, 2011
COLLECTION PROJECTS
I.
Magazines
A.: Magazine labels were typed for newly received magazines.
Weeding:
B. General weeding of the collection continued this month in the 600 section
of nonfiction. Weeding of the CDs 781.629-781.631 was also completed this month.
Damaged Shelf:
C. The Damaged shelf was cleaned 7/14/2011.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on July 13.
th
Air Fresheners:
B. Air Fresheners were replaced on July 13.
th
Fire Extinguishers:
C. Fire extinguishers were checked on July 13.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained and a weekly count of filled
requests has been up kept.
Paperback Display:
B. A Paperback display featuring western/cowboy themed
romance was maintained this month. An additional display featuring new paperbacks was
also maintained.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to staff for their records and/or use.
Bulletin Board:
D.The Bulletin board was maintained and cleaned this month.
Shelf Reading:
E. Lists generated for the Pages to write their progress down from shelf
reading were made this month.
Training:
F. Training on CybraryN with staff was done this month.
T-Shirt Design
G.: A design for a T-shirt for READ Dogs participants was completed
this month.
rg