HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: June Operational Report
Date: June 29, 2011
COLLECTION PROJECTS
I.
Magazines
A.: Magazine labels were typed for newly received magazines.
th
Paperback Order:
B. A paperback order was completed on June 14.
Weeding:
C. General weeding of the collection continued this month in the 600 section
of nonfiction.
Damaged Shelf:
D. The Damaged shelf was cleaned 6/23/2011.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on June 29.
th
Air Fresheners:
B. Air Fresheners were replaced on June 29.
th
Fire Extinguishers:
C. Fire extinguishers were checked on June 29.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained and a weekly count of filled
requests has been up kept.
Paperback Display:
B. A Paperback display featuring paranormal romance was
maintained this month. An additional display featuring paperbacks new to the Library
was also maintained this month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to staff for their records and/or use.
Bulletin Board:
D.The Bulletin board was maintained and cleaned this month.
Shelf Reading:
E. Lists generated for the Pages to write their progress down from shelf
reading were made this month.
rg