Loading...
HomeMy WebLinkAboutResolution No. 2011-019 RESOLUTION NO. 2011-019 RESOLUTION APPROVING A PRELII\UNARY PLAT SUBDIVISION WITH CERTAIN CONDITIONS FOR ALDI, INC. WHEREAS, a proposal (Case No. 2011 -0402) has been submitted by Aldi, Inc. to the City Council requesting a subdivision from the City of Columbia Heights Subdivision Code at the following site: ADDRESS: 5025 Central Avenue EXISTING LEGAL DESCRIPTIONS: On File at City Hall PROPOSED LEGAL DESCRIPTION: Lot 1, Block 1, Aldi Addition THE APPLICANT SEEKS APPROVAL OF A PRELIMINARY PLAT SUBDIVISION. WHEREAS, the City Council has considered the advice and recommendations of the Planning Commission regarding the effect of the proposed subdivision upon the health, safety, and welfare of the community and its Comprehensive Plan, as well as any concerns related to traffic, property values, light, air, danger of fire, and risk to public safety, in the surrounding area; and has held the required public hearing on this proposal on April 5, 2011. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Columbia Heights after reviewing the proposal, that the City Council accepts and adopts the following findings of the Planning Commission: 1. The proposed preliminary plat conforms to the requirements of §9.114. 2. The proposed subdivision is consistent with the Comprehensive Plan. 3. The proposed subdivision contains parcel and land subdivision layout that is consistent with good planning and site engineering design principles FURTHER, BE IT RESOLVED, that the attached condition, plans, maps, and other information shall become part of this subdivision approval. CONDITIONS: 1. An easement shall be provided over the stormwater treatment area, along with an on- going maintenance plan for facility — the City can provide a suggested form. 2. Prior to at the time of issuing a building permit, surety in the form of a Letter of Credit or cash escrow shall be provided to Public Works in the amount of $5,000 /acre for erosion control & site restoration in accordance with the City storm water management code. This will be returned following completion of turf establishment. 3. A letter of credit (LOC) needs to be provided prior to at the time of issuing a building permit for the public improvements, restoration in the public ROW and site landscaping. The calculation of the LOC shall include the removal and reconstruction of the alley and complete site landscaping x 1.25. This will be returned following completion of turf establishment. 4. For engineering site inspection, the Developer shall provide $1,500 to be deposited in an engineering escrow account for staff inspections of public ROW improvements, site SWPPP activities and utility work. All unused funds are returned to the Developer at project completion. 5. All erosion control measures shall be installed and inspected by the Engineering department prior to any site activities beginning. 6. The proposal will require a work within ROW permit from MnDOT. 7. All construction traffic shall be directed through the vehicle tracking pads, as indicated on the SWPPP plan. 8. All slopes greater than 3:1 shall be provided erosion control blanket. 9. Catch basin inlet protection, such as Wimco's or equivalent shall be provided on catch basins until restoration is completed. 10. Site /Civil work shall be inspected by the City Engineering Department (connection to public storm sewer system or work within ROW). 24 -hour advance notice of an inspection is required. 11. The City standard for drive entrances is a concrete apron matching the concrete curb and gutter. 12. An NPDES permit will be required, at the time of construction. The City also reserves the right to require additional erosion control measures during construction, as conditions warrant. 13. All restoration of turf areas in the Public Right -of -Way (ROW) shall be by four (4) to six (6) inches of topsoil /sodding. 14. Prior to installation of the stormwater system, all heavy equipment shall be kept out of the stormwater system footprint in order to prevent compaction of soils in the proposed infiltration area. 15. All work within Public ROW shall be inspected by the City Engineering Department. Twenty four (24) hour advance notice of an inspection is required. 16. All utilities (water main, sanitary sewer and storm sewer), shall meet the City of Columbia Heights specifications for materials and installation. 17. Disconnect any existing utility service stubs in accordance with Public Works requirements. 18. All sidewalks shall meet ADA requirements for pedestrian ramps and grade. Passed this 1 l day of April, 2011 Offered by: Diehm Seconded by: Williams Roll Call: Ayes: Peterson, Williams, Nawrocki, Diehm, Schmitt a, 1 # Mayor Gary L. eterson Attest: O .." i atricia Muscovitz, MC City Clerk