HomeMy WebLinkAboutResolution No. 2011-019 RESOLUTION NO. 2011-019
RESOLUTION APPROVING A PRELII\UNARY PLAT SUBDIVISION
WITH CERTAIN CONDITIONS FOR ALDI, INC.
WHEREAS, a proposal (Case No. 2011 -0402) has been submitted by Aldi, Inc. to the City Council
requesting a subdivision from the City of Columbia Heights Subdivision Code at the following site:
ADDRESS: 5025 Central Avenue
EXISTING LEGAL DESCRIPTIONS: On File at City Hall
PROPOSED LEGAL DESCRIPTION: Lot 1, Block 1, Aldi Addition
THE APPLICANT SEEKS APPROVAL OF A PRELIMINARY PLAT SUBDIVISION.
WHEREAS, the City Council has considered the advice and recommendations of the Planning
Commission regarding the effect of the proposed subdivision upon the health, safety, and welfare of
the community and its Comprehensive Plan, as well as any concerns related to traffic, property
values, light, air, danger of fire, and risk to public safety, in the surrounding area; and has held the
required public hearing on this proposal on April 5, 2011.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Columbia Heights
after reviewing the proposal, that the City Council accepts and adopts the following findings of the
Planning Commission:
1. The proposed preliminary plat conforms to the requirements of §9.114.
2. The proposed subdivision is consistent with the Comprehensive Plan.
3. The proposed subdivision contains parcel and land subdivision layout that is consistent with
good planning and site engineering design principles
FURTHER, BE IT RESOLVED, that the attached condition, plans, maps, and other information
shall become part of this subdivision approval.
CONDITIONS:
1. An easement shall be provided over the stormwater treatment area, along with an on- going
maintenance plan for facility — the City can provide a suggested form.
2. Prior to at the time of issuing a building permit, surety in the form of a Letter of Credit or
cash escrow shall be provided to Public Works in the amount of $5,000 /acre for erosion
control & site restoration in accordance with the City storm water management code. This
will be returned following completion of turf establishment.
3. A letter of credit (LOC) needs to be provided prior to at the time of issuing a building permit
for the public improvements, restoration in the public ROW and site landscaping. The
calculation of the LOC shall include the removal and reconstruction of the alley and
complete site landscaping x 1.25. This will be returned following completion of turf
establishment.
4. For engineering site inspection, the Developer shall provide $1,500 to be deposited in an
engineering escrow account for staff inspections of public ROW improvements, site SWPPP
activities and utility work. All unused funds are returned to the Developer at project
completion.
5. All erosion control measures shall be installed and inspected by the Engineering department
prior to any site activities beginning.
6. The proposal will require a work within ROW permit from MnDOT.
7. All construction traffic shall be directed through the vehicle tracking pads, as indicated on
the SWPPP plan.
8. All slopes greater than 3:1 shall be provided erosion control blanket.
9. Catch basin inlet protection, such as Wimco's or equivalent shall be provided on catch basins
until restoration is completed.
10. Site /Civil work shall be inspected by the City Engineering Department (connection to public
storm sewer system or work within ROW). 24 -hour advance notice of an inspection is
required.
11. The City standard for drive entrances is a concrete apron matching the concrete curb and
gutter.
12. An NPDES permit will be required, at the time of construction. The City also reserves the
right to require additional erosion control measures during construction, as conditions
warrant.
13. All restoration of turf areas in the Public Right -of -Way (ROW) shall be by four (4) to six (6)
inches of topsoil /sodding.
14. Prior to installation of the stormwater system, all heavy equipment shall be kept out of the
stormwater system footprint in order to prevent compaction of soils in the proposed
infiltration area.
15. All work within Public ROW shall be inspected by the City Engineering Department.
Twenty four (24) hour advance notice of an inspection is required.
16. All utilities (water main, sanitary sewer and storm sewer), shall meet the City of Columbia
Heights specifications for materials and installation.
17. Disconnect any existing utility service stubs in accordance with Public Works requirements.
18. All sidewalks shall meet ADA requirements for pedestrian ramps and grade.
Passed this 1 l day of April, 2011
Offered by: Diehm
Seconded by: Williams
Roll Call: Ayes: Peterson, Williams, Nawrocki, Diehm, Schmitt