Loading...
HomeMy WebLinkAboutResolution No. 2010-133 RESOLUTION 2010 -133 BEING A RESOLUTION ORDERING IMPROVEMENTS AND PREPARATION OF PLANS FOR ZONE 6 STREET REHABILITIATION - CITY PROJECT 1102 WHEREAS, Resolution 2010 -128 of the Columbia Heights City Council adopted the 22 " day of November, 2010, fixed a date for a Council hearing on the proposed improvement bounded by University Avenue on the west, 40 Avenue on the south, Central Avenue on the east and 44 Avenue on the north, AND WHEREAS, ten days' mailed notice and two published notices of the hearing a week apart were given, and the hearing was held thereon the 6 day of December, 2010, at which all persons desiring to be heard were given an opportunity to be heard thereon. WHEREAS, the Council determines to proceed with this local improvement, a portion of the cost being defrayed by special assessments under Charter provisions. NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA HEIGHTS, MINNESOTA: 1. That the location and extent of such improvements is as follows: FULL STREET RECONSTRUCTION 6th Street, 40 Avenue to 44 Avenue Work includes required utility reconstruction/repair, required water service replacement /repair, new granular subbase if needed, new aggregate base, new concrete curb and gutter with driveway aprons, new bituminous surfacing, required concrete or bituminous driveway and walk/step replacement, sod restoration, miscellaneous construction items, and appurtenances. STREET MILL AND OVERLAY 4 Street, 42 " Avenue to 44 Avenue Work includes required utility reconstruction/repair, spot replacement of curb and gutter with required concrete or bituminous driveway and walk/step replacement, milling of existing street surface, new bituminous surfacing, sod restoration, miscellaneous construction items, and appurtenances. 2. Such improvement is necessary, cost - effective, and feasible as detailed in the feasibility report. 3. Such improvement is hereby ordered as proposed in the Council Resolution adopted 22 " day of November, 2010. 4. These improvements shall also be known as Project 1102 and PIRs: 2011 -Z6 -02 -001 for Full Street Reconstruction, and 2011 -Z6 -44 -001 for Street Mill and Overlay. 5. The City Engineer, Kevin Hansen, is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. Passed this 6 day of December, 2010. CITY OF COLUMBIA HEIGHTS Offered by: Kelzenberg Seconded by: Williams Roll Call: Ayes: Peterson, Williams, Diehm, Kelzenberg Nay: Nawrocki 1 %17 AlTor, Gary L. Peterson -.6a Allar ' atricia Muscovitz, C�MC ity Clerk