HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: November Operational Report
Date: November 24, 2010
COLLECTION PROJECTS
I.
Magazines
A. : Magazine labels were typed for newly received magazines.
ACL Weeding:
B. Last copies of materials within Workflows that Columbia Heights
owns the last copy of were found and withdrawn. Others were then used on the Book
Sale Cart.
th
Damaged Shelf:
C. The Damaged shelf was cleaned November 10 and November
th
18.
th
Paperback Order:
D. A paperback order was completed on November 16 and
th
November 19.
Weeding:
E. General weeding of the collection continued this month.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on November 9.
th
Air Fresheners:
B. Air Fresheners were replaced on November 9.
th
Fire Extinguishers:
C. Fire extinguishers were checked on November 9.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained and a weekly count of filled
requests has been up kept.
Paperback Display:
B. A Paperback display featuring paperbacks themed after
Halloween and the various characters associated with it.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to staff for their records and/or use.
Bulletin Board:
D. The Bulletin board was maintained and cleaned this month.
Shelf Reading:
E. Lists generated for the Pages to write their progress down from shelf
reading were made this month.
rg