HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: August Operational Report
Date: August 25, 2010
COLLECTION PROJECTS
I.
Magazines
A. : Magazine labels were typed for newly received magazines.
ACL Weeding:
B. Last copies of materials within Workflows that Columbia Heights
owns the last copy of were found and withdrawn. Others were then used on the Book
Sale Cart.
thth
Damaged Shelf:
C. The Damaged shelf was cleaned August 5 and August 19.
th
Paperback Order:
D. A paperback order was completed on August 17.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on August 12.
th
Air Fresheners:
B. Air Fresheners were replaced on August 18.
th
Fire Extinguishers:
C. Fire extinguishers were checked on August 18.
Painting:
D. The painting of the Exterior Cap and Trim on the outside of the building
th
was done on August 27.
Caulking:
E. A new contact has been made for caulking of the building. The caulking
of the exterior of the building will be done soon.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained and a weekly count of filled
requests has been up kept.
Paperback Display:
B. A Paperback display featuring paperbacks with a general “hot”
theme was maintained this month..
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to staff for their records and/or use.
Bulletin Board:
D. The Bulletin board was maintained and cleaned this month.
rg