Loading...
HomeMy WebLinkAboutOperational Report for Ramon To: M. Rebecca Loader, Library Director From: Ramon Gomez, Library Clerk Subject: August Operational Report Date: August 25, 2010 COLLECTION PROJECTS I. Magazines A. : Magazine labels were typed for newly received magazines. ACL Weeding: B. Last copies of materials within Workflows that Columbia Heights owns the last copy of were found and withdrawn. Others were then used on the Book Sale Cart. thth Damaged Shelf: C. The Damaged shelf was cleaned August 5 and August 19. th Paperback Order: D. A paperback order was completed on August 17. MAINTENANCE PROJECTS II. th Security Gates: A. Filters were cleaned on August 12. th Air Fresheners: B. Air Fresheners were replaced on August 18. th Fire Extinguishers: C. Fire extinguishers were checked on August 18. Painting: D. The painting of the Exterior Cap and Trim on the outside of the building th was done on August 27. Caulking: E. A new contact has been made for caulking of the building. The caulking of the exterior of the building will be done soon. MISCELLANEOUS III. ILL Drawer: A. The ILL drawers were maintained and a weekly count of filled requests has been up kept. Paperback Display: B. A Paperback display featuring paperbacks with a general “hot” theme was maintained this month.. Month End Statistics: C. The statistics for the previous month were totaled and then distributed to staff for their records and/or use. Bulletin Board: D. The Bulletin board was maintained and cleaned this month. rg