Loading...
HomeMy WebLinkAboutOperational Report for Ramon To: M. Rebecca Loader, Library Director From: Ramon Gomez, Library Clerk Subject: December Operational Report Date: December 29, 2009 COLLECTION PROJECTS I. Magazines A. : Magazine labels were typed for newly received magazines. ACL Weeding: B. Last copies of materials within Workflows that Columbia Heights owns the last copy of were found and withdrawn. Others were then used on the Book Sale Cart. Weeding: C. Weeding of the nonfiction was done this month. Paperback Order: D. A Paperback Order was checked against the system for holdings this month. The order will be completed in the near future. nd Damaged Shelf: E. The Damaged Shelf was checked December 22. Items residing there for more than three months were discarded and a note was added to the patrons record. MAINTENANCE PROJECTS II. th Security Gates: A. Filters were cleaned on December 18. th Air Fresheners: B. Air Fresheners were replaced on December 18. th Fire Extinguishers: C. Fire extinguishers were checked on December 18. Public Works: D. Public Works was called out this month to do a minor repair to the main level Circulation Desk. A nail had popped out on the corner and part of the desk was loose because of it. This was resolved. Also, moldy ceiling tiles in the lobby were removed and replaced with new ones. Lastly, a glide was added to one of the Board Room chairs so it could slide across the carpet without damaging it. MISCELLANEOUS III. ILL Drawer: A. The ILL drawers were maintained and a weekly count of filled requests has been up kept. Paperback Display: B. An Holiday Fiction themed paperback display was maintained for this month. Month End Statistics: C. The statistics for the previous month were totaled and then distributed to staff for their records and/or use. Bulletin Board: D. The Bulletin board was maintained and cleaned this month. Book Sale Cart: E. The Book Sale cart was maintained this month. rg