HomeMy WebLinkAboutOperational report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: November Operational Report
Date: November 24, 2009
COLLECTION PROJECTS
I.
Magazines
A. : Magazine labels were typed for newly received magazines.
ACL Weeding:
B. Last copies of materials within Workflows that Columbia Heights
owns the last copy of were found and withdrawn. Others were then used on the Book
Sale Cart.
Weeding:
C. Weeding of the nonfiction was done this month.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on November 13.
th
Air Fresheners:
B. Air Fresheners were replaced on November 13.
th
Fire Extinguishers:
C. Fire extinguishers were checked on November 13.
Public Works:
D. Public Works was called out this month to clean the main level
Men’s Room. Someone had left a pair of dirty socks in there and stuffed the toilet with
shoelaces and other things. Public Works did a great clean up job.
Bathroom Vandalism:
E. The main level Men’s Room was vandalized with Sharpie
marker on the walls. The graffiti was removed by a staff member.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained and a weekly count of filled
requests has been up kept.
Paperback Display:
B. An Romance Fiction themed paperback display was maintained
for this month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to staff for their records and/or use.
Bulletin Board:
D. The Bulletin board was maintained and cleaned this month.
Book Sale Cart:
E. The Book Sale cart was maintained this month.
rg