PRdJECT (Warne ar2d address):
Columbia heights Public Safety Centt;r
825 41st Avenue ?~artheast
Co[umbta 1-lea;zltts, ia~l;v 55421.
Td CdNTRACTOR (th'aczze ar~d czc{clressl:
VdTCi Terrazo ~: Tile
755 IJast C`EiffRaad
Busvillee iv1N 55337
CHANGE ORDER FdUMBER: 046 CH3-
09-3-4
INITEATION DATE: September 18, 2009
PROJECT NUMBERS: BA 0806
CONTRACT DATE: December 8.2008
CONTRACT FOR: CH3-09-3 Porcelain
Tile
Ot~FJER: ~
CC3NSTRUCTEC}I~ P~ANAGER:
ARCHITECT:
CQP:TRACT~JR: ~
F1ELD: ^
:^
THE CONT CT ESC NC~ED AS FOLLOWS:
Chip concrete at l l drains in Roams C)19, 020, 120, 121, I57, 158, 160, 173, 182 and install tiEl as
needed for instalEatian afwaterpraafing membrane within plumbing clamp. Add $98(}.OO
The original Contract Sum was $ 125,()10.00
l~det change by previously authorized Change E>rders $ 1,272.00
`the C'antract Sum prior to this Change E)rder was $ 126,282.00
1`he C:ontraz Sum will [~; il~zc;reased by this C'hangc t~rcler in the amotlnT of $ 980.00
The nc;w C'antract Sum including this Change f}rcler will be $ 127,262.00
The Cc>ntraet "1'isne will be decreA2sed by Zert> (0) days.
The date of Substantial ~.ompleticxn as of the date of this Change C}rder thee~ t4~re is
NdTE: 'T'his summary does not re lect changes in the Contract Sum, C.'antract Time ar Ciuar~tnteed 1lhatiimum PI•ice which have
been authorized by Construction Change Directive.
NdT VALED UNTIL SEGNED E3Y THE OWNER, CONSTRUCTION NAOER, ARCHETECT AND CdNTRACTOR
EDS Builders. hoc
W'l'G "ferrazo & Tile
CONT CTOR ({~irm nurzze)
755 ~,ast CEi>rad, Burnsville, Iv1N 55337
DATE:
Buetaw and Asscx;iates, lnc
ARCHITECT (Firm ~-.
2345 Rice Str~t„~uite 2~ 0, Si. Paul. SIN 5113
ADDRESS ,,~-'
~,~
BY (Signature
David Olds ''
(typed name) DATE: .
City of Columbia Heights
(Tvped name) DATE:
AIA Document G701/CNtaTM' - 1992. Copyright t~s 1992 by The American Institute of Architects. AHt rights reserved.
L 6 f¢ Tr€ . ( as ~ or n
n p , 5 3.ci,s~~~sa ~:. s: >s~E,~ ~ask~r
AIA software at 13:15:30 on 0 911 712 0 0 9 under Order No.10D0385206_1 which expires on 0 111 9120 1 0, and is not for resale.
User Notes:
r~
€ ~ ~
This document was produced by
(1816229169)
TERRAZZO
ILE NC®
~'-.
Contractors/Consultants for Terrazzo, Tile, Natural Stone and Industrial Floor Coating
August 28, 2009
Mr. Earl "l~oe" Smith
EDS BUILDERS, INC.
404A Saint Croix Trail North
Lakeland, MN 55043
Re: WTG Job #2-08-0203
Columbia Heights P u'oiic Safety Ce~~.ter -Bid Package 3
Bid Division CH3-09-3 Porcelain Tile
825 - 41 S` Avenue NE
Columbia Heights, MN 55421
Dear Mr. Smith,
Subject: Request for Change Order
As discussed with you on June 11, 2009, we would appreciate receiving your add
change order for additional labor and materials for our personnel to -
Chip concrete at I 1 drains (total) in the rooms #019, 020, 120, 121, 157, 158, 160, 173, &
182,and then install fill as needed to allow for installation of waterproofing membrane
within plumbing clamp.
For this additional work we would appreciate receiving your add change order in the sum
of NINE HUNDRED EIGHTY DOLLARS (+$980.00) as per the attached breakdown.
Should you have any questions regarding the above please contact me.
~iy,
T,er~~zo & Tile, Inc.
roject Manager
WTG
Enclosures
an E ual O ortunit Em !o er s°
q pp Y p Y gip.:.,.
755 East Cliff Road Burnsville, MN 55337 Phone: (9525 746-9060 Fax: (952) 746-9059
WTG TERRAZZO & TILE, INC.
PROJECT #: 2-08-0203
PROJECT: Columbia Heights Public Safety Center
REGARDING: Chip concrete at 11 drains
DIRECT LABOR HOURS
WTGTT DIRECT LABOR
TAXABLE FRINGES
TOTAL TAXABLE LABOR
UNION FRINGES
F.I.C.A./S.U.T.A./F.UT.A.
WORK COMP
GL
DISTRIBUTABLES @ 10%
FARES/PARKING
SUBSISTENCE
SUBTOTAL DIRECT LABOR COSTS
GEN SUPT @ 15% OF LABOR
SUBTOTAL DIRECT LABOR COSTS
MATERIALS
SUBTOTAL LABOR & MAT.
WTGTT O.H. @ 10%
SUBTOTAL
WTGTT FEE @ 5%
PROPERTY DAMAGE @$2.20/$100
PERFORMANCE BOND
TOTAL COST
MATERIAL BREAKDOWN
MATERIAL COST $75.00
SETTING MATERIAL $0.00
SUBTOTAL $75.00
SALES TAX @ 7.125% $5.34
EQUIPMENT $0.00
FREIGHT & DEL $0.00
TOTAL MATERIALS $80.34
ST
11
$303.16
$33.22
$336.38
$199.31
$40.99
$22.12
$2.13
$30.32
$0.00
$0.00
$631.24
$94.69
$725.93
$80.34
$806.27
$80.63
$886.90
$44.34
$20.49
$28.55
_ $980.28
DATE:
OT
0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
08/28/09
DT
0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
LABOR & MATERIAL BREAKDOWN
tabor Materials
Subtotal $725.93 $80.34
Overhead $108.89 $12.05
Subtotal $834.82 $92.40
WTG Fee $83.48 $9.24
Subtotal $918.30 $101.63
Prop. Damage $20.20 $2.24
Total Cost $938.50 $103.87
Breakdown for Billing -Tile, May 1, 2004
~W ~ r _ ~ _~ - e ~ ~:: ~ J T~ -1992
~r~ r ffi r i ~~Q p m. r~ i
PROJECT (,~~anre arzd addressl:
Columbia Heights Public Safety Center
825 41st Avenue Northeast
Colttml,,ia I-lei~hts, MIS 55421
TO CONTRACTOR {Marne artc{r~ddres~l
E~r'I~O Terraza & Tile
755 East Cliff f2oad
13ttrnsviffe, MN 55337
THE CONTRACT IS C NC~ED AS FOLLOWS:
CHANGE ORDER NUMBER: 054 CH3-
09-3-5
INITIATION DATE: October 23, 2004
PROJECT NUMBERS: BA 0806 /
CONTRACT DATE: December 8, 2008
CONTRACT FOR: CH3-09-3 Porcelain
Tile
Cut. stub wall in Women`s Locker ILoom to 3`-O", rephtce fife and gout.
Suppf}~ and install 30 sf 18" `€ 18"' P"I'1 flcxlr file in Kitchen 163.
Total C;I~angc Order
fhc original Contract Sum w~zs
Nc;t change by prevrousty authorized C:17ar1ge Orders
The Contract Sum pric>r to this Change Order was
"hhe Contract Sum cvilf be increased by this Change Order in the amount of
I`he new Contract Own including this Cflange Order will be
The Contract Time will be unchanged by Zero 4f)} days.
7 he date of Substantial Completion as of the date ol`this Change Order therefore is
Add x;273.00
Add ~~"327.t)0
Add ~r6ClE).C1€)
125,010.00
2,252.00
127,262.00
600.00
127,g62.oa
NOTE: '1~his summary does not ret7ect changes in the Contract Sum, C'tultr°act l imc or ('suaranteed Maximum I'ric;e which have
been authorized by Constructiatl Change Directive.
NOT itALiD UNTIL SIGNED BY THE O1~lNER, CONSTRUCTION MANA(sER, ARCHITECT AND CONTRACTOR.
ll>S Builders- hoc
Buetow and Associatc;s, Inc.
ARCHITECT (FiYnz ncznze)
2345 Rice street, Suite 210, S~ Paul, MN 55113
ADORES:;
BY (Sig re) --~
David Olds ~ __
(Typed name) DATE:
W1~'G Terrazo cRc Tile
__
Citv of Columbia Heights
AIA Document G701/CMaTTM -1992. Copyright O 1992 by the American Institute of Architects. Ai6 rights resen+ed,
g l..< r or ~ o
sa3 r . ,......€..~,. s r to rt
AIA software at 12:21:13 on 10/23/2009 under Order No.1000385206_1 which expires on 01/19(2010, and is not for resale.
User Notes:
QINNER: ~
CC}NSTRUCTiON MANAGER: ~
ARGHITECT:
G~?NTRP.GTGR:
FIELD:
:^
.., nan~'' f°. Ira
b . a€
This document was produced by
(1398098762)
CONT CTOR (Fir°nz name=i
755 East C1i1T1Zoad, 13ut°nsvilfe, i~%1N 55337
T
TERRAZZO TILE INC.
Contractors/Consultants forTerrazzo, Tile, Natural Stone and Industrial Floor Coating
~~~cY~Y ~ Ii't<~ir~(~--
September 21, 2009
ivlr. Earl "Doc" Smith
EDS BUILDERS, INC.
404A Saint Croix Trail North
Lakeland, MN 55043
Re: WTG Job #2-08-0203
Columbia Heights Public Safety Center -Bid Package 3
Bid Division CI-I3-09-3 Porcelain Tile
825 - 41St Avenue NE
Columbia Heights, MN 55421
Subiect: Request for Change Order (rtn #153}
Dear Mr. Smith,
Please see attached copy of our "Additional Work Authorization Sheet" dated
09/17/09, signed by you for additional labor and materials for our personnel to -
Replace wall the on stub wall in Women's locker room #153.
For this additional work we would appreciate receiving your add change order in the sum
of TWO HUNDRED SEVENTY-THREE DOLLARS (+$273.00) as per the attached
breakdown.
Should you have any questions regarding the above please contact me.
Sincerely, -~
~vVT~G Tgr~i & Tile, Inc.
ect Manager
WTG
Enclosures
,~'
an Equal Opportunity Employer ~;-r;~:
755 East Cliff Road Burnsville, MN 55337 Phnge: (952) 746-9060 Fax: (952} 746-9059
WTG TER ZO & TILE, INC.
755 East Cliff Road
Burnsville, MN 55337
PHONE (952} 746-9060 FAX (952) 746-9059
e-mail: info@wtgrazzini.com
ADDITIONAL WORK AUTHORIZATION SHEET
Date ~-/ ~ t7 ~
Job Name ~~~, f~~,. oa;=R 3 G~ . F=lt ~~°y ~.~-~ S ~ -~
Job No. '
The undersigned agrees to pay WTG Terrazzo & Tile, Inc.
for the additional work authorized as indicated below
Total Hours Worked
Em to ee Monda Tuesda Wednesda Thursda Frida Saturda Sunda
~~~
Down Time
Reason for down time
Total H ours Tools Used
Tools Used Monda Tuesda Wednesda Thursda Frida Saturda Sunda
Materials Used :
of additional work completed
Additional Work authorized by (please print name)
Company Name /Title /Signature
=`~,
"`,
- ~.
~, ~.
WTG TERRAZZO & TILE, INC.
PROJECT #: 2-08-0203
PROJECT: Columbia Heights Public Safety Center
REGARDING: Rrn. #153 Women's Locker room
DIRECT LABOR HOURS
WTGTT DIRECT LABOR
TAXABLE FRINGES
TOTAL TAXABLE LABOR
UNION FRINGES
F.I.C.A.IS.U.T.A./F.UT.A.
WORK COMP
GL
DISTRIBUTABLES @ 10%
FARES/PARKING
SUBSISTENCE
SUBTOTAL DIRECT LABOR COSTS
GEN SUPT @ 15% OF LABOR
SUBTOTAL DIRECT LABOR COSTS
MATERIALS
SUBTOTAL LABOR & MAT.
WTGTT O.H. @ 10%
SUBTOTAL
WTGTT FEE @ 5%
PROPERTY DAMAGE @$2.20/$100
PERFORMANCE BOND
TOTAL COST
MATERIAL BREAKDOWN
MATERIAL COST $0.00
SETTING MATERIAL $25.00
SUBTOTAL $25.00
SALES TAX @ 7.125% $1.78
EQUIPMENT $0.00
FREIGHT & DEL $0.00
TOTAL MATERIALS $26.78
ST
3
$82.68
$9.06
$91.74
$54.36
$11.18
$6.03
$0.58
$8.27
$0.00
$0.00
$172.16
$25.82
$197.98
$26.78
$224.76
$22.48
$247.24
$12.36
$5.71
$7.96
$273.27
DATE: 09/21 /09
OT OT
0 0
$0.00 $0.00
$o.oo $a.oo
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
LABOR & MATERIAL BREAKDOWN
Labor Materials
Subtotal $197.98 $26.78
Overhead $29.70 $4.02
Subtotal $227.68 $30.80
WTG Fee $22.77 $3.08
Subtotal $250.44 $33.88
Prop. Damage $5.51 $0.75
Total Cost $255.95 $34.62
Breakdown for Billing -Tile, May 1, 2004
TERRAZZO
ILE INC.
o~
Contractors/Consultants for Terrazzo, Tile, Natural Stone and Industrial Floor Coating
September 21, 2009
Mr. F,arl "Doc" Smith
EDS BUILDERS, INC.
404A Saint Croix Trail North
Lakeland, MN 55043
Re: WTG Job #2-08-0203
Columbia Heights Public Safety Center -Bid Package 3
Bid Division CH3-09-3 Porcelain Tile
825 - 41St Avenue NE
Columbia Heights, MN 55421
Subject: Request for Change Order (r. #163}
Dear Mr. Smith,
As directed by you this past week, one of our personnel completed the installation
of 30 square feet (area 3'x10) of additional 18"x18" PT1 Floor the in room #163
`'Kitchen".
For this additional work we would appreciate receiving your add change order in the sum
of THREE HUNDRED TWENTY-SEVEN DOLLARS (+$32'7.00) as per the attached
breakdown.
Should you have any questions regarding the above please contact me.
& Tile, Inc.
Grazzini
/ Project Manager
WTG
Enclosures
-'rok:
an Equal Opportunity Employer i;;.,~n.;„p
755 East Cliff Road Burnsville, MN 55337 h®ne: (952} 746-9060 Fax: (952} 746-9059
WTG TERRAZZO & TILE, INC.
PROJECT #: 2-0$-0203
PROJECT: Columbia Heights Public Safety Center
REGARDING: Room #163
DIRECT LABOR HOURS
WTGTT DIRECT LABOR
TAXABLE FRINGES
TOTAL TAXABLE LABOR
UNION FRINGES
F.I.C.A./S.U.T.A./F.UT.A.
WORK COMP
GL
DISTRIBUTABLES @ 10%
FARES/PARKING
SUBSISTENCE
SUBTOTAL DIRECT LABOR COSTS
GEN SUPT @ 15% OF LABOR
SUBTOTAL DIRECT LABOR COSTS
MATERIALS
SUBTOTAL LABOR & MAT.
WTGTT O.H. @ 10%
SUBTOTAL
WTGTT FEE @ 5%
PROPERTY DAMAGE @$2.20/$100
PERFORMANCE BOND
TOTAL COST
MATERIAL BREAKDOWN
MATERIAL COST $112.86
SETTING MATERIAL $15.00
SUBTOTAL $127.86
SALES TAX @ 7.125% $9.11
EQUIPMENT $0.00
FREIGHT & DEL $0.00
TOTAL MATERIALS $136.97
ST
2
$55.12
$6.04
$61.16
$36.24
$7.45
$4.02
$0.39
$5.51
$0.00
$0.00
$114.77
$17.22
$131.99
$136.97
$268.96
$26.90
$295.85
$14.79
$6.83
$9.52
$327.00
DATE
OT
0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
09/21 /09
DT
0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
LABOR & MATERIAL BREAKDOWN
Labor Materials
Subtotal $131.99 $136.97
Overhead $19.80 $20.55
Subtotal $151.78 $157.52
WTG Fee $15.18 $15.75
Subtotal $166.96 $173.27
Prop. Damage $3.67 $3.81
Total Cost $170.64 $177.08
Breakdown for Billing -Tile, May 1, 2004