HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: July Operational Report
Date: July 28, 2009
COLLECTION PROJECTS
I.
Magazines
A. : Magazine labels were typed for newly received magazines.
ACL Weeding:
B. Last copies of materials within Workflows that Columbia Heights
owns the last copy of were found and withdrawn. Others were then used on the Book
Sale Cart.
Weeding:
C. Weeding of the nonfiction has been started and is continuing.
th
Paperback Orders:
D. A paperback order was completed July 8.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on July 17.
th
Air Fresheners:
B. Air Fresheners were replaced on July 17.
th
Fire Extinguishers:
C. Fire extinguishers were checked on July 17.
Public Works:
D. Public works came to the Library this month to work on a few
lingering projects. They fixed the drinking fountain in the lobby, they fixed the sink in
the main level Men’s Room, they replaced a few light bulbs in the lobby and in the Men’s
Room, and they took an old paperback spinner rack to the garbage.
th
Blinds Cleaning:
E. The Blinds where cleaned on July 16.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained and a weekly count of filled
requests has been up kept.
Paperback Display:
B. A Suspense/Romance themed paperback display was
maintained for this month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to staff for their records and/or use.
Bulletin Board:
D. The Bulletin board was maintained and cleaned this month.
Page Training:
E. Training of the newly hired Library Pages was done this month.
rg