HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: May Operational Report
Date: May 26, 2009
COLLECTION PROJECTS
I.
Magazines
A. : Magazine labels were typed for newly received magazines.
ACL Weeding:
B. Last copies of materials within Workflows that Columbia Heights
owns the last copy of were found and withdrawn. Others were then used on the Book
Sale Cart.
Weeding:
C. Weeding of the nonfiction has been started and is continuing.
th
Damaged Shelf:
D. The Damaged Shelf was cleaned May 6.
MAINTENANCE PROJECTS
II.
st
Security Gates:
A. Filters were cleaned on May 21.
st
Air Fresheners:
B. Fresheners were replaced on May 21.
st
Fire Extinguishers:
C. Fire extinguishers were checked on May 21.
Paperback Spinners:
D. The remainder of the Fiction paperback spinner labels were
printed. All of the Mystery paperback spinner labels have been printed and laminated.
Light bulbs:
E. A more thorough Light Bulb Inventory was completed to reflect up to
date inventory numbers but also locations for the lamps as well.
Carpet Cleaning:
F. Carpet Cleaning for the Library and Public Works is in the final
steps of scheduling.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained and a weekly count of filled
requests has been up kept.
Paperback Display:
B. A Regency themed paperback display was maintained for this
month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to staff for their records and/or use.
Bulletin Board:
D. The Bulletin board was maintained and cleaned this month.
rg