HomeMy WebLinkAboutResolution No. 2007-035RESOLUTION 2007-35
BEING A RESOLUTION ORDERING IMPROVEMENT AND
THE PREPARATION OF PLANS FOR ZONE 2 AND 3 STREET REHABILITIATION
CITY PROJECT 0702
WHEREAS, Resolution 2007-30 of the Columbia Heights City Council adopted the 26`" day of February,
2007, fixed a date for a Council hearing on the proposed improvement bounded by Reservoir Blvd on the
west, 37`" Avenue on the south, Stinson Blvd on the east and 45T" Avenue on the north, and Central. Avenue
an the west, 47`"/45`" Avenue on the south, Stinson Blvd on the east and corporate limit on the north,
AND WHEREAS, ten days' mailed notice and two published notices of the hearing a week apart were
given., and the hearing was held thereon the 19`" day of March, 2007, at which all persons desiring to be
heard were given an opportunity to be heard thereon.
WHEREAS, the Council determines to proceed with this local improvement, a portion of the cost being
defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA
HEIGHTS, MINNESOTA:
That the location and extent of such improvements is as follows:
FULL STREET RECONSTRUCTION
1. Ulysses Street, Johnson Street to Cul-de-sac
Work includes required utility reconstruction/repair, required water service repair, new
granular subbase if needed, new aggregate base, new concrete curb and gutter with driveway
aprons, new bituminous surfacing, required concrete or bituminous driveway and walk/step
replacement, sod restoration, miscellaneous construction items, and. appurtenances.
PARTIAL STREET RECONSTRUCTION
1. Tyler Street, 41ST Avenue to 42"d Avenue
2. Polk Street, 41st Avenue to 42"a Avenue
3. Hayes Street, 37'" Avenue to 41ST Avenue
4. Cleveland Street, 39`" Avenue to 40T}' Avenue and 41sT Avenue to 42"`t Avenue
5. McKinley Street 39'/z Avenue to 40~' Avenue
6. Fairway Drive, 49`'' Avenue to Fairway Drive
Work includes required utility reconstruction/repair, required water service repair, new
granular subbase if needed, ne=.nr aggregate base, spot replacement of curb and gutter with
required. concrete or bituminous driveway and walk/step replacement, new bituminous
surfacing, sod restoration, miscellaneous construction items, and appurtenances.
MILL AND OVERLAY
1. Polk Street, 42"d Avenue to 43`a Avenue
2 39T" Avenue, Cleveland Street to McKinley Street
3. 39'h Avenue, Cleveland Street to McKinley Street
4. Tyler Street, 49th Avenue to 50`" Avenue
Work includes required utility reconstruction/repair, spot replacement of curb and gutter with
required concrete or bituminous driveway and walk/step replacement, milling of existing
street surface, new bituminous surfacing, sod restoration, miscellaneous construction items,
and appurtenances.
2. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility
report.
3. Such improvement is hereby ordered as proposed in the Council Resolution adopted 26`h day
of February, 2007.
4. These improvements shall also be known as Project 0702 and P1Rs:
2007-Z2-02-001. for Full Street Reconstruction,
2007-Z2-03-001 anal 2007-Z3-03-001 for Partial Street Reconstruction, and
2007-Z2-44-001 and 2007-Z3-44-001 for Mill and Overlay.
5. The City Engineer, Kevin Hansen, is hereby designated as the engineer for this improvement.
The engineer shall prepare plans and specifications for the making of such improvement.
Adopted by the Council this 19`h day of March, 2007.
Offered by: Williams
Seconded by: Kelzenberg
Roll Call: Ayes: Peterson, Williams, Nawrocki, Diehm, Kelzenberg
CITY OF COLUMBIA HEIGHTS
~`~
~ Patricia Muscovitz, Deputy Cit
Mayor, Gary
~ ~.
7