Loading...
HomeMy WebLinkAboutResolution No. 2007-035RESOLUTION 2007-35 BEING A RESOLUTION ORDERING IMPROVEMENT AND THE PREPARATION OF PLANS FOR ZONE 2 AND 3 STREET REHABILITIATION CITY PROJECT 0702 WHEREAS, Resolution 2007-30 of the Columbia Heights City Council adopted the 26`" day of February, 2007, fixed a date for a Council hearing on the proposed improvement bounded by Reservoir Blvd on the west, 37`" Avenue on the south, Stinson Blvd on the east and 45T" Avenue on the north, and Central. Avenue an the west, 47`"/45`" Avenue on the south, Stinson Blvd on the east and corporate limit on the north, AND WHEREAS, ten days' mailed notice and two published notices of the hearing a week apart were given., and the hearing was held thereon the 19`" day of March, 2007, at which all persons desiring to be heard were given an opportunity to be heard thereon. WHEREAS, the Council determines to proceed with this local improvement, a portion of the cost being defrayed by special assessments under Charter provisions. NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA HEIGHTS, MINNESOTA: That the location and extent of such improvements is as follows: FULL STREET RECONSTRUCTION 1. Ulysses Street, Johnson Street to Cul-de-sac Work includes required utility reconstruction/repair, required water service repair, new granular subbase if needed, new aggregate base, new concrete curb and gutter with driveway aprons, new bituminous surfacing, required concrete or bituminous driveway and walk/step replacement, sod restoration, miscellaneous construction items, and. appurtenances. PARTIAL STREET RECONSTRUCTION 1. Tyler Street, 41ST Avenue to 42"d Avenue 2. Polk Street, 41st Avenue to 42"a Avenue 3. Hayes Street, 37'" Avenue to 41ST Avenue 4. Cleveland Street, 39`" Avenue to 40T}' Avenue and 41sT Avenue to 42"`t Avenue 5. McKinley Street 39'/z Avenue to 40~' Avenue 6. Fairway Drive, 49`'' Avenue to Fairway Drive Work includes required utility reconstruction/repair, required water service repair, new granular subbase if needed, ne=.nr aggregate base, spot replacement of curb and gutter with required. concrete or bituminous driveway and walk/step replacement, new bituminous surfacing, sod restoration, miscellaneous construction items, and appurtenances. MILL AND OVERLAY 1. Polk Street, 42"d Avenue to 43`a Avenue 2 39T" Avenue, Cleveland Street to McKinley Street 3. 39'h Avenue, Cleveland Street to McKinley Street 4. Tyler Street, 49th Avenue to 50`" Avenue Work includes required utility reconstruction/repair, spot replacement of curb and gutter with required concrete or bituminous driveway and walk/step replacement, milling of existing street surface, new bituminous surfacing, sod restoration, miscellaneous construction items, and appurtenances. 2. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. 3. Such improvement is hereby ordered as proposed in the Council Resolution adopted 26`h day of February, 2007. 4. These improvements shall also be known as Project 0702 and P1Rs: 2007-Z2-02-001. for Full Street Reconstruction, 2007-Z2-03-001 anal 2007-Z3-03-001 for Partial Street Reconstruction, and 2007-Z2-44-001 and 2007-Z3-44-001 for Mill and Overlay. 5. The City Engineer, Kevin Hansen, is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. Adopted by the Council this 19`h day of March, 2007. Offered by: Williams Seconded by: Kelzenberg Roll Call: Ayes: Peterson, Williams, Nawrocki, Diehm, Kelzenberg CITY OF COLUMBIA HEIGHTS ~`~ ~ Patricia Muscovitz, Deputy Cit Mayor, Gary ~ ~. 7