HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: March Operational Report
Date: March 31, 2009
COLLECTION PROJECTS
I.
Magazines
A. : Magazine labels were typed for newly received magazines.
ACL Weeding:
B. Last copies of materials within Workflows that Columbia Heights
owns the last copy of were found and withdrawn. Others were then used on the Book
Sale Cart.
th
Damaged Shelf:
C. The Damaged shelf was checked and cleaned up on March 12 .
rd th
Paperback Order:
D. Paperback orders was completed on March 3and March 19 .
Weeding:
E. Weeding of the nonfiction has been started and is continuing.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on March 12.
th
Air Fresheners:
B. Fresheners were replaced on March 12.
th
Fire Extinguishers:
C. Fire extinguishers were checked on March 12.
Paperback Spinners:
D. Additions to the existing paperback spinners were installed.
Fiction, Mystery, Romance and Westerns all saw an addition.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained and a weekly count of filled
requests has been up kept.
Paperback Display:
B. A paperback display was maintained for this month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to staff for their records and/or use.
Bulletin Board:
D. The Bulletin board was maintained and cleaned this month.
Statistics:
E. Statistics comparing the gatecount of this year in March to March of last
year were prepared for both the Library Director and the Children’s Librarian.
rg