HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: February Operational Report
Date: February 24, 2009
COLLECTION PROJECTS
I.
Magazines
A. : Magazine labels were typed for newly received magazines.
ACL Weeding:
B. Last copies of materials within Workflows that Columbia Heights
owns the last copy of were found and withdrawn. Others were then used on the Book
Sale Cart. A large number of Children’s materials were withdrawn this month.
th
Damaged Shelf:
C. The Damaged shelf was checked and cleaned up on February 4 .
rd
Paperback Order:
D. A paperback order was completed on February 3.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on February 19.
th
Air Fresheners:
B. Fresheners were replaced on February 19.
th
Fire Extinguishers:
C. Fire extinguishers were checked on February 19.
Light Bulbs:
D. An inventory of what kind and of how many light bulbs the Library
Currently has was taken this month..
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained.
Paperback Display:
B. Maintained a paperback display for the month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to employee’s for their records and/or use.
Bulletin Board:
D. The Bulletin board was maintained and cleaned this month.
Book Sale Cart:
E. The Book Sale was filled and cleaned this month. New books were
added to it.
rg