HomeMy WebLinkAboutResolution No. 2009-30RESOLUTION 2009-30
BEING A RESOLUTION ORDERING IMPROVEMENT AND THE PREPARATION OF PLANS FOR
ZONE 4 STREET REHABILITIATION CITY PROJECT 0902
WHEREAS, Resolution 2009-02 of the Columbia Heights City Council adopted the 12`h day of January,
2009, fixed a date for a Council hearing on the proposed improvement bounded by University Avenue on
the west, 48`h Avenue on the south, Central Avenue on the east and 53`d Avenue on the north,
AND WHEREAS, ten days' mailed notice and two published notices of the hearing a week apart were
given, and the hearing was held thereon the 2"d day of March, 2009, at which all persons desiring to be
heard were given an opportunity to be heard thereon.
WHEREAS, the Council determines to proceed with this local improvement, a portion of the cost being
defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA
HEIGHTS, MINNESOTA:
1. That the location and extent of such improvements is as follows:
FULL STREET RECONSTRUCTION
1. 5`h Street, 49`h Avenue to 50`h Avenue
Work includes required utility reconstruction/repair, required water service
replacement/repair, new granular subbase if needed, new aggregate base, new concrete curb
and gutter with driveway aprons, new bituminous surfacing, required concrete or bituminous
driveway and walk/step replacement, sod restoration, miscellaneous construction items, and
appurtenances.
MILL AND OVERLAY
1. 7`h Street, 52"d Avenue to 53`d Avenue
2. 48`h Avenue, Jefferson Street to Monroe Street
3. 50"' Avenue, Jefferson Street to Monroe Street
4. 51 S` Avenue, 6`h Street to 7`" Street
Work includes required utility reconstruction/repair, spot replacement of curb and gutter with.
required concrete or bituminous driveway and walk/step replacement, milling of existing
street surface, new bituminous surfacing, sod restoration, miscellaneous construction items,
and appurtenances.
WATER SERVICE REPLACEMENT/REPAIR
1. 5`h Street, 48`h Avenue to 49`h Avenue
Work includes documenting the material type of water services and operability of stop boxes,
required water service replacement/repair, spot replacement of curb and gutter with required
concrete or bituminous driveway and walk/step replacement, sod restoration, miscellaneous
construction items, and appurtenances.
Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility
report.
Such improvement is hereby ordered as proposed in the Council Resolution adopted 12`h day
of January, 2009.
These improvements shall also be known as Project 0902 and PIRs:
2009-Z4-02-001 for Full Street Reconstruction,
2009-Z4-44-001 for Mill and Overlay, and
2009-Z4-50-001 for Water Service Exploration.
The City Engineer, Kevin Hansen, is hereby designated as the engineer for this improvement.
The engineer shall prepare plans and specifications for the making of such improvement.
Adopted by the Columbia Heights City Council this 2na day of March, 2009.
Offered. by: Nawrocki
Seconded by: Williams
Roll Call: Ayes: Peterson, Williams, Nawrocki, Diehm, Kelzenberg
+f ~.....
t
Mavor Garv L. Pederson
(, ,,
~ _
~'~ ~_
~_._
(Patricia Muscovitz, CMC City Clerk-