Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 2165
2165 ~ ~ _ T~ r ..L. .. .a.. .~ d a _ .~ r g_ I ~ r ~~a -~- C"m ? --` where the basis ~~ ~y~aera is Tlt1 T ; AF~EE ENT made as of the Eighth day of December in the year Two Thousand Eight (In wards, indicate daV, tranntTz azzd year.) AbDITfONS AND DELETIONS: The author of this document has EET EEN the Owner: added information needed for its (Nazzze tazzd address') completion. The author may also have revised the text of the original City of Columbia Heights AIA standard form. An Additions and 590 40th Avenue Northeast Deletions Report that notes added Columbia Heights, MN 55421.-3878 information as well as revisions to the standard form text is available and the Cantractor: from the author and should be (Name and addres's') reviewed. A vertical line in the left margin of this document indicates Twin City Acoustics, Inc. where the author has added 2h55 Cheshire Lane North. necessary information and where Plymouth, NIN 55447 the author has added to or deleted from the original AIA text. For the following Project: This document has important Pegal (Include detcai.led deser•iptiorz ~f Rroject, loccztiuz2, address aaad sco~~e.) consequences. Consultation with an attorney is encouraged with respect Columbia Heights Pubhc Safety Center to its eompletian or modification. 825 41st Avenue Nc~rtl~east The 1992 Edition of AIA Document Columbia Heights, 1VIN 55421 A201/CMa,General Conditions of New Public Safety Center the Contract for Construction, Construction Manager-Adviser The Construction Nfanager is: Edition, is adopted in this document (Name artd address) by reference. Do not use with other general conditions unless this EDS Builders, Inc. document is modified. 404A Saint Croix Trail North Lakeland, NIN 55043 The Architect is: (Natzae and adda•ess) Buetow and Associates, Inc. 2345 Rice Street Suite 210 St. Paul. Iv1N 55113 Init. The Owner and Contractor agree as set forth below. AIA ~oc19P92@ra¢ AtOttf raA - #992. ~®ayris et O 1992 by The American institute of Architect. All rltt s re srved. AIA software at 14:19:31 on 01/19/2009 under Order No.100038b206_1 which expires on 1/19/2010, and is not for resale. User Notes: d~ This document was produced tsy 1 (835126732} AFFTI~LE 1 THE CE3NTI~ACT DEC ENT5 The Contract Documents cansist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions}, Drawings, Specifications, Addenda issued prior t<a execution of this Agreement, other docutnents listed in this Agreement and Modi~ficatiat7s issued after execution of this Agreement; these farm the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated. herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written ar oral. An enumeration of the Contract Documents, other than Modifications, appears in Article ~. ARTIDL 2 THE E3RK E3F THIS CE~NTACT The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others, or as follows: Section E}030() did Dfvisian CH3-(P9-6 Acoustic Ceilings ARTIDLE 3 DATE C}F ~ ENEPNET AND SUBSTANTIAL O PLETIC? 3.1 The date of commencement is the date from which the Cantract. Time of Section 3.2rs measured, and shall be the date of this Agreement, as first written shave, unless a different date is stated below or provision is made far the date to be fixed in a notice to praceed issued by the Owner. (hasert the date of cornTnenceTrTent, if zt diffeT°s from the date of this Agrc emerTt or, if applicable, state tl~aat floe date wall be,~.xed in a. notice Pt} proceed.} Unless the date of commencement is established by a notice to praceed issued by the Owner, the Contractar shall notify the Owner, through. the Construction Manager, in writing not less than five days before commencing the Work to permit the timely filing of mortgages, mechanic's liens and other security interests. § 3.~ The Contractor sh~l achieve Substantial Completion of the entire Wark not later than (Insert the calendar date or r2uTrzber of e~aleTrdaT~ days after the dtrte of cornrnerzceTrxetzt. Also insert aTTti= r•egttireTrTents for earlier SulastatatictZ CoTnpletzoaz of c:c~T-ta~in portions of tl2e Work, rf rzUt stated elsewdaer-e in~ tlTe CoTZtrczc~t ~t?CUt'T2F'tt1S. August 31, 2009 Portion of iNork Substantial Completion date , subject to adjustments of this Contract Time as provided in the Contract Documents. (ITtsert provlsioT~ts, if an_}=, ,far liquidated darnuges relating to,fcrilure to cot7rplete ora~ time. ) ARTICLE 4 CF3NTRACT SUM 4.1 The Owner shall pay the Contractor in current funds far the Contractor's performance of the Cantract the Cantract Sum of Forty-four Thousand Seven Hundred iVinety Dollars and Zet•o Cents ($ d4,790.00 ), subject to additions and deductions as p~•ovided in the Cantract Documents. § 4.2 The Contract Sum is based upon the fallowing alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State tfte n,u.Tnbers or• other t~derat%ftcatiora ~~f ac~repted alternates. If dc~cisi~ns cola other alt~rncates crre to lie tTrrz~ele 17y thr: Qwtl~er sttlTSequ~ent to the execution. af~ihis ~greetnent, attach a schedule of sucl2 other alternates showing the cz~tTTOesr2t for each an~c! tlTe date until ~vhiclz that aTTaott~r2t is t~ali~d. ) base Cantract Amount $44,810.00 Alternate #l4 -Deduct Section 086200 Unit Skylights and Section 086223 Tubular Skylights, roof and interior finishes accordingly. Deduct -($20.00) Init. A a ant 6dtr"!C tT~ - 1992. Copyright O 1 P~? by The American Institute of Architects,. l .rights reserYSed. ,, 2 a n . Thrs document was produced by / AIA software at 14:19:31 on 01!19/2009 under Order No.1000385206_i which expires on 1 /19!2010, and is not for resale. User Notes: (835128732) Total Contract Amount $44,790.00 § 4.3 Unit prices, if any, are c~ts follows: 13~~~sapti~ta Uttl~~ Pri~~ ($ O.d}~) ARTICLE 5 R~REES PAY EF6T § 5.1 used upon Applications for Payment submitted by the Contractor to the Construction Manager, and upon. Pa~oject Applications and Certificates for Payaneatt issued by the Construction Manager and Architect, the C}wner shalt make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract 1}ocuments. 5.2 The period covered by each Applicatiaat for Payment shall be one calendar month ending c>n the last day of the month, or as follows: 5.3 Provided an Application far Payanent is submitted to the Construction Maaaager not later than the Twenty-fifth day of a araonth, the C}wner shall make payment to the Contractor not Inter than the Thirtieth day of the following month. If an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Qwner not Inter than Sixty (60) days after the Construction Manager receives the Application for Payment. § 5.4 Each Application for Payment. shall be based upon the Schedule of Values submitted by the Contractor in accordance with the Contract f}ocuments. The Schedule of Values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such Enron and supported by such data to substantiate its accuracy as the Construction Manager ar Architect may a°equire. This schedule, unless objected to by the Construction Maarager or Architect, shall. be used as a basis for reviewing the Contractor's Applications for Payment. 5.5 Applications for Payment shall indicate the percentage of cc>anpletion of each portion of the Work as of the end of the period covered by the Application for Payment. 5:6 Suh~eet to the provisic,ns of the ("crntr;rct ~ncaatnents, the amount of each progress payment shall he computed as follows: ~ 5.6.1 Take that pardon of the Contract Sum. properly allocable to coatrpleted Wark as determined by multiplying the percentage completion of each partian of the Wark by the share of the total Contract. Sum allocated to that partian of the Wark in the Schedule of Values, tens retainage of Five percent (x.00°/n j. Pending final determination of cast to the fawner of changes in the Wark, amounts not in dispute may be included as provided in Section 7.3.7 of the General Conditions; 5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stared at the site far subsequent incorporation in the completed construction (or, if approved in advance by the Ownea•, suitably stored off the site at a location agreed upon in writing), less retainage of Five percent (5.00% }; § 5.6.3 Subtract the aggregate of previous payments made by the fawner; and 5.6.4 Subtract amounts, if any, for which the Construction Maa~tager or Architect has withheld ar nullified a Certificate far Payment as provided in Section 9.5 of the Generat Conditions. 5.? The progress payment amount determined in accordance with Section 5.6 shall be further modified under the following circumstances: (nit. ' Uoocsenent A#04lG ' Ts - 194 . Catsyri .:_ O i 992 by The Ams ;an {nstitute of Architects. - -- rights reserved. ~ ~, This documenf was produced by 3 / AIA software at 14:19:31 on 01/19/2009 under Order No.1000385206_1 which expires on 1!1912010, and is not for resale. User Notes: (835126732) § 5.7.'4 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Ninety- five percent { ~3~.0(1% ) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect detet•ines for incomplete Work and unsettled claims; and § 5.7.2 Add, if final completion of the Work is thereafter materially delayed through na fault of the Contractor, any additional amounts payable in <tecordance with Section x3.1(1.3 of the General Conditions. 5.~ Reduction or limitation of retainage, if any, shall be as follows: (lf it is intended, prior to Substantial Completio~a of the entire Work, to reduce or lifnit the retair~u~t,~e resulting frotrt the percentages inserted irr. Seclioras 5.6.1 anc15.6.2 above, and this is rust e.rplained elsewhere it the t/'otitraCa ~ocutraents, insert here prot~isiotrs for such reductiota or li;"ni~tr~ation.} A4~TI~LE 6 FINAL PA~'INENT Final payment, constituting the entire unpaid balance of the Contract. Sum, shall be made by the C}wner tc> the Contractor when {1}the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming Work as provided in Seetian 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessarily survive final payment, and {2} a final Froject Certificate for Payment has been issued by the Construction Manager and Architect; such final payfnent shall be made by the (3wner not more than 30 days after the issu~utce of the final Project Certificate for Payment, or as follows: After the contractor has satisfactorily completed all non-conformed work, fulfilled all final. close-out requirements in accordance with the Contract Documents. ARTICLE 7 ISCELLANEQ PE~C3VISIOS § 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 7,2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to trine at the place where the Project.ts located. ('fnsert rate of interest agreed upon, if any. ) At legal rate of interest as set by Minnesota Statutes. (Usury laws carad requirenrxents under the Federul Truth ira Letadirz~g Act, sirrailar state and local cvn~surner credit laws grad other regralatioras at the Clwner's ct~zd Contrac'tor's principal plct<'es of business, the location of floe Project arld elsewhere nzuy affect the validity of this provision. Legal a~dv%ce should be obtained with respect to deletions or rn~odificatioefs, and also regarding requirements such, cue writte~a disclosures or tivct%vers.) § 7.3 Temporary facilities and services: (Elere insert temporary facilities and se~vic:es whicl2 are different, frorn~ or ip~a addition to those included elsewhere i~ra Phe Contract I?ocurr~ents.) This contractor is responsible far all temporary facilities as identified in the Project Manttal; including but not limited to Inading, unloading, materials storage and protection, Layout, clean-up, hoisting, scaffolding, bracing, safety, barricades, guard rails, protection of Wctrk and surrounding Work, as specified. Location of site stored materials and. temporary facilities shalt be coordinated with the Construction Manager/Site Representative. § 7.4 Other Provisions: (Here list any special provisions affecting tl2e Contract. ) See Exhibit A, attached. Init. AIA Cfocument t4i/C- la T~ - 1992. ty~~, tght cU 1992 by The American institute of Architects. Aft rights reserved. ~`., 4 This document was produced try / AIA software at 14:19:31 on 01/19/2009 under Urder No.1000385206_1 which expires on 1/19/2010, and is not for resale. User Notes: (835126732) Dncutent Title Pages Division 0 Bidding and Contract 164 Requirements Division 1 General Requirements 38 § 9.'9.4 The Specifications are thczse contained in the Project Manual dated as in Section 9.1.3, at~d are as follows: (Eithet~ Zist t~/ae S/~eci~eati~~~as Izere or refer to cin exl~ihit ccttczctted to tdais A,~reer;~ent. J Seartierr~ Project Manual -Book One, Phase Three Project Manual, Book Two, Phase Three Title Pages Bid Packages as prepared by 331 Buetow and Associates, Inc. dated October 30, 2()08 Bid Packages as prepared by 305 Buetow and Associates, Inc. dated October 30; 2008 § 9.1.5 The Drawings are as follows, and are dated October 30, 2(}O8 unless a different date is shown below: (Er".tlze=r~ 1/st the L~rca~v€rags' /zere or refer to ttra ~xtarbit atEcrctaecP to tJus ft,~reerner7t. ) Number A0.0 C2 A2.1 A2.2 A2.3 A3. ]. A3.2 Ad.l thru A4.5 A4.6 and A4.7 A4.8 A49 A5.1 A6.1 and A6.2 Title Cover Sheet Paving Plan (for reference} Lower Level Floor Pian Main Level Floor Plan Mezzanine Floor Plan Building Elevations & Sections Building Elevations Wall Sections Stair & Elevator Sections & Enlarged Plans Stair Sections and Details Details & List of Abbreviations Enlarged Floor Plans Interior Elevations Date 9/26/2008 Init. AfA [9dcum rt B4tOt/Ct~a'~ -1992. Copy i at O ? 99? by The American Enstitute of Architects. ! r^~shts ret°-ved~ AIA software at 14:19:31 on 0 1 /1 912009 under Order No.1000385206_i which expires on 1 /1 91201 0, and is not for resale. User Notes: i nis document was produced by (835126732) 5 A6.3 Lobby Elevations & Enlarged Lobby Plans A6.4 Interior Elevations & Details A7.1 Lower Level Reflected Ceiling Plan A7.2 Main Level Reflected Ceiling Plan A7.3 Mezzanine Reflected Ceiling Plan A8.1 Door Schedule A8.2 Door and Frame Details F1.1 Lower Level Furniture Plan (for reference only) F1.2 Main Level Furniture Pian (far reference only) S 1 thru S 1 l Structural Steel MS1.1 Site Plan -Geothermal Vdelis and Plwnbing M 1.1 thru M9.1 Mechanical ES1 Site Plan -Lighting E1 thru Efi Electrical 9.1.6 The Addenda,. if any, are as follows: !dumber date Pages 1 11/191200$ 37 z 1llzolzoa8 ~ 3 11/25/2008 IS Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 C3ther documents, if any, forming part of the Contract Documents are as follows: (Litt here atzy additiort~al docurrterats wFzcch are intended tc~ fUrrn Part ~f the Carttract Dncutraents. Tlae General C`onditiarts provr~de that Uzddira~ requirern~ertts such cts advertisement or ira~~itatrnra to bzd, Irastr~ctetians to Bzdders, ~r~rpnplp fnt-rnc fcn~l tl?¢ C_'~Tt?Prtzrt~tr'_c hind rzrv nptPart nf'tl2e Cnt?trn~•t _I3nt~ttttrvttf,c uttlP.c,s ~'t7ttn2Pt-ated it1 t121.c Agreemerr~t. They should lie listed !acre only if intended to he Part of tlae Cntt~tr°act Z7vcumera~ts.) This Agreement entered into as of the day and year first written above. ... Gary Peterson, Mayo Date init. tktA ®ocearraerst A909/G~AaTM - 9992. Copyrit~ ~+O 1992 by The Amerir~n Institute of Architects. Afi rarrihts reserved. ~,ay i .This document was produced by ~ j AIA software at 14:19:31 on 01/19/2009 under Order No.1000385206_1 which expires on 1!19/2010, and is not for resale. User Notes: (835126732) I IT E P SI /C T CT T C I< ~IEIGgITS PUBLICS ~' CENE Id EIGHTS, I 1~ Within five (5) working days after award of the Contract, this Contractor must submit to the Construction Manager, a List of materials, products, equipment, materials suppliers and subcontractors they will use to perform their portion of the project. 2. Within five (5) working days and prior to starting work on site, this Contractor must submit Insurance Certificates for the project in the amounts detailed in Specification Section 00810 -Supplemental and Special Conditions to General Conditions of the Contract for Construction. The Owner, Architect, and EDS Builders shall be named as additional insureds. 3. Within five (5) working days after award of the Contract, this Contractor shall submit a detailed schedule showing material deliveries, major work items, working periods and projected completion of the contracted portion of the work. The Contractor's schedule shall be in accordance with Schedule Section 00210, unless otherwise noted in this agreement. 4. Within five (5) working days after award of the Contract, this Contractor shall provide a typed schedule of values on AIA Document G703 - Schedule of Values, with breakdown of material and labor as directed by the Construction Manager, and in compliance with Article 5.4 of this Contract. 5. Within five (5) working days after award of the Contract, and prior to beginning work on-site, this Contractor must submit its safety program to the Construction Manager for review. 6. Prior to beginning work on-site, this Contractor shall submit to the Construction Manager's site office, material safety data sheets for all applicable materials to be used on-site. 7. The Contractor shall coordinate its safety program with that of the other Contractors on the site as specified in the Contract Documents including all Government regulatory agencies having jurisdiction on this project. 8. Inclusions and/or exclusions noted in the Contractor's proposal are not included unless specifically stated in this agreement. 9. Contract Sum stated in Article 4.1 includes the cast of all necessary or required insurance, permits, sales tax (if applicablej, royalties, patents, etc. Z-(65 - T~ PROJECT (Nance. and address1: Columbia Ileighis Public Safety Center 825 41st Avenue i~iortheast Columbia Heights, T~1 55421. TO CONTRACTOR (Tame and addressi: "Twin City Acoustics, Inc. 2655 Cheshire Lane forth Plymouth, MN 55447 CHANGE ORDER NUMBER: 052 CH3- 09-6-1 INITIATION DATE: November 10, 2009 PROJECT NUMBERS: I3A 0806 / CONTRACT DATE: December 8, 2008 GONTRACT FOR: CH3-09-6 Acoustic Cei 1 ing~s OWNER: C~}NSTRUCTION MANAGER: ARGH!T!=CT: ~ CC3NTRACTQR: FIELD: ^ aTNER: Q THE CONTRACT IS CHANGED AS FOLLOWS: Supply and install ceilings in Rooms 159 clasat, 172, and l82 and mailings over stairwell A, upper and lower. Add $3,603.56 The original Contract Sum was Net changes by previously autharired Change Orders The Contract Sum prior to this Cha.ige Order vas The; Contract Sum will be increasa;cf by this (~'hange C)rder in the amount of Fhe ne6v C:antract Sum including this Change Order u%ill be The C<'intrac;t "Time will be unchanged byl.,aro ((?} days. I he date of Substantial Completion as of`the date of this t;hange C)rder therefore is 44,790.00 0.00 44,790.00 3,603.56 48,393.56 NOTE: This summary does not reflect changes in the Contract Sum. Contract Time ar C'3uaranteed Maximum 1'ric:e which have been autharirxd by Conseructian Change Directive. NOT ~fALID U IL SIGNED SY THE OWNER, CONSTRUCTION MA GER, ARCHITECT AND CONTRACTOR. P,17S I3utlders, hie Buetow and Associates, Inc. ARCHITECT (Firm name) 2345 Rice ~.- ~_, Suite 210, St. Paul, hr~N 55113 David Olds (Typed name] DATE: Citv of Columbia Heights OWNER (Firm name) 590 40th Avenue T~ortheast, Columbia Heights, MN 55421-3878 ADDRESS ~'~ BY (Signature) Walter Fehst ' (Typed name) DATE AIA Documettt G701lCMaT"" - 8992. Copyright O 1992 by The American institute of Architects. A!i rights reserved. rs Un ~ s AIA software at 14:32:44 on 11!10/2009 under Order No.1000385206_1 which expires on 01/1912010, and is not for resale. User Notes: ~ .. e or ~ This documenf was praduced by (1869566575) `Twin City Acoustics, Inc. CONT CTOR (Firm narrae) 2655 Cheshire Lane North, Plymouth, MN 55447 ~. Commercial and Residential An Equal Opportunity Employer TO: EDS Construction 404 A St. Croix Trail N. Lakeland, MN 55043 TWIN CITY ACOUSTICS, INC. 2655 CHESHIRE LANE NORT PLYMOUTH, MINNESOTA 55447 P)763.535.6697 + F)763.535.5309 www.tcacoustics.com DATE: September 29, 2009 PROJECT: Columbia Hts. Public Safety Bldg. Attn: Earl Doc Smith LOCATION: ADDENDUM: We propose to furnish and install the following materials for the above referenced project in accordance with the terms and conditions listed below and in accordance with the project plans and specifications unless noted. Labor, materials and equipment necessary for the installation is included unless specifically stated to the contrary. WORK ORDER #6790 (COPY ENCLOSED) ADD: $3,603.56 NOTE: Dumpsters, sweeping & final cleaning to be furnished by General Contractor at no cost to Twin City Acoustics, Inc. No seismic bracing or compression struts figured. Material, labor and sales tax included in our quote. This proposal is valid for 30 days from date of issue. TERMS: Net cash for 90% of value of materials delivered on the job and labor for installing materials for the job during the previous 30 day period; shall be due the l0a' of the following month, balance net cash after 30 days after completion. All taxes now or hereafter levied by any Federal, State or local. authority, upon sale of foregoing materials are not included in the price and shall be paid by the purchaser unless specifically stated otherwise in this proposal. Accepted by: Company Date: Order No. CUSTOMER'S ORDER NO PHONE MECHANIC HELPER STARTING DATE BILL TO / (ADDRESS ^ DAY WORK CITY ^ CONTRACT JOB NAME AND LOCATION ^ EXTRA JOB PHONE DESCRIPTION OF WORK ' ~ ~, , _ .. g ,~ r=, ' ~ ,^ ~' _'~',.~ ~ t .,. TOTAL WBOR ~ ~°...~ _ r + r _ ~' ~ ':~""~ FgEIGHT 3'`. TAX r ~_ DATE COMPLETED WORK ORDERED BY '~~~>~° l , ~ , -_. TOTAL AMOUN'f~ g? ,r T>~ ; Signature ^ No one home ^ Total amount due^ r ~ ~ m. ''E ^ Total billing to for above work: or be mailed after ' I hereby acknowledge the satislactory completion Completion of the above described work Of work Yr .l ~ ?' ^~ ~~ ~'°"' 404A Saint Croix Trail North ° Lai`eiand, Minnesota 55043 ° Phone: b51-436-2426 - ~~. -- 1821 University Avenue Suite 204-S St. Paul, Minnesota 55104 ° Phone: 651-998-0332 Fax: 651-436-3918 e-mail: info@edsbuilders.com ° www.edsbuilders.com FIELD ® E DATE: July 165 2009 FO #41 PROJECT: Columbia Heights Public Safety Center 825 415 Avenue NE Colurrsbia Heights, MN 55421 VENDOR: Twin City Acoustics -Mark 2655 Cheshire Lane l~torth Plymouth, MN 55447 Phone: 763-535-6697 Fax: 763-535-5309 CC: Dave Olds, Larry Pepin, Gary Gorman You are hereby authorized to execute promptly this Field Order directive per the enclosed description and all applicable provisions of the General, Supplemental, and Special Conditions; Addenda; and all other Contract documents. Supply and install lay-on ceiling and butt your ceiling up to sheetrock ceiling above shower in room 182, 8'-1" O.F.F. If you have any questions regarding this field order, please contact Doc Smith at 651-436- 2426 or 612-747-0976. ` Praj ect Mana er: ~~-= ~=-- ~ ' ~~C, ~`~ ~ ~ 1~ , - i~ Earl Doc Smith Date /~ , al~S" r ~ ~ " T~ -199 ... , ~ ,t ` : ~ ~_ ~;c~ - , - ~ ~ _ _ ~ g _ `'- _ - Construction Manager-Adviser Edrtian PROJECT: 1'Narrae arut address}: Columbia 1 leight~s Pttblic Safety Center 825 41st Avenue Northeast Coiurra~ria 1-Ieights, Iv1N 55421 TO OWNER: end addx~ss): C~j of Columbia 1leights 590 40th Avenue'Northeast t;olufnbia heights, fv1N 5542'1-3878 LATE OF tSUANCE: August 21, 200<} PROJECT NUMBER: SA 0806/ CONTRACT FOR: CH3-09-6 Acoustic Ceilings CONTRACT DATE: December 8, 2008 TO CONTRACTOR: (Name and address).• Twin City Acoustics, lnc. 2655 Cheshire Lane North Ptyrtsouth, MN 55447 PROJECT OR CtESONATEC PORTfON SHALL 6PICLUE: I3id Di~isi«n C'l-1>-09-6 Acoustic C'e'slin~s The Work. pcrfartns;d i ~. er this Contract has been rt viewed and t%7uncl, fa the Constrctction Ivlasaager's and rchitect's best knowledge, infar n~ ~ 1 nd `~:"lief to I ~ w '~stt- ~ ..'~ complete. Substantial C'oruplatian is the: stage in tl of"the Work when the 4tlork < • ~ 1 poi°t; -I ntly cornplete in accordance with the <'otltr<tct ' .1e Owner can tpy or utilize the Vv`ork for its int. _ d rase. "the date of Substtrtltial Completion of the Prctj>/et ar portion thereof E" ai, ~ , a' c ; ~ ~ _`~=y c:;tablislled t~cs ~, tern' ~ ` I, 200e1 evllicl~t is also the date aEc~>n1nle;ncen5ent ar applicable warranties ~ _ ed ` ~ ~;~a~' DEaeuments, excep a~~ F lo~~°: Warranty Cate of Commencement A li ~ "i _ ns , be completed or ecarrected is attached hereto. 'I"' "` .lure to include any items on such hst does neat alter the resf n " `the Contractoa° to ctatnplete all Work. in acca'c` ce '1 the C;antract Docrmlents. 1:DS €~ ., 1K1C, C~.g~l raa~CTECaeU MANAGER EY LATE a . _ ~ ,r l~uetau and Assc~s:iates, lttc. ~. •` ~Y"~ ~ ARa"..a-EITECT o r 1,~,,, l ~ t:rAT E . fhe ,~ ontractor en ~ or correct the Work ~,rn the list of items attached. hereto within ten days tr"orn the above date of Sub C'ompletic . Twin City Acoustics, Inc. _. CONTRACTOR BY ATE Fhe Cl~uner accepts the Work ar designated portion tllere;al`~s substantially catnplcte and ~~rilt assume ii111 possessiotl thereof at (tire) on {date}. ~ ~~ ,r;~" ~ , ~ ~"~ City caf Columbia 1-Ieights f ~ - ~g - i p GG~' " OWNER BY ', DATE AIA Document G7041CMaT"' -1992. Copyright G 1992 by The American Institute of Architects. , '1 ri " is reserved. "' ` _° "` " srsay r ! AIA software at 15:05:18 on 08/24/2009 under Ortler No.1000385208_1 which expires an 01/19/2010, and is not for resale. User Motes: r ,i o this document was produced by (19204882411 Z t ~,~ °~ __ ~. , ~ _ ray .~-... e _ . - . ~ , -- ~ _ -1992 e a d ~i l ~ _,e ' Construction Manager-Adviser Edition DATE OF ISSUANCE: August 2 }. 20f)t} PROJECT NUMBER: I3A 0806/ CONTRACT FOR: CH3-09-6 Acoustic Ceilings CONTRACT DATE: December 8, 2008 TO CONTRACTOR: (Name and address): Twin City Acoustics, Inc. ?655 Cheshire Lane North Plyrraauth, MI`1 55447 PROJECTOR DESIGNATED PORTION SIiALL INCLUDE: Bid. I}ivasion CI-I3-(}9-fr Acaustic Ceilings ARCFtETECT; CO~iTF~,CTOR. FIELD: OTNEEt: ^ The dark perfaraned Lander this Contract has been reviewed and toned, to the Caalstrucaion IVlanager"s and Architect's hest knawledge. infarmation and beliet; ta'nt~. substaaltiatty compictc. substantial C'otupletian is the stage in the progress aftite Wark when the lt~ark ar designated partian thereof is sut~ciesltty catnplete in accordance with the Contract Dt>cttrnents so the C7wTter cart occupy or utilize the ~Jork for its intended use. °I'he date of Substantial Completion of"the Project ar pardon thereon designated shave is hereby ~{ ~ ' ~,a,e,~ as Septealrbcr ? 1, 700q which is also tl~c date of coanme:ncement of appticabti; warranties required by the Contract 17 :un s, kept as stated Irc,low: SAlµrr~;•t4w~ Bate cf C~t~tt~tert~~t~t~fs~ A list of items to be completed ar ct>ra•ects:d is attas:hed hereto. The failure tt> il7ctudc any items on such List does not alter the responsibility anthe Contractor to complete all Work in accordance with the C;ttntract Docttmentrs. l=;l }S Bcaiiders, Inc. CONSTRUCTION MANAGER BY Btactavv and Associates, Inc. -- ARCI#ITECT .B .,,. i'he L'antractar will cotatp" 5ubstaatti<tt C.ompletian- DATE rr - $r~ ~" - 4 ~ ~? DATE ~ e - _ct the LVark an the list of"items rtttachc;d izi;reta within 1 _. I~Wln C.Ity AcflnstaCS, Itl4'. CONT CTOR . ~ BY The t~waler accepts the Mork ar designated portioa~ thereof as sulastanfially complete aa~d twill assume halt pt~ssessit>n the;reol'at (time) an {date). r l Citw of Cotun~baa I leights °~ ~ _ c.~ -- ! D ~e OWNER BY - DATE AIA Document G70+41CMaTM - fi992. Copyright ©1992 by The American Institute of Architects. P"t rtnhts reserved.' ~ s rtr s c€uit as ~ e AIA software at 15:05:18 on 08124/2009 under Order No.1000385208_i which e>gaires on 01/19/2010, and is not for resale. User Notes: owr~~ta: cor~sTl~ucTlar~ n~arlAt;~~: tit 1 the abtave date of ~., ~o. wr . . ac€ r saw. This document was produced by (1920488241) 1