Loading...
HomeMy WebLinkAboutContract 21512151 ~® Ft OJT made as of the Eighth day of December in the year Twa Thousand Eight (In words, ineliccrte dozy, nanntlz a~racl yc~ar••) ADDITIpNS AND DEtET10NS: The author of this document has E E the Owner: added information needed for its (Name czracf acltlr-ess) completion. The author may also have revised the text of the original City of Columbia Heights AIA standard form. An Additions and 590 40th Avenue Nartheast Deletions Report that notes added Caluanbia Heights, MN 55421-3S7S information as well as revisions to the standard form text is available and the Cantractor: from the author and should be (Ncrnze ar2d udclressJ reviewed. A vertical line in the left margin of this document indicates Daleo 12aoting 8a. Sheet Metal, Inc. where the author has added 1.5525 32nd Avenue North necessary information and where Plymouth, MN 55447 the author has added to or deleted from the original AIA text. r r ~° c~h~rt4 the basis ~f ~rrrttaf is ~ST1P(1 TES Cf For the following Praject: This document has important legal (Include detcz[ed clescri~atiotz cj ~-'rr~ject, toeratic3n, adclres.r ttrul sco~rc.} consequences. Consultation with an attorney is encouraged with respect Columbia Heights Public Safety Center to its completion or modification. S25 41st Avenue Northeast The 1992 Edition of AiA Document Columbia Heights, MN 55421. A201/CMa,Generai Conditions of New Public Safety Center the Contract for Construction, Construction Manager-Adviser The Construction Manager is: Edition, is adopted in this document (Narnn crud ar7tlr~ess) by reference. Do not use with other general conditions unless this EDS guilders, Inc. document is modified. 404A Saint Croix Trail North L.aketand, MN 55043 Init. The Architect is: (Name crrad acfclress} Buetaw and Associates, Inc. 2345 Rice Street Suite 210 St. Paul, MN 55113 The C°wzier and Contractor agree as set forth belaw. AIA Docutraen8 At01lC~__T~ - 1! 2. Copyrig C°7 1992 by The American Institute of Architeots. AtS ric its resented. This dooument was produced by 1 / AIk software at 14:02:33 on 12/22/2008 under Order No.1000380482_1 which expires on 12/4/2009, z of for resale. User Notes: (365791 1 1 82) AI?TICLE ~ THE CGT T DE3~U ENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions}, Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Ivlodifieations issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than It~Iodifications, appears in Article 9. ARTIDLE 2 THE t}I6 C9F THIS f3NTRACT The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others, or as follows: Section 0030(} Bid Division CH3-07-1 Roof System ARTICLE ~ DATE rJF GO~I~IENCE~IENT AND SUESTANTIAL COiNPLETION 3.'1 The date of commencement is the date from which the Contract Time of Section 3.2 is measured, and shall be the date of this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the dute of~eornrnencerrrerr.t, if'it differs fr-atn Che date ~~'this Agreement ot; i~ap~rlirahle, state drat the date will lie fixed in a r2rrttice to Israceed. ) Unless the date of commencement is established by a notice to proceed issued by the Qwner, the Contractor shall notify the Qwner, through the Construction Manager, in writing not less than five days before commencing the Work to germit the timely filing of mortgages, mechanic's liens and other security rote-rests. § 3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than (Insert the calerida~r date or rzurnber of calendar day's after the date v{~e~ainrnen~cenient. Also in~ser-t array r~e~aireirierats far earlier SrrF~staritial Corr¢pletio»~ of certai~rz partinits of the Work, if iicrG stated elsewhere irr the Contract I~acurrients. J August 3 } , 2009 Portion of iNork Substant"sal completion date subject. to adjustments of this Contract Tirne as grovided in the Contract Documents. (Inserthr-uvisi~aras, tf•ar~ry~, f€7r llgaai~dated dccrna~es r-elatr~rag trr jieilurc to carralrle~t~ crrz tirpre.) ARTIdrLE 4 CC?NTRACT SUOV~ 4.1 The (9wner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of Three Hundred Twenty Seven Thousand Eight Dollars and Zero Cents ($ 327,(}08.00 }, subject to additions and deductions as provided in the Contract Documents. § 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Qwner: (State the it~arnbers or atlaer• itleritification of aece~ted alterr~iates. If decisions on. nther• alternates czre t~~ Ue Tirade by the f~wraer sabsegtierit to the execatiotx crf this Agreen~tent, attach a schedule of sueli rather alternates slrrrwirig the amount for each cirid the date until which drat arraoirrzt is valid. Base Contract Amount $335,008.00 Alternate #14 -Deduct Section 086200 Unit Skylights and Section 086223 Tubular Skylights, roof and interior finishes accordingly. Deduct -($ 8,000.00} Total Contract Amount $327,008.00 Init. A6A d}ocuenent AtotlGi °PA - 1992. ~ogxyright O i 992 bd The Ameri~~n Enstit e of Architects. lk61 rights reserved. s. ~ n~ r. This document was produced by / AIA software at 14:02:33 on 12/22/2008 under Order No.1000380482_1 which expires on 12/4/2009, and is not for resale. User Notes: (3657911182) § 4.3 Unit prices, if any, are as follows: Dscrlti~tt Unfits Pri~~ ~ Q.bO} ~€tT9CL 5 ~13E5 YI~IdT 5.9 Based upon Applications for Payment submitted by the Contractor to the Construction Manager, and upor€ Project Applications and Certificates for Payment issued by the Construction Manager and Architect, the Owner sha11 make progress payments on account of the Contract Suan to the Contractor as provided below and elsewhere in the Contract Documents. § 5.2 The period covered by each Application for Payment sha11 be one calendar month ending on the Inst. day of the month, or as follows: § 5.3 Provided an Application for Payment is submitted to the Construction Manager not later than the Twenty-fifth day of a month., the Owner shall make payment to the Contractor not later than. the Thirtieth day of'the following month. If an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner not Later than Sixty { 60 }days after the Construction Manager receives the Application for Payment. 5.4 Each Application far Payment shall be based upon the Schedule of Values submitted by the Contractor in accordance with the C€>ntract Documents. The Schedule of Values sl~ali allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager or Architect may require. This schedule, unless objected to by tl~e Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. ~ 5.5 Apphcatians for Payment. shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payanent. 5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: § 5.6.9 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the Schedule of Values, less retainage of Five percent (5.00% }. Pending final determination of cost to the Owner ol` changes in the Work, amounts not in dispute may be included as provided in Section 7.3.7 of the General Conditions; § 5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stared at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a locati€}n agreed upon in writing), Tess retainage of Five percent (5.00% }; § 5.6.3 Subtract the aggregate of previous payments made by the Owner; and 5.6.4 Subtract amounts, if any, for which the Construction Manager or Architect. has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions. § 5.7 The progress payment. amount determined in accordance with Section 5.6 shall be further modified under the following circumstances: § 5.7.9 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Ninety- five percent (95.00% ) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete Work and unsettled claims; and ,4fA t3occ~rtaent A'tOt/C aT~ - 13 2. t;opyrigtst O 1992 by The American Institute of Architects, I ! riahi, reserved. Init. This document was produced t;y 3 / AIA software at 14:02:33 on 12/22/2008 under Urder No.1000380482_1 which expires on ~ 2/4/2009, and is not for resale. User Notes: (36579111821 § 5.7.2 Add, if final completion. of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions. § 5.~ Reduction or limitation of retain<~tge, it any, shall be as follows: (!f it is intended, prior to Substantial Cntnpletinn of the enure W©r•k, to redacce or lirzzit the r~tae.tzc~ag~ resultfn~ from tlae percentages inserted rra Seetiozzs 5.6.1 and 5.6.Z abos~e, arzd tdzis i.g not e.xplczined elsewhere iez, tlae Cnntract I7acunzents, insert laer•e prnvisioazs for su~clz z-eductintz nr liznitatian. } ARTICLE fi FINAL PAl(ENENT Final payment, constituting the entire unpaid balance of the Cantract Suan, shall be made by the Owner to the Cantractor when (l }the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconfssrming Work as provided in Section 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessarily survive final payanent; and f2} a final Project Certificate for Payment has been issued by the Construction Maa~ager and Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the final Prcaject Certificate for Payment, or as follows: After the contractor has satisfactorily completed all non-conformed work, fulfilled all final close-out requirements in accordance with the Contract Dc>cttments. ART6CLE 7 I~CELLANECUS PRC~ISION § 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment i` due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (insert rate nf~interest agreed upnn, if an}~.) At legal rate of interest as set by Minnesota Statutes. (Ustr,iy laws azad regairerraents under ttze Federal Truth in Lezzdirzg Act. similar state and local cansurnc>r c relit laws a~zzd other regulations at the Owner's and Contractor`s principal Places of business, the lncatinn of tdze Project arzd elsewhere .rnnv ~%fe€-t the ~~<riz~3iiv of tlzi,w• nrnt>i cantz. T.~>~al advice .sTznttld be ohitxitzc>d witl2 re.snect to deletotzs or trzodi~catiozzs, and also regarding requa:retrzents such cr~s writlett. disclasur-es or waivers.) § 7.3 Temporary facilities and services: (Hc>re insert tetn~porary facilities and services wlaic`lz urc: different front nr in addition to tlanse included elsewdzere in the Cantract!)ncurnents.} This contractor is responsible for all temporary facilities as identified in the Project Manual; including but not limited to loading, unloading, materials storage and protection, layout, clean-up, hoisting, scaffolding, bracing, safety, barricades, guard rails, protection of Work and surrounding Work, as specified. Location of site stored materials and temporary facilities shall be coordinated with the Construction Manager/Site Representative. § 7.4 tither Provisions: (Here list cr~n}~ special prnvisinns affecting fife ~~nntract.) See Exhibit A, attached. ARTICLE ll TER IATICN UP~ICN .1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. Init. ABA U®eurroent A' IC:..aTr° - 1992. Cc ~6st Q 1992 by The American institute of Architects. All rt^fifs reserved. I nis ~,ocument was produced by 4 / AIA software at 14:02:33 on 12/22/2008 under Order No.1000380482_1 which expires on 12/4!2009, and is not for resale. User No4es: (3857911182} .2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions. Descu@ent Title Pages Division 0 Bidding and Contract 164 Requirements Division 1 General Requirements 38 9.1.4 The Specifications are those contained in the Project Manual dated as in Section 9.1..3, and are as follows: (Edth~er list t{ze Spec~ifcatiait~s here or refer to ata exhiF~it uttc~clzed tv this Agreerr~zen~t.) Section Project Manual -Book One, Phase Three Project. Manual, Book Two, Phase Three Title Pages Bid Packages as prepared by 331 Buetow and Associates, Inc. dated October 30, 200$ Bid Packages as prepared by 305 Buetow and Associates, Inc. dated October 30, 2(}08 9.1.5 The Drawing:; are as follows, and are dated October 30, 2008 unless Gt different date is shown below: (dither last the Drr~wirxgs here or refer to a~rz exhibit czttacFzed to this Agreement.) Nurrtber Title Date A0.0 Cover Sheet C2 Paving Plan (for reference) 9/26/2(}08 A2.1 Lower Level Floor Plan A2.2 Main Level Floor Plan A2.3 Mezzanine Floor Plan A3.1 Building Elevations & Sections A3.2 Building Elevations A4.I thru A4.5 Wall Sections A4.6 and A4.'1 Stair & Elevator Sections & Enlarged Plans A4.8 Stair Sections and Details A4.9 Details & List of Abbreviations A5.1 Enlarged Floor Plans A6.1 and A6.2 Interior Elevations A6.3 Lobby Elevations & Enlarged Lobby Pions A6.4 Interior Elevations & Details A7.1 Lower Level I2~~flect~~d Ceiling Init. A@A C?ocurrsent f 011C6~eT~ - 1992. ~opyr6ght O 1992 by The Institute of Architects. A@@ r@r s reserve€t mex rei , This document was produced by 5 ~ AIA software at 14:02:33 on 12/22/2008 under Order Na.1000380482_1 which expires on 12/4/2009, and is not for resale. User Notes: (3657911182} Plan A7' Main Level Reflected Ceiling Plan. A7.3 Merranine Reflected Ceiling Plan A8.1 Door Schedule A8.2 Door and Frame Details El.l Lower Level Furniture Plan (for reference only) F1.2 Main Level Furniture Pian (tor reference only) S 1 thru S'1 I Structural Steel MS 1.1 Site Plan -Geothermal Wells and Plumbing M1.1 thru M9.1 Mechanical ES1 Site Plan -Lighting EI thru E6 Electrical g.1.6 The Addenda, if any, are as follows: Nttr~b~r ~at~ Pages 1 11!19/2008 37 2 11 /20/2008 1 3 11 /2S/2008 I S Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are afro enumerated in this Article ~. § 9.x.7 C3ther documents, if any, forming part of the Contract Documents ~u'e as follows: (Lzst here carry additdorr~ad cdocaanerats which are irrtencded to fortrr part c?f tlae Contract noeaarr~tentr. The Geraercad Carzeditions provicde that diiddirrg rec/uzrerrrents such cxs actvertiscrraerat or inhi~rcztior~, to hied, Irrstrtrctxans~ to Bidders„ sarr2pde forms crracd the Corrtrcrctor's bid are ~zot part c?f the C'or7traca I~c~rcunxer~ts crraless era~cmeratecd in this Agreerrren~t. Thee shoaled be listecd daere only if irrtendecd to he part of the Coratrac`t Docarr~tents.) This Agreement entered into as of the day and year first. written above. ~~~ ~ ~ i 1,.~ ~, ~.~:~ _~ .~ Gary Petet•san, Init. A! )a~umerat A10i/C ~ ~ - f 91 . Goisyright O 1992 by The American institute of Architects. ~ ria ' reset°°*d. n € _ e r / AIA software at 14:02:33 on 12/22/2008 under Order No.1000380482_1 which expires on 12/4/2009, and is not for resale. User Notes: This document was produced by (365791 1 1 82} I IT T E T E /C T ~T T L IiEIGgIT I'iT~I.IC S Y CE TE I.IT IiI TS, IIEi T 1. Within five (5} working days after award of the Contract, this Contractor must submit to the Construction Manager, a list of materials, products, equipment, materials suppliers and subcontractors they will use to perform their portion of the project. 2. Within five (5} working days and prior to starting work an site, this Contractor must submit Insurance Certificates for the project in the amounts detailed in Specification Section 00810 -Supplemental and Special Conditions to General Conditions of the Contract for Construction. The Owner, Architect, and EDS Builders shall be named as additional insureds. 3. Within five (5} working days after award of the Contract, this Contractor shall submit a detailed schedule showing material deliveries, major work items, working periods and projected eorrapletion of the contracted portion of the work. The Contractor's schedule shall be in accordance with Schedule Section 00210, unless otherwise noted in this agreement. 4. Within five (5} working days after award of the Contract, this Contractor shall provide a typed schedule of values on AIA Document G703 - Schedule of Values, with breakdown of material and labor as directed by the Construction Manager, and in compliance with Article 5.4 of this Contract. 5. Within five (5} working days after award of the Contract, and prior to beginning work on-site, this Contractor must submit its safety program to the Construction Manager for review. 6. Prior to beginning work on-site, this Contractor shall submit to the Construction Manager's site office, material safety data sheets for all applicable materials to be used on-site. 7. The Contractor shall coordinate its safety program with that of the other Contractors on the site as specified in the Contract Documents including all Government regulatory agencies having jurisdiction on this project. 8. Inclusions and/or exclusions noted in the Contractor's proposal are not included unless specifically stated in this agreement. 9. Contract Sum stated in Article 4.1 includes the cost of all necessary or required insurance, permits, sales tax (if applicable}, royalties, patents, etc. ~ ! `~ ~ r~ r i r~ i r i PROJECT (Narr~~e and address): Columbia Heights Public Safety Center &25 4I st Avenue Northeast Columbia Heights, MN 55421 TO CONT CTOR (Marne anrt address): Dalco Roofing c4r Sheet Metal, hte~. 15525 32nd Avenue North Piymouih, MN 55447 CHANGE ORDER NUNIEER: 01.4 CH3- 07-1-1 INITIATION DATE: March 06, 2009 PROJECT NUMBERS: BA 0806 P CONTRACT DATE: December 08, 200x CONT CT FOR: CH3-07-I Roof System CJ~tiNER: ~ GC}NSTRIJGTIC7N MANAGER: ~ ARGHITEGT: ~ G~?!~!TRAGTDR: ~ FIEL.I~: ^ oT~ER: ^ THE CONT CT IS CHANGED AS FOLLOWS: Eliminate Dens Deck. at Apparatus Bay. Deduct 2" of insulation front 6" thickness to 4" thickness on Apparatus Bay sold modification of tapered insualtion, average overall 8-value is 821.95. Install Type I d fens in lieu of Type `JI felts. Seduce itrosulation back slope due to ttrooving of drains to just outside of pavers on Apparatus Bay Total Deduct -51.6,500.00 The original Contract Sum was Net change by previously authorized Change Os-ders The Contract Sum prior Co this Change OtzIar was The Contract Sum will be decreased by this Change Order in the amount of The new Contract Suzn including this Change Order will be The Conh~aat `Time will be increased by Zxa-o ! 0 ) days. The date of Suhstarottial Cornpletir?n as «f the date of this C'hattge Order therefore is 327,008.00 O.UO 327,008.00 16,500.00 3l 0,508.00 NOTE: 'T'his summary does not. reflect. changes in the Contract Sum„ Contract Time ar Guaranteed Maxintutn Price which have been authorized by Construction Change Directive. NOT ~/ALID UNTIL SIGNED DY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR. EDS Builders, Inc. (Tvped rzanae) DINE: Dalca Roofing 8z Sheet Metal Inc (Typed name) DATE: Buetow and Associates, Inc. Citv of Columbia Heights (TVPed name) DATE: AIA Clocument C,701tCaT"' -1992. Copyrig6at ©1992 by The American Institute of Architects. AEf rig9r#s reserve' pr~w ~ ~ ma ! ~~ AIA software at 14:04:17 on 03/06/2009 under Order No.1000385206_t which expires on 1 /19/2010, and is not for resale. User Notes: Deduct -$4,764.00 Deduct -56,881..00 Deduct-52,824.00 Deduct -$2,(731.00 ' ~ 1 i nis document was produced by (442394569) Doc- Per your request, here are the deducts you had asked about. Deduct #3-Deduct 2" of insulation from 6" thickness to 4" thickness aN Apparatus Bay and ~ aaodificatfon of tapers iasulatio .Total average -Value before deduct -3 .37, total average R-value after deduct 21.95. TTAL EDUCT ~ FRM BASE BID: $6,881.0 Deduct #4-Install Type I`V felts in lieu of Type VI felts. We will have to get a variance from the manufacturer due to the fact that most manufacturer's require Type VI felts fora 20 year warranty. This should not be a problem, but manufacturer has final say: :'.-F~ =~! TOTAL DEDUCT #4 FROM BASE BID: $2,824.00 Respectfully submitted, rti(/ Mark Raell Project Manager/Estimator ~tJ13JL<;(~'I~/YR~}JECTD IJE®UC`I' P CING FAR F°i7LIC S TY CELT COLUMBIA HEIGHTS, N 1'4T'AL MJMBER OF PAGES A1CLtJDII~dG COVER LETTrcR; P If you do n©t receive all of the pages, please call us? D®C- Per your request, here is the additional deduct you requested. Deduct #6-Reduction in insulation bask stops due to moving of drains to just outside of pavers on Apparatus Bay. T®TAL DEirTC'Y' #6 FRt)N[ BASE BID: $2,031.Q0 Also, I have not heard from the manufacturer about removing the Dens Deck and still achieving the twenty minute flame spread. I have called the GAF representative and left a message with him, and I ~$rill forward the findings via email or phone call to you. Respectfully submitted, Mark Roell Project Manager/Estimator doc~aedsconsultants.cam II~C~% Message Page I of I From: "Larry Pepin" <Larry.Pepin@ci.columbia-heights.mn.us> Subject: Re: New ComCheck for Coiumbia Heights Public Safety '~! Date: Thu, 19 Feb 2009 13:19:27 -0600 ~.®. "David Olds" <david_olds@buetowarchitects.com>, "Gary Gorman" <Gary.Gorman@ci.columbia- heights.mn.us>, "Doc Smith" <doc@edsbuilders.com> The new ComCheck report was reviewed and is accepted. The elimination of the Denz Deck over the apparatus bay and application of a Class A roofing system is also reviewed and allowed. If you have any questions please contact me. Lawrence (Larry) R. Pepin Building Official #2379 City of Columbia Heights 590 40th Avenue NE Phone (763}706-3677 Fax (763}706-3671 larry.Pepin@ci.columbia-heights.mn.us °'Dedicated to safety in the built environment°` »> David Olds <david olds@buetowarchitects.com> 2/17/2009 10:57 AM »> Larry, There is a upcoming change order to reduce the insulation over the metal deck at the apparatus bay area. The R value would be reduced to 21.95. You had asked for a ComCheck report showing that we still pass code. Please find attached the ComCheck report showing we still pass code by 3%. If you see any problems with this change please let me know. Thank you for your help, David P. Olds, AIA BUETOW AND ASSOCIATES 2345 Rir_e Street, suite 210 St. Paul, Minnesota 55123 651 483-6701 http: //mail. usmac.net/Session/29039-LFyMNZcOyE6GeYDgctZf/Message.wssp?Mailbox... 2/20/2009 dac~edscansultartts.cam II~BD~ Message From: MRoell@dalcoroofing.com Subject: FW: IJL Class A listing for Cloumbia Heights Public Safety Center Date: Tue, 3 Feb 2009 15:02:08 -0600 To: doc@edsbuilders.com, david_olds@buetowarchitects.cam Ctavid/I~oc- J ,`~~' This was forwarded to me from GAF Technical Servioes. Hope this is what you are looking for. This infa is readily available to you at .ul.com. Look under Certifications (Upper Left Hand Side of Page}. Under "Beg"rn a Basic Search", at the line that says "UL file " type in R13U6. That will get you to GAF's assemblies. Click on "TGFU.1306". That should get you to all of GAF Fire Tested Ratings. fVlark Roell Dalco Roofing And Sheet f~letal, Inc. 612-49ft-1555 From: Killman, Sadie [mailto:skillman@gaf.com] Sent: Tuesday, February d3, 2009 2:54 PM 1"0: mroeil@dalcoroofing.com Subject: UL Class A listing Mass ~i 1. Deck: C-1.5/32 Incline: 3 Insulatian (Optional): -One or more layers perlite or wood fiber or glass fiber or polyisocyanurate or urethane or perlite/polyisocyanurate composite or perlite/urethane composite or wood fiber/polyisocyanurate composite or phenolic, any thickness. Ply Sheet: -Three or more plies Type G1 or "GAFGLAS Ply 4" or "Tri-Ply Ply 4" or "GAFGLAS Ply 6" hot mopped. Surfacing: -Gravel. Page 1 of 2 http://mail.usmac.net/Sessian/28224-Dzapa0B8mjz5 aa`r41vAkI/Message.wssp?ailbax=Il`~T... 2/3/2009 doc aedsconsultants.co INBGX Message Page 2 of 2 This email, including any attachments, is for the sole use of the intended recipient(s), and may contain information that is confidential or legally protected. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information or any attachments is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender by return e-mail that you have received the message in error and delete it along with any attachments. GAFMC makes no warranty that this e-mail is error or virus free. This email has been scanned by the MessageLabs Email Security System. For more information please visit http:// .messagelabs.com/email This email has been scanned by the MessageLabs Email Security System. For more information please visit http://www.messagelabs.com/email http://mail.usmac.net/Session/28224-DzapoOB 8mj z5 aG41vAkI/Message.wssp?Mailbox=IN... 2/3 /2009