Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 2147
2147 r i, ~ r r r ...-__ _,__ r r r when ~ ei of py~rer~~ ~s ~ T~t~LT Cl P,RE ENT made as of the Eighth day of December in the year Two Thousand Eight (Ita wards, eradicate day, iPanntla and year.) ADDITIONS AND DELETIONS: The author of this document has SET EE the Cwner: added information needed for its (Naaaae caracl raddres.s) completion. The author may also have revised the text of the original City of Columbia Heights AIA standard form. An Rdditions and 59'0 40th Avenue Northeast Deletions Report that notes added Columbia Heights, MN 55421 -347g information as well as revisions to the standard form text is available and the Contractor: from the author and should be (Name aaad address) reviewed. A vertical line in the left margin of this document indicates Crosstown Masonry, Inc. where the author has added 1322 159th Avenue NE necessary information and where Ham Lake, MN 55304 the author has added to or deleted from the original AIA text. For the following Project: This document has important legal (Iaaclude detailed description of r'~rajec•t, location, address c€nd scope.) consequences. Consultation with an attorney is encouraged with respect Columbia heights Public Safety Center to its completion or modification. 825 4lst Avenue Northeast The 1992 Edition of AiA Document Columbia Heights, MN _55421 A201/CMa,General Conditions of New Public Safety Center the Contract for Construction, Gonstruction Manager-Adviser The Construction Manager is: Edition, is adopted in this document (Narrae ccnd addre ss') by reference. Do not use with other general conditions unless this EDS Builders, Inc. document is modified. 404A Saint Croix Trail North Lakeland, MN SSU43 Init. The Architect is: (Name arad address) Buetow and Associates, Inc. 2345 Rice Street Suite 210 St Paul, MN 551 I3 The Owner and Contractor agree as set Earth below. AEA f~ocurn~ A101/Carry - 1992. o fright O 1992 by The American 4nstitute of Architects. AtI ri~Pets reserves i AIA sottware at 14:23:14 on 12/18/2008 under Order No.1000380482_i which expires on 12/4/2009, and is not for resale. User Notes: This document was produced by 1 (988380770) ARTICLE 1 THE CANT CT DCDCU ENTS The Contract Documents consist. of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions}, Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution caf this Agreement; these farm the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations ar agreements, either written ar oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE ORK dF THIS CQNTRACT The Contractor shall execute the entire ~Tork described in the Cantract Documents, except to the extent specifically indicated ifl the Cantract Documents to be the responsibility of others, or as fellows: Section (}0300 Bid Division CH3-04-1 Masonry ARTICLE 3 DATE OF COM ENCMENT ANC SUBSTANTIAL CD PLETIf3N § 3.1 The date of commencement is the date from which the Contract Time of Section 3.2 is measured, and shall be the date. of this Agreement, as first written above, unless a different date is stated below ar provision is made tar the date to be fixed in a notice to proceed issued by the Owner. (Ir9sert the dote ~f carnm~en~cernerrt, if it differs frt~m~ the date of dais Agreement or, if applieabCe, state that the date will be fixed ir9~ a n~at%ce to proceed.) Unless the date of commencement is established by a notice to proceed issued by the Owner, the Contractor shall notify the Owner, through the Construction. Manager, in writing nat. less than five days before commencing the iVark to permit the timely filing of mortgages, mechanic's liens and other security interests. § 3.2 The Contractor shall achieve Substantial Completion of the entire Wark net later than ( }days after the Date of Commencement. (Insert the caterarlar date or number pf~~calendcrr days after the date of corrrrnertcement. Also insert arty rec~rrirernetrts ,far earlier Substantial Campletic~ra cif certain portions of tke Work, i f not stated elsewhere irz the ~`outract Documents. ) Portion of Work Substantial Completion date subject to adjustments of this Contract Time as provided in the Cantract Documents. (Insert provisions, i, f a~n}~, ./ar liquidcztcd danu~ges reda~tzng to, fai~lcr.re tc3 corr2~plete on. tirrae. J ARTICLE 4 Cf3NTRACT SUfI~ 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum. of One Million Eighty-five Thousand Dollars and Zero Cents ($ 1,085,000.00 ), subject to additions and deductions as provided. in the Contract Documents. § 4.~ The Cantract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the r2umbers or arl2er iderrti~c~a~tiorr~ crf crcc:epted alternates. If decisions orx other alternates are to be made b~~ the f~wn~er subsequent to the execution of this Agreerner~t, attach a schedule of'suclr, other alterrrcrtes showing the amount for each and the date until whicl2 Hurt amount is valid. ) Init. AiA t)ocurnent &' 9(CBAeT~ - 9992. Copyright E~J 1992 by The American Institute of Architects. All rights reserved. =y ~ right t.av~ f ed rr 2 Wray r~ ara~ ed ao t w .This document was produoed by / AIA software at 14:23:14 on 12/18/2008 under Order No.1000380482_i which expires on 1 2/412 0 0 9, and is not for resale. User Notes: (988380770) 5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.'10.3 of the General Conditions. § 5.8 Reduction or limitation of retainage, if any, shall be as follows: (If it is irxter2tled, pri.vr to Srtbstan.rial Completion of the entire 1R~ork, tv reduce= c7r larrzit the retaarxage resadti7tg fra7n the percer~atages inserted in Sectiora~s 5.6.1 and 5.6.2 ctbc~l)e, aazd this as ra~at ea7~lair~ed elsewhere irE the Cc:ntraca 1ocuments, inser•P Mere prUlTisaan~s.far-sueh redtectic7n or lir~natatiUn.) ARTICLE 6 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Cantractar when (1 }the Cantract has been. fully performed by the Contractor except far the Contractor's responsibility to correct nonconforming Work as provided in Section 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessarily survive final payment, and (2} a final Project Certificate for Payment has been issued by the Construction Manager and Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the final Praject Certificate for Payment, ar as follows: After the Cantractar has satisfactorily completed all non-conformed work, fulfilled all final class-out requirements in accordance with the Contract Documents. ARTICLE 7 MISCELLANEOUS PROVISIONS 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. ~ 7.2 Payments due and unpaid under the Cantract shall bear interest from the date payment is due at the mite stated below, ar in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Iytsert role of interest agreed upc7rt, of atay.} At legal rate of interest as set. by 1Vlinnesata Statutes. (Usu7.y laws ata~d reejcaarenter2ts u~~der the Federal Truth, in Lending Act, sa7a2~ilar stcr~te arzd local cortsufner credit laws and other regr~lataons at the C)wner's and Coratrac~tor's prarzci~pal places of Ucr,caness, the location erf doe Project nand PJCPwl7PYP FYtRV ff ~t~P/'t tt7e VllllllltV (Jf tills n3Y1V1_C!(?yl, t,P (~/7l (1(~VI!_'P ,511()l(ll~ lIP (ll7ta172QC~ LF~'I tll 1"C..SDF.Ct t0 d[lE'ttl7f2S (Jr r~aodiftca~ti®rrs, and also regarding requirements saech as written disclosures or~ wail?ers.) § 7.3 Temporary facilities and services: (Here insert terrzpara~ry fac~~alaties arrd sen?ices whaeh are different from or in addataon~ to those atacluded elsewhere in fire Contract Doer~rnents.) This contractor is responsible far all temporary facilities as identified in the Praject Manual; including but not limited to: loading, unloading, materials storage and protection, layout, clean-up, hoisting, scaffolding, bracing, safety, barricades, guard rails, protection of Wark and surrounding Work, as specified. Location of site stored materials and temporary facilities shall be coordinated with the Construction Manager/Site Representative. § 7.4 Other Provisions: (Here last ar~y special provisions affecting the Cantract.) See R7€hibit A, attached, ARTICLE 8 TER INATION OR SUSPENSION § 8.1 The Cantract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. § 5.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions. Init. ' ~ doovsnent At©tlCf~aT"" - 1992. ~ora~pright Cc} 1992 by The American Institute of Architects. Alt righ :reserved. p;,ay I This document was produced by 4 / AIA software at 14:23:14 on 12/18/2008 under Order No.1000380482_1 which expires on 12/4/2009, and is not for resale. User Notes: (988380770) D~curr~~nt Title P~g~~ Division 0 Bidding and Contract 164 Requirements Division 1 General Requirements 38 § 9.1.4 The Specifications are those contained in the Project Manual dated as in Section 9.1.3, and. are as follows: (EiClaer list tlae Spec•i~e~rtiar2s Isere or r~Jer to rzea exaaib€t uttachecl t~> thfs A,~reemerxt. ) Title of Specifications exhibit: Prrsject Manual -Book 1, Phase Three - Brd Packages as prepared by Buetow and Associates, Inc. dated October 30, 3008 Project Manual -Book 2, Phase Three -Bid Packages as prepared by Buetow and Associates, Inc. dated October 30, 2008 9.1.5 The Drawings are as follows, and are dated October 30, 2008 unless a different. date is shown below: (Ei~tdrer list the ~)raw~itzgs I2ere crr refer to an ex6aibit attaclzetl to t)zis Agreernenl.) Title of Drawings exhibit: A0.0 Cover Sheet C2 Paving Plan (for reference -dated September 26, 2()08) A2.1 Lower bevel Floor Plan A2.2 Main Level Floor Plan A2.3 Mezzanine Floor Plan A2.4 Roof Plan A3.1 Building Elevation & Sections A3.2 Burld~ng Elevations A4.I Nall Sections A4.2 Wall Sections A43 Wall Sections A4.4 Wall Sections A4.5 Wall Sections A4.6 Stair & Elevator Sections & Enlarged Plans A4.7 Stair & Elevator Sections & Enlarged Plans A4.8 Stair Sections & Details A49 Details & List of Abbreviations A5.1 Enlarged Floor Plans A6.1 Interior Elevations A6.2 Interior Elevations Ati.3 Lobby Elevations & Enlarged Lobby Plans Afr.q Interior Elevations & Details A7.1 Lower Level Reflected Ceiling Plan A7.2 Main Level Reflected Ceiling Plan A7.3 Mezzanine Reflected Ceiling Plan A8.1 Doer Schedule Init. "'A ~ocaament A10StCl aTA1-1992. Go~~riaftt O t 992 by The American Institute a( Architects. AIi rights re erved. This daeumsni was produced by ~ / AIA software at 14:23:14 on 12/18/2008 under Order No.1000380482_1 which expires on 12/4/2009, and is not for resale. User Notes: (988380770) A8.2 Door and Frame Details F1. t Lower Level Furniture Pian (for reference only} F1.2 Main Level Furniture Plan (for reference only} Sl General Notes & Details S2 Foundation/Basement Plan S3 Main Level Framing Plan S4 Low Roof/Mezzanine Plan SS High Roof Plan S6 Sections S7 Sections S8 Sections S9 Sections S 10 Details SI 1 Arched Opening Details MSI.I Site Plan -Geothermal Wells and Plumbing M1.'1 Title Sheet M2. l Lower Floor Plan -Waste, Vent and Storm M2.2 Lower Floor Plan -Water and Gas M2.3 Main Floor Plan - Plumbing tV12.4 Mezzanine Floor Plan -Plumbing M3.1 Lower Floor Plan -Piping M3.2 Main Floor Plan -Piping M3.3 Mezzanine Floor Plan -Piping M4.1 Lawer Floor Plan -HVAC M4.2 Main Floor Plan -HVAC M4.3 Mezzanine Floor Plan -HVAC MS, l Roaf Plan M6.1 Schedules M7.1 Details M7.2 Details MB.I R1SerS M9.1 Building Section ES 1 Site Plan -Lighting El Lower Floor Plan -Power & Systems E2 Main Floor Plan -Power & Systems E2.'l Mezzanine Floor Plan -Power & Svstems E3 Lawer Floor Plan -Lighting E4 Main Floor Plan -Lighting E4.1 Mezzanine Floor Pian -Lighting E5 Schedules (Table deleted} E6 Schedules ~ 9.'6.6 The Addenda, if any, are as follows: Number Da#e Pages Addendum Number One November 19, 2008 37 Addendum Number Two November 20, 2C)08 l Addendum Number Three November 25, 2008 15 Portions of Addenda relating to bidding requirements are oat part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. 9.'1.7 Other documents, if any, forming part of the Contract. Documents are as follows: (I ist here urry additi~na~l docurne~zts whic/t are in~ter~rled to forr7t part of the Contract Lancuments. Tlae Ger2eral Conditions provide that bidding requirements such as advertiser~tent or invitation, to bid, Instructions to &idd~rs, Init. AEA tocument A101fCrdle1RA - 1992. C.;i~yrig9rY ~ 1992 by The American Institute of Architects. AE[ r~!~hts reserrred. This document was produced by 6 / AIA software at 14:23:14 on 12/18/2008 under Order No.1000380482_i which expires on ~ `L/4/2009, and is not for resale. User Notes: (988380770) scenaple forms arad tFae Contrcaetvr's bid are not part of doe Contract flocunaents unless enumerated in. this Agr~eerrxera.t. 7~aey sFaoaald Fie listed !acre only if intended to he part of t6ae contract I3vc'aerraents.) 'This Agreement entered intca as of ttte day and year first writtea~ above. ~d Gary -~l ~~~ ~~ Bate Init. A6A Uocueraent "10i/C a - 1992. Co~•°raght O i 992 by The American stitute oP Architects. A61 rica s reserved. s / AIA software at 14:23:14 on 12(18!2008 under Order No.1000380482_i which expires on 12/4/2009, and is not for resale. User Notes: This document was produced by (988380770} 7 I IT T /C T T G E T C I. B ~IEIGI~TS I'U LIC S Y CENTS C ICU I TS, INN T Within five (5) working days after award of the Contract, this Contractor must submit to the Construction Manager, a list of materials, products, equipment, materials suppliers and subcontractors they will use to perform their portion of the project. 2. Within five (5) working days and prior to starting work on site, this Contractor must submit Insurance Certificates for the project in the amounts detailed in Specification Section 00810 -Supplemental and Special Conditions to General Conditions of the Contract for Construction. The Owner, Architect, and EDS Builders shall be named as additional insureds. 3. Within five (5) working days after award of the Contract, this Contractor shall submit a detailed schedule showing material deliveries, major work items, working periods and projected completion of the contracted portion of the work. The Contractor's schedule shall be in accordance with Schedule Section 00210, unless otherwise noted in this agreement. 4. Within five (5) working days after award of the Contract, this Contractor shall provide a typed schedule of values on AIA Document G703 - Schedule of Values, with breakdown of material and labor as directed by the Construction Manager, and in compliance with Article 5.4 of this Contract. 5. Within five (5) working days after award of the Contract, and prior to beginning work on-site, this Contractor must submit its safety program to the Construction Manager for review. 6. Prior to beginning work on-site, this Contractor shall submit to the Construction Manager's site office, material safety data sheets for alI applicable materials to be used on-site. 7. The Contractor shall coordinate its safety program with that of the other Contractors on the site as specified in the Contract Documents including all Government regulatory agencies having jurisdiction on this project. 8. Inclusions and/or exclusions noted in the Contractor's proposal are nat included unless specifically stated in this agreement. 9. Contract Sum stated in Article 4.1 includes the cast of all necessary or required insurance, permits, sales tax (if applicable), royalties; patents, etc. ~~ ~~~ - -~ ,. d ~ ®T~ -1992 ~.. _ .. _ ' t. d® ' s PROJECT ('Nome and addressi: Columbra Heights i'ublic Safety Center 875 41st Avenue Northeast Columbia Heights, MN 5.5421 TO CONT CTOR ('?4'a~rncr and addres~st: Crosstown Masonry. Inc. 1322 159th Avenue NE Haffn Lake, MN 55304 CHANGE ORDER NUMBER: 027 CH3- 04-1-1 INITIATION DATE: June 30, 2009 PROJECT NUMBERS: BA 0806 / CONTRACT DATE: December 8, 2008 CONTRACT FOR: CH3-04-1 Masonry GVIINER: GC}NSTRUGTfON MANAGER: ~ ARCHITEGT: ~ GGNTRAGTOR: ~ FIELC: ~ CITNER: THE CONTRACT IS CHANGED AS FOLLOIdVS: I ~bor and material to demo wood enclosure and patch daonvay Ol}4A. Labor and materials to brick patch rain leader at Room I l'}5 and sprinkler holes in the basement wall. I.,ahor and material. to install netic chase and patch brick at Room (}06. "I~he original Contract Sum was Net change by previously authorized Change E)rders The Contract Sum prior to this Change C)rder vas The C-ontract Sum will be increased by this Change Order in the amount ol" The new Contract Sutn including this Change Order will be The Contract Time will be unchanged by Zero((}'l days. The date of Substantial Completion as of the elate of this Change C}rder therefore is Acid 9s 738.E}0 Add $ 166.0(} Add $1.264.f}l} '1"atal Add X2,1 f}8,(}(} 1,085,000.00 0.00 1,085,000.00 2,168.00 1,087, 168.00 NOTE: This summary does not reflect changes in the Contract. Sum, Contract Time or <iuaranteed Maximum Price which have been authorized by Construction Change Directive. NOT JALID UNTIk SIGNED B~ THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR. F.DS Builders. Inc Crosst<>um Masonry, lnc. CONT CTOR (Firm ncnnet 1322 159th Avenue NE, Hare Lake, MN 55304 AD RESS ~~ , ~. B ignature) t i r yped name DATE: .`~ ,~'~ BY (Sig~i:~ e) David Otds (Typed name) DATE: Buetow and Associates, Inc. ARCHITECT (Firm name) 2345 Mice eetv,Suite 210, St. P,il, MN 55113 ADDRESS ~ ~° 4 Citv of Columbia Hei:?hts AIA Document G701/CMaT"" --1952. Copyright O 1992 by The American Institute of Architects. All rights resenra*! L l may res a:z sn says ~~ " a ~ z € AiA software at 13:32:30 an 06130/2009 under Order No. i 000385206_i which expires on 01/i 9/2010, and is not for resale. User Notes: way n_,~. `s :u ~ c ,~ ~, This document was produced by (1198870826] 2322 259TB AVE N.E, Iv1 LA . Icrd SOTA 55304 (7G3) 434-~3?2 F (?63) 434-?693 April 2S, 2009 A.ttrr:tiv^.: rnr rgraifn, EIS 825 41 ~ A,ve. ATE Colt~bia I-I~~~hts, I~:I~,T 55421 RE: Columbia Heights Public Safety Facility EO #2157 -Time and mate.~ial to denoo waod er_iclosurc and patch doorway #OQ4.A. Materials $245 -d4 Bricklayer 3 hrs @ $65.Oa $195.00 Foreman 1. hrs a~ X72.00 $ 72.00 Laborer. 2 hrs a~ $59.00 $1.1$.00 49er .5 hrs @ $63.00 $ 31.00 P8t0 10% $ G6.00 Bond $ 11,00 TQTAL ADU X738.00 If you have any questions or concerns, please feel free to contact rne. S.sncc:°ely, . ~ ~~ Jay Bird Crosstown Masonry Incorporated 0612312~~9 10: C~4 763434?693 CRO~STO~f~t NtASQt~lf~V PAGE 0212 ~~~ ~ 1322 159 A Lid N.E. L , C3'X° 55304 3une 23, 2009 r-`~tiention: voc r~itb. .ED'S 825 41 "Ave. NE Columbia Heights, .. 5S42I Imo: Columbia Heights Public Safety Facility (763} 434.6371. p,,X (763} 434®7693 CWO #2159 -Brick patch rain water leader at room 105 and sprinkler holes in the basezxzent 1. Materials $ 1.5.0(1 Bricklayer 2 hrs ~~7.00 $134,00 P~c~ ~0~~® ~ ls.ao Bond 2.a0 Tt~T~L, ADD $I~~,pO If you have any questions or concerns, please feel free to contact me. S.tneerely, Jay Bir. d Crosstown Masonry Incorporated a5/2902~~9 1~60~i 7E~34347693 CR0~5T~WP~ MASCth~RY PAGE 621~t2 ~~ , ~~rt,-:. 1322 159 AVM l~t.~. ~ ~ C}'X°`~ 55304 (7G3~ 434-637 F (763) d34-7693 J e 23, 2009 Atte'iti.an: Dac Smith SOS $2S 41~.Ave.1~FE Columbia Heights, 55421 RE: Columbia k~eights Fublic Safety Facz).ity EWO #2155 -New chase wall and patching brick at room 006. Materials $ 165.00 Bricklayer. 6.5 hrs a~ $57.00 ~ 435.00 Laborer 5 tars ~ X61.00 ~ 305.00 49er 3.5 hrs (7a $55.00 $ 227.00 P&O 10% 113.00 Bond 19•a~ TOTAL ADD $1,254.00 If you have any qucstic~rzs or concerxas, please feel. free to contact rrac. S inaerely, ~~~~ Jay Bird Crosstown Masonry T.ncorporated .~ t ~. ~ - ~, - ~ T~ i ; X992 PROJECT ~sticurae and aclclt-es~s). Columbia 1-Ieights Public Safety Center 825 41 st Avenue Northeast Columbia Heiul~ts. MN 55421 TO CONTRACTOR {,TVana~ czrad cac7clress} Crosstown Masonry, lnc. 1322 159th Avenue NE Ham 1/ake, MN 55304 THE CONTRACT IS CHANGED AS FOLLOt~dS: Crosstown Masonry. loc. OWNER: ~ CONSTRUCTION I~~~va~l=~: ARCHITECT: CO"1TRACTOR: ~ FIELD: ^ OTHER: Supply and install anonument and seating walls with concrete cap similar to u>indow sills, see drawing A9.1 As agreed with Dave Olds. ' Add 18,891.00 The original C;ontraet `ium was $ 1_,085,000.00 Aiet change by previously authorized C'haalge Orders $ 2,168.00 l he Contract Sum prior to this C~:ange Order was $ 1,08'7,168.00 The Contract Sham will lx ii ~i by this Change Order in the amount o1~ $ 18,891.00 I'he new Contract Sum including this Change Order will be $ 1,106,059.00 The Contract Time will be unchanged by Gero (0} days. The date of Substantial Completion. as of the date o1`this Change Order theref`csre is NOTE: `Phis sunm7~tr}~ does not reflect changes in the C'vntract Sum, Contract 'l'ime ar Guar~trtteed Maximum Price which have been authorized by Construction Change Directive. NOT VALiD UNTIL SIGNED BY THE OV~NER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR.. Buetow and Associates, Inc. CHANGE ORDER NUMBER: 031 CH3- 04- I -2 INITIATION DATE: July fi, 2009 PROJECT NUMBERS: BA 080b / CONTRACT DATE: December 8, 2008 CONTRACT FOR: CH3-04-1 Masonry City of Columbia Heisrhts AIA Document G701/CMaTM ~-1992. Copyright ~ 1992 by The American Institute of Architects. A61 rigtvts reserved..„. ° " L I t i n , AIA software at 14:06:50 on 07/06/2009 under Order No.1000385206_1 which expires on 01/19!2010, and is not for resale. User Notes: a~ ~ ~ This Document was produced by (2002144561) •. ~' (9 ' Ct7"i~ ~iZ~E i 13?2 159TH AVENUE N.E. H'RM L M1~INESC3TA 55304 (763) 434-6371 F' (763) 434-7693 June 22, 2009 Attention: Dac Smith EI3S 825 41 ~` Ave. hlE Columbia sleights, MN 554? 1 RE: Columbia Heights Public Safety Facility Price for one onuanen.t sign and t~rro seating walls- Price includes excavation, Precast caps, block, brick, rebar a.nd concrete. Excludes statues, plagues and balustrades. Monument Sign: Materials $2,770.00 Ld~~r $4,8s0.ao P&O 10% $ 765.00 Bond 126.00 TOTAL ADD $8,541.00 ~' Seating Walls: Materials $ 4,920.00 Labor $ 4,350.00 P&O 10% $ 9`17.00 Bond $ 153.00 TOTAL ADD $10,350.00 rf you have any quLstions or concerns, please feel flee to contact tne. Sincerely, ~~ Jay Bird Crosstown Masonry Incorporated L~/LO SJbd hdNOSdW NMC11SS0~4~ S6SLGEb£9G Z~:SZ 69dZ/~ZI9~ ZI ~ ~Z ~, 4 ~ ,:- , r~ -199z ~.. _ , ~d- ~ ~ ~ ~~ ~ ~ ; PROJECT !:Fame arzd address): Columbia Heights Public Safety Centez• 825 41st Avenue Norkheast Columbia I-!eights, SIN 55421 TO CONTRACTOR (!"cznae azld czrfdressi trosstown Pvlasonry, Inc. 1322 159th Avenue NE Ham I.alce, Mitt 55304 CHANGE ORDER NUMBER: 042 CH3- 04-1-3 INITIATION DATE: August 26, 2009 PROJECT NUMBERS: BA 0806 / CONTRACT DATE: Etec;ember 8, 2008 CONTRACT FOR: CH3-04-1 Masonry OWNER: CONSTRUCTION MANAGER: ARCHITECT: COP[TRACTOR: FIELCI: ^ OTHER: ^ THE CONT GT IS CHANGED AS FOLLOWS: Supply and install 4000 psi concrete topping between. the rails in Room ()10 Evidence; Steerage T'he original Contract Sum was Net change by previously authorized Change Cbrdez•s The Contract Sum prior to this Change t]rder was hhe Contract Sum will be increased by this Change 4}rdcr in the amount of The new (.: ontract Sum ilacixzdmg this Change E'":}rder will be The Contraet'I'ime will be unchanged b} Zero (0) days. I'he date of Substantial C'omgletion as of the date of this Change C}rder therefore is Add S3,ti03.00 1,085,000.00 21,059.00 l ,106,059.00 3,603.00 1,109,662.00 NOTE: °C~his summary does not reflect changes in the CacltracC Sum, C'arltraci 'l'imo or Guaranteed Maximum Price which Rave been authorized by Construction Change Directive. NOT VALID UNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR. EDS Httilders. Inc Buetow and Associates. Inc. ARCHITECT (Firm name) 2345 Rice Strom, Suite 210, St. Pay}1, MN 55113 ADDRESS s BY (Signlrhv~) David Olds -~° _ _ E (Typed name) DATE: Crosstown R~Iasozlrv. hrc. City of Columbia Heights OWNER (Firm name) 590 40th. Avenue Northeast, Columbia Heights,lVlN 55421.-3878 ADDRESS BY (Signature) Walter Fehst (Typed name) f'~ATE: AIA Document C,7011CMaTM -1992. Copyright Q 1992 by The American Institute of Architects. A!1 roghts reserved. ' ,~, r ..,t. ~v~ -, n AIA software at 15:05:08 on 08/26/2009 under Urder No.1000385206_1 which expires on 01(1912010, and is not for resale. User Notes: `~ 1 This document was produced by (1836004405} 44 J~, 6 ~~ ~' 404A Saint Croix Trail North ° Lakeland, Minnesota 55043 ° Phone: 651-436-2426 1821 University Avenue Suite 204-5 ° St. Paul, Minnesota 55104 ° Phone: 651-998-0332 Fax: 651-436-3918 e-mail: info@edsbuilders.com ° www.edsbuiiders.com FI L DATE: August 3, 2009 ~'O #47 PROJEC'T`: Columbia I~eigr~ts Public Safety Center 825 418 Avenue NE Columbia Heights, MN 55421 VENDOR: Crasstawn Masanry -Jay Bird 1322 159 Avenue NE Ham Lake, Ml`d 55304 Phone: 763-434-6371 1~`ax: 763-434-7693 CC. Dave Olds, Larry Pepin, Gary Gorman You are hereby aazthonzed to execute prcaptly this Meld Order directive per the enclased description and ail applicable provisions of the General, Supplemental, and Special Conditions? Addenda; and all other Contract documents. ~uPP~Y ~3.~.cz ~ns~ati ~-uvu psi concrete tapping between the rails in Raom 010 Evidence Starage, 2" x 24' x 3l' for $3,603.00, If you have any questions regarding this faeld order, please cantact Dac Smith at 651-436- 2426 ar 612-747-0976. ~ ~rE Project Manager: ;~-:~_4 x~,~~- ,_ ~ ~y' ~ #r~ ~ ~~~ C> ~. ~ ;° ,, Earl Doc Smith Date c..rS,IJ~~ 4 tJWi''§ St'2F-1`J~J(`~~~!` P~t~E QZl@~ g ~p -_T~ I A ~F~ k 5,7 tg k r.1m:. I" r n D.rodl.[Y"S"..,.34,~ t ~3~®6 ._..._.. .iuly Z~, 2449 attention: T.~~c zitl~ t°~Ts n 825 41 ~` A:ve. ~olurs~bia Heights, 5542I RE: ~akutaabi.a Heights Public safety. F~eility Price to pour a 2"x24'x3I ; taping at the fsle storage room. (763} 434-5~'7f F 0763} 43~-763 524. ~4 I ,952,40 323.C1t~ 48.40 ~,6ti~.C~O Ifi you have azay questions or cozscecz:s, please feel free to contact me. sincerely, ,~ .7 F,~_.V bird. Cxacstcs~vn Masonry lz7corporated