Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: January Operational Report
Date: January 27, 2009
COLLECTION PROJECTS
I.
Magazines
A. : Magazine labels were typed for newly received magazines.
ACL Weeding:
B. Last copies of materials within Workflows that Columbia Heights
owns the last copy of were found and withdrawn. Others were then used on the Book
Sale Cart.
th
Damaged Shelf:
C. The Damaged shelf was checked and cleaned up on January 15
st
and January 21.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on January 14.
th
Air Fresheners:
B. Fresheners were replaced on January 14.
th
Fire Extinguishers:
C. Fire extinguishers were checked on January 14.
Public Works:
D. Public Works was in the Library for a number of projects. They
came in to replace a faulty faucet in the Work Room and they took various items of trash
from us that have accumulated over the years. They also installed a new Brochure rack
th
near the back entrance on January 26.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained.
Paperback Display:
B. Maintained a paperback display for the month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to employee’s for their records and/or use.
Bulletin Board:
D. The Bulletin board was maintained and cleaned this month.
Book Sale Cart:
E. The Book Sale was filled and cleaned this month. New books were
added to it.
th
Year End:
F. The Year End project was completed January 6.
Page Progress forms:
G. New and updated progress forms for various page projects
thth
were completed on January 8 and January 12.
rg