HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: November Operational Report
Date: November 25, 2008
COLLECTION PROJECTS
I.
Magazines
A. : Magazine labels were typed for newly received magazines.
ACL Weeding:
B. Last copies of materials within Workflows that Columbia Heights
owns the last copy of were found and withdrawn. Others were then used on the Book
Sale Cart.
th
Damaged Shelf:
C. The Damaged shelf was checked and cleaned up on November 5 .
Paperback Weeding:
D. Weeding of the Romance and Fiction paperbacks was done
again this month. This was done in order to catch any potentially bad books that were
missed previously.
th
Paperback Order:
E. A paperback order was completed and sent November 17 .
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on November 12.
th
Air Fresheners:
B. Fresheners were replaced on November 12.
th
Fire Extinguishers:
C. Fire extinguishers were checked on November 12.
Lighting Maintenance:
D. An extensive maintenance of light bulbs, light fixtures and
other electrical work was performed this month by Heights Electric.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained.
Paperback Display:
B. Maintained a paperback display for the month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to employee’s for their records and/or use.
th
Radio Flyer wagon:
D. The Radio Flyer red wagon was assembled November 24. It
is being used as a prize for a drawing being held at the Library’s Open House.
rg