HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: August Operational Report
Date: August 26, 2008
COLLECTION PROJECTS
I.
Magazines
A. : Magazine labels were typed for newly received magazines.
ACL Weeding:
B. Last copies of materials within Workflows that Columbia Heights
owns the last copy of were found and withdrawn. Others were then used on the Book
Sale Cart.
Paperback Weeding:
C. The Fiction Paperbacks have been weeded.
th
Damaged Shelf:
D. The Damaged shelf was checked and cleaned up on August 5 and
th
August 20 .
Hudson Maps:
E. The Hudson Maps process was completed and they will be ordered
th
on August 26.
th
Paperback Order:
F. Paperback orders were completed on August 5 and August
th
19.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on August 14.
th
Air Fresheners:
B. Fresheners were replaced on August 14.
th
Fire Extinguishers:
C. Fire extinguishers were checked on August 14.
Painting:
D. The main floor lobby was painted by R.W. Ceilings and Walls on Friday
nd
August 22 during Staff Day.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained.
Paperback Display:
B. Maintained a paperback display for the month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to employee’s for their records and/or use.
Mail holder:
D. The basket used to hold our files for office mail was assembled
th
August 18.
rg