HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: September Operational Report
Date: September 30, 2008
COLLECTION PROJECTS
I.
Magazines
A. : Magazine labels were typed for newly received magazines.
ACL Weeding:
B. Last copies of materials within Workflows that Columbia Heights
owns the last copy of were found and withdrawn. Others were then used on the Book
Sale Cart.
Damaged Shelf:
C. The Damaged shelf was checked and cleaned up on September
th
19 .
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on September 16.
th
Air Fresheners:
B. Fresheners were replaced on September 16.
th
Fire Extinguishers:
C. Fire extinguishers were checked on September 16.
Painting:
D. The main floor lobby was repainted in a few small areas by R.W. Ceilings
th
and Walls on September 16.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained.
Paperback Display:
B. Maintained a paperback display for the month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to employee’s for their records and/or use.
rg