Loading...
HomeMy WebLinkAboutOperational Report for Ramon To: M. Rebecca Loader, Library Director From: Ramon Gomez, Library Clerk Subject: September Operational Report Date: September 30, 2008 COLLECTION PROJECTS I. Magazines A. : Magazine labels were typed for newly received magazines. ACL Weeding: B. Last copies of materials within Workflows that Columbia Heights owns the last copy of were found and withdrawn. Others were then used on the Book Sale Cart. Damaged Shelf: C. The Damaged shelf was checked and cleaned up on September th 19 . MAINTENANCE PROJECTS II. th Security Gates: A. Filters were cleaned on September 16. th Air Fresheners: B. Fresheners were replaced on September 16. th Fire Extinguishers: C. Fire extinguishers were checked on September 16. Painting: D. The main floor lobby was repainted in a few small areas by R.W. Ceilings th and Walls on September 16. MISCELLANEOUS III. ILL Drawer: A. The ILL drawers were maintained. Paperback Display: B. Maintained a paperback display for the month. Month End Statistics: C. The statistics for the previous month were totaled and then distributed to employee’s for their records and/or use. rg