HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: June Operational Report
Date: June 24, 2008
COLLECTION PROJECTS
I.
Magazines
A. : Magazine labels were typed.
ACL Weeding:
B. Last copies of materials within Workflows that Columbia Heights
owns the last copy of were found and withdrawn.
Paperback Weeding:
C. The Romance and Science Fiction/Fantasy Paperbacks have
been weeded.
th
Paperback Order:
D. A paperback order was processed this month on June 24.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on June 11.
th
Air Fresheners:
B. Fresheners were replaced on June 11.
th
Fire Extinguishers:
C. Fire extinguishers were checked on June11.
th
Blinds Cleaning:
D. The blinds were picked up June 24 for cleaning.
Light Bulbs:
E. Public Works came out to change sixty light bulbs in the various main
floor rooms. There were more to change but time and spare bulbs did not allow it. They
also found 5 potentially bad ballasts. Heights Electric was then called in to look at them
and see if repair was needed.
MISCELLANEOUS
III.
ILL Drawer:
A. The ILL drawers were maintained and the last of the hard copy paper
work is almost gone.
Paperback Display:
B. Maintained a paperback display for the month.
Month End Statistics:
C. The statistics for the previous month were totaled and then
distributed to employee’s for their records and/or use.
New Book Signs:
D. Signs for the various types of New Books were created and
displayed next to their appropriate areas.
rg