Loading...
HomeMy WebLinkAboutOperational Report for Ramon To: M. Rebecca Loader, Library Director From: Ramon Gomez, Library Clerk Subject: March Operational Report Date: March 25, 2008 COLLECTION PROJECTS I. Magazines A. : Magazine labels were typed. Fodor’s Order: B. The Fodor’s order has been reviewed and has also been found to be missing several titles. This is currently being worked on and will solve future problems if they should occur. Locations Project: C. The Mystery section is being worked upon and is going very well. ACL Weeding: D. Last copies of materials within Workflows that Columbia Heights owns the last copy of were found and withdrawn. Paperback Weeding: E. Paperbacks in bad condition were weeded out of the collection. MAINTENANCE PROJECTS II. th Security Gates: A. Filters were cleaned on March 25. th Air Fresheners: B. Fresheners were replaced on March 25. th Fire Extinguishers: C. Fire extinguishers were checked on March 25. Public Works: D. Public Works came out to fix the toilet in the Lower Level which was having problems running at random times. Fire Exit Lights: E. The light bulbs within the fire exit signs around the building were th checked and replaced March 25. MISCELLANEOUS III. ILL Drawer: A. Drawers were maintained. Paperback Display: B. Maintained a paperback display for the month. Misc.Jobs: C. The new stool received for desk work was setup. Also a new DVD player was setup in the Activity Room. Month End Statistics: D. The statistics for the previous month were totaled and then distributed to employee’s for their records and/or use. rg