HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: February Operational Report
Date: February 26, 2008
COLLECTION PROJECTS
I.
Withdrawn Items
A. : Items were withdrawn from the system and recycled.
Magazines
B. : Magazine labels were typed.
Damaged Item Shelf:
C. The Damaged Item shelf was checked and cleaned up.
Locations Project:
D. The Mystery Genre section of this project has been started
(books being looked for) and is under way.
thth
Paperback Order:
E. A paperback order was completed February 12 and 13.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on February 15.
th
Air Fresheners:
B. Fresheners were replaced on February 25.
th
Fire Extinguishers:
C. Fire extinguishers were checked on February 25.
Public Works:
D. Public Works came out to reposition the Friends Display case from
the East room to the Adult Reading room. They also dismantled and threw away the old
shelving that was formerly stationed by the internet computers. They also took down our
Museum Adventure Pass banner from the front of the building due to damages.
Heights Electric:
E. Heights Electric came out to install new power plug ins in the
East Room to allow laptop users to use their computers longer without having to worry
about battery life.
MISCELLANEOUS
III.
ILL Drawer:
A. Drawers were maintained.
Paperback Display:
B. Maintained a paperback display for the month.
ACL Last Copies:
C. Last Copies of books Columbia Heights owns were withdrawn.
Furniture:
D. Discarded furniture that was on the fixed assets list were removed.
rg