Loading...
HomeMy WebLinkAboutOperational Report for Ramon To: M. Rebecca Loader, Library Director From: Ramon Gomez, Library Clerk Subject: January Operational Report Date: January 27, 2008 COLLECTION PROJECTS I. Withdrawn Items A. : Items were withdrawn from the system and recycled. Magazines B. : Magazine labels were typed. Damaged Item Shelf: C. The Damaged Item shelf was checked and cleaned up. Locations Project: D. Items in the Science Fiction and Westerns section of this project were finished in hardcover form. th Paperback Order: E. A paperback order was completed January 15. MAINTENANCE PROJECTS II. th Security Gates: A. Filters were cleaned on January 11. th Air Fresheners: B. Fresheners were replaced on January 11. th Fire Extinguishers: C. Fire extinguishers were checked on January 11. Public Works: D. Public Works came out to dismantle two study stations in the library and then switched them around. MISCELLANEOUS III. ILL Drawer: A. Drawers were maintained. Paperback Display: B. Maintained a paperback display for the month. ACL Last Copies: C. Last Copies of books Columbia Heights owns were withdrawn. Year End: D. Year End statistics were counted up and recorded. rg