HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: January Operational Report
Date: January 27, 2008
COLLECTION PROJECTS
I.
Withdrawn Items
A. : Items were withdrawn from the system and recycled.
Magazines
B. : Magazine labels were typed.
Damaged Item Shelf:
C. The Damaged Item shelf was checked and cleaned up.
Locations Project:
D. Items in the Science Fiction and Westerns section of this project
were finished in hardcover form.
th
Paperback Order:
E. A paperback order was completed January 15.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on January 11.
th
Air Fresheners:
B. Fresheners were replaced on January 11.
th
Fire Extinguishers:
C. Fire extinguishers were checked on January 11.
Public Works:
D. Public Works came out to dismantle two study stations in the library
and then switched them around.
MISCELLANEOUS
III.
ILL Drawer:
A. Drawers were maintained.
Paperback Display:
B. Maintained a paperback display for the month.
ACL Last Copies:
C. Last Copies of books Columbia Heights owns were withdrawn.
Year End:
D. Year End statistics were counted up and recorded.
rg