Loading...
HomeMy WebLinkAboutOperational Report for Ramon To: M. Rebecca Loader, Library Director From: Ramon Gomez, Library Clerk Subject: November Operational Report Date: November 27, 2007 COLLECTION PROJECTS I. Withdrawn Items A. : Items were withdrawn from the system and recycled. Magazines B. : Magazine labels were typed. Damaged Item Shelf: C. The Damaged Item shelf was checked and cleaned up. Paperback Weeding: D. Paperbacks were weeded by section. They were checked against the database, withdrawn, and either put onto the book sale cart or discarded. Fodor’s: E. The Fodor’s order was completed and updated. MAINTENANCE PROJECTS II. th Security Gates: A. Filters were cleaned on November 14. th Air Fresheners: B. Fresheners were replaced on November 14. th Fire Extinguishers: C. Fire extinguishers were checked on November 16. Painting: D. The purchase requisition for painting various areas of the children’s department was completed and the work has been scheduled with R. W. Ceiling and Walls. Work Room Sink: E. Public Works was called out to unclog the sink in the upstairs Work Room. Upon their departure we had to call Olson’s Plumbing to come out and fix the total clog. Mouse: F. Orkin was called out numerous times to place traps and look for evidence of a mouse in the library. It was seen by a staff member. MISCELLANEOUS III. ILL Drawer: A. Drawers were maintained. Paperback/Hardcover Display: B. Maintained new paperback and hardcover display near the front desk featuring African American Authors. ACL Last Copies: C. Last Copies of books Columbia Heights owns were withdrawn. Gatecount Sheets: D. The new set of gatecount sheets for 2008 were started. rg