Loading...
HomeMy WebLinkAboutOperational Report for Ramon To: M. Rebecca Loader, Library Director From: Ramon Gomez, Library Clerk Subject: October Operational Report Date: October 29, 2007 COLLECTION PROJECTS I. Withdrawn Items A. : Items were withdrawn from the system and recycled. Magazines B. : Magazine labels were typed. Damaged Item Shelf: C. The Damaged Item shelf was checked and cleaned up. Hudson’s Maps: D. Hudson’s Maps were ordered for the departments. MAINTENANCE PROJECTS II. th Security Gates: A. Filters were cleaned on October 11. th Air Fresheners: B. Fresheners were replaced on October 24. th Fire Extinguishers: C. Fire extinguishers were checked on October 15 Public Works: D. Public Works was called to do maintenance on the library for hanging a new M.A.P. banner on the front of the building, installing a door stop and checking various light fixtures. General Maintenance Projects: E. Heights Electric was called to repair a light fixture in a janitors closet and remove and change a light bulb in a fixture also. Summit Fire Protection was called to come out and examine the sprinkler hardware. EMC Services was called out twice to look at and repair various parts of the urinal in the Men’s restroom. Beaver Caulking was called out to give a quote on doing stucco to brick caulking and general brick filling. R. W. Ceilings and Walls was called to come and give a quote on repainting parts of the children’s department. MISCELLANEOUS III. ILL Drawer: A. Drawers were maintained. Paperback/Hardcover Display: B. Maintained new paperback and hardcover display near the front desk featuring African American Authors. ACL Last Copies: C. Last Copies of books Columbia Heights owns were withdrawn. rg